Pleasant Hill Solar
1188 Hoiser Road, Suffolk, VA 23434Plant Summary Information
Pleasant Hill Solar is ranked #69 out of 94 solar farms in Virginia in terms of total annual net electricity generation.
Pleasant Hill Solar generated 7.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pleasant Hill Solar |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Suffolk city, VA |
Initial Operation Date | June 2023 |
Last Update | Dec 2023 |
Annual Generation | 20.7 GWh |
Annual Consumption | 70.5 k MMBtu |
Ranked #5,021 out of 11,835 Power Plants Nationwide | |
Ranked #1,166 out of 5,643 Solar Power Plants Nationwide | |
Ranked #131 out of 211 Virginia Power Plants | |
Ranked #69 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Pleasant Hill Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pleasant Hill Solar.
Monthly Net Generation for Pleasant Hill Solar
Pleasant Hill Solar Details
Summary Information | |
---|---|
Plant Name | Pleasant Hill Solar (65220) |
Plant Address | 1188 Hoiser Road, Suffolk, VA 23434 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 36.6922, -76.57856 |
Generation Dates on File | Jun 2023 to Dec 2023 |
Initial Operation Date | June 2023 |
Annual Generation | 20.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 23-2 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator PHSPV Details Operating June 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Lenses Mirrors | No |
---|---|
Bifacial | Yes |
Other Solar Technology | Yes |
DC Net Capacity | 26.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pleasant Hill Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1156 | Albany Solar | Albany, MN | 21.0 GWh |
#1157 | Camp Lejeune Solar and Energy Storage | Camp Lejeune, NC | 21.0 GWh |
#1158 | Waseca Solar | Waseca, MN | 20.9 GWh |
#1159 | KIUC Kapaia PV and BA Storage Project Hybrid | Lihue, HI | 18.9 GWh |
#1160 | Cherry Blossom Solar LLC | Hemingway, SC | 20.9 GWh |
#1161 | Leon Solar | Greenville, TX | 20.8 GWh |
#1162 | Vale Air Solar Center, LLC | Vale, OR | 20.8 GWh |
#1163 | Hertford Solar Power, LLC | Ahoskie, NC | 20.7 GWh |
#1164 | TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh |
#1165 | Suntex Solar, LLC | Riley, OR | 20.7 GWh |
#1167 | Fort Valley State University Solar | Fort Valley, GA | 20.6 GWh |
#1168 | Fort Detrick Solar PV | Frederick, MD | 20.6 GWh |
#1169 | Paynesville Solar | Paynesville, MN | 20.5 GWh |
#1170 | Duane Arnold Solar I (50 MW) | Palo, IA | 20.3 GWh |
#1171 | Black Mountain Solar LLC | Golden Valley, AZ | 20.3 GWh |
#1172 | West Gates Solar Station | Huron, CA | 20.2 GWh |
#1173 | SR Washington I, LLC | Jonesborough, TN | 20.2 GWh |
#1174 | Whitewright Solar | Whitewright, TX | 20.2 GWh |
#1175 | Clear Spring Ranch PV Project | Fountain, CO | 20.2 GWh |
#1176 | Aspiration G | Cantua Creek, CA | 20.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pleasant Hill Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bedford Solar | Chesapeake, VA | 108.4 GWh | 22.9 mi |
Caden Energix Hickory LLC | Chesapeake, VA | 58.5 GWh | 21.8 mi |
Chesapeake | Chesapeake, VA | 178.0 MWh | 16.3 mi |
Chesapeake Solar Project | Chesapeake, VA | 162.6 GWh | 15.6 mi |
Downtown | Franklin, VA | 232.0 MWh | 19 mi |
Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh | 16 mi |
Gates Solar LLC | Eure, NC | 9.0 GWh | 20.8 mi |
Grassfield Solar | Chesapeake, VA | 41.0 GWh | 13 mi |
International Paper Franklin Mill | Franklin, VA | 254.3 GWh | 18.5 mi |
Morgan's Corner | Elizabeth City, NC | 28.3 GWh | 22.2 mi |
Pretlow | Franklin, VA | 231.0 MWh | 19.4 mi |
SoINCPower6, LLC | Sunbury, NC | 10.5 GWh | 17.2 mi |
Solidago Solar | Windsor, VA | 15.9 GWh | 15.5 mi |
Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh | 2.4 mi |
Sugar Run Solar | Sunbury, NC | 9.9 GWh | 17.6 mi |
TWE Myrtle Solar Farm, LLC | Suffolk, VA | 20.7 GWh | 8.4 mi |
Virginia Beach | Virginia Beach, VA | 4.2 GWh | 21.8 mi |
Western Branch High School | Chesapeake, VA | 1.1 GWh | 14.4 mi |
Wheelabrator Portsmouth | Portsmouth, VA | 35.6 GWh | 17.2 mi |
Woodland Solar Farm | Smithfield, VA | 30.0 GWh | 13.8 mi |