Pleinmont Solar 1
TBD, Spotsylvania, VA 22551Plant Summary Information
Pleinmont Solar 1 is ranked #44 out of 192 power plants in Virginia in terms of total annual net electricity generation.
Pleinmont Solar 1 generated 35.1 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Pleinmont Solar 1 |
---|---|
Utility Name | AES Distributed Energy |
Location | Spotsylvania County, VA |
Initial Operation Date | October 2020 |
Last Update | Mar 2024 |
Annual Generation | 156.4 GWh |
Annual Consumption | 533.8 k MMBtu |
Ranked #2,611 out of 11,249 Power Plants Nationwide | |
Ranked #339 out of 5,158 Solar Power Plants Nationwide | |
Ranked #44 out of 192 Virginia Power Plants | |
Ranked #10 out of 76 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pleinmont Solar 1 LLC (2018 to 2019) AES Distributed Energy (2020 to 2022) |
Map of Pleinmont Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pleinmont Solar 1.
Monthly Net Generation for Pleinmont Solar 1
Pleinmont Solar 1 Details
Summary Information | |
---|---|
Plant Name | Pleinmont Solar 1 (62012) |
Plant Address | TBD Spotsylvania, VA 22551 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 38.24712, -77.78622 |
Generation Dates on File | Oct 2020 to Mar 2024 |
Initial Operation Date | October 2020 |
Annual Generation | 156.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator PLNM1 Details Operating October 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 99.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pleinmont Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#329 | Chestnut Solar | Enfield, NC | 159.3 GWh |
#330 | Solar Star California, XLI, LLC | Rosamond, CA | 158.7 GWh |
#331 | Palmer Solar | Fountain, CO | 158.7 GWh |
#332 | Lakeside Solar Center | Okeechobee, FL | 158.5 GWh |
#333 | Edwards Sanborn E5 | Mojave, CA | 157.8 GWh |
#334 | NC 102 Project LLC | Midland, NC | 157.5 GWh |
#335 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 157.0 GWh |
#336 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 154.3 GWh |
#337 | Discovery Solar Center | Merrit Island, FL | 156.9 GWh |
#338 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 156.6 GWh |
#340 | Route 66 Energy Center, LLC | San Fidel, NM | 156.4 GWh |
#341 | Interstate Solar Energy Center | Ft. Pierce, FL | 156.4 GWh |
#342 | Grasshopper Solar | Chase City, VA | 156.3 GWh |
#343 | Chaves Solar, LLC | Roswell, NM | 156.2 GWh |
#344 | White Oak Solar, LLC | Waynesboro, GA | 156.2 GWh |
#345 | Sawgrass Solar Energy Center | Clewiston, FL | 156.2 GWh |
#346 | Cotton Creek Solar Energy Center | McDavid, FL | 156.1 GWh |
#347 | Cattle Ranch | Arcadia, FL | 155.9 GWh |
#348 | Lumina Solar Project | Snyder, TX | 155.8 GWh |
#349 | Midlands | St. Matthews, SC | 155.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pleinmont Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Stafford | Stafford, VA | 4.1 GWh | 22.3 mi |
Desper Solar | Louisa, VA | 133.3 GWh | 21.2 mi |
Electric Avenue Facility | Culpeper, VA | 677.4 MWh | 10.9 mi |
Energix Nokesville, LLC | Nokesville, VA | 1.6 GWh | 31.2 mi |
Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh | 24.2 mi |
Highlander Solar Energy Station 1 | Spotsylvania, VA | 331.9 GWh | 0 mi |
Ladysmith | Woodford, VA | 879.5 GWh | 19.1 mi |
Louisa Generation Facility | Gordonsville, VA | 245.6 GWh | 24.9 mi |
Marsh Run Generation Facility | Remington, VA | 345.7 GWh | 19.5 mi |
Martin Solar Center | Kents Store, VA | 10.4 GWh | 29.1 mi |
MM Prince William Energy | Manassas, VA | 51.9 GWh | 33.7 mi |
North Anna | Mineral, VA | 16.6 TWh | 12.9 mi |
Palmer Solar Center | Troy, VA | 11.7 GWh | 31 mi |
Pleinmont Solar 2 | Spotsylvania, VA | 510.9 GWh | 0 mi |
Possum Point | Dumfries, VA | 2.4 TWh | 33.9 mi |
Remington | Remington, VA | 717.3 GWh | 20.5 mi |
Remington Solar Facility | Remington, VA | 36.9 GWh | 20.8 mi |
Richmond Spider Solar | Spotsylvania, VA | 36.5 GWh | 0 mi |
Waste Management King George LFGTE | King George, VA | 88.4 GWh | 26 mi |
Whitehouse Solar Farm | Louisa, VA | 29.7 GWh | 18.5 mi |