Pitkin County Solar
90 Stevens St, Aspen, CO 81611Plant Summary Information
Pitkin County Solar is ranked #29 out of 130 solar farms in Colorado in terms of total annual net electricity generation.
Pitkin County Solar generated 3.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Pitkin County Solar |
---|---|
Utility Name | Coolangatta Solar LLC |
Location | Pitkin County, CO |
Initial Operation Date | October 2021 |
Last Update | Dec 2022 |
Annual Generation | 12.0 GWh |
Annual Consumption | 42.5 k MMBtu |
Ranked #5,560 out of 11,249 Power Plants Nationwide | |
Ranked #1,306 out of 5,158 Solar Power Plants Nationwide | |
Ranked #117 out of 250 Colorado Power Plants | |
Ranked #29 out of 130 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Pitkin County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pitkin County Solar.
Monthly Net Generation for Pitkin County Solar
Pitkin County Solar Details
Summary Information | |
---|---|
Plant Name | Pitkin County Solar (65084) |
Plant Address | 90 Stevens St Aspen, CO 81611 |
Utility | Coolangatta Solar LLC (64487) |
Latitude, Longitude | 39.24771, -106.87681 |
Generation Dates on File | Oct 2021 to Dec 2022 |
Initial Operation Date | October 2021 |
Annual Generation | 12.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF21-1072 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Holy Cross Electric Assn, Inc (8773) CO |
Grid Voltage | 24.90 kV |
Energy Storage | No |
Generator PTKN Details Operating October 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 6 MW |
Other Materials | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pitkin County Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Pocket Solar Master Lessee LLC | 1901 Harrison Street, Suite 1600, Oakland, CA 94621 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1296 | RE McKenzie 2 LLC | Galt, CA | 12.2 GWh |
#1297 | Riverside Renewable Energy LLC | Gloucester City, NJ | 12.2 GWh |
#1298 | Richmond Solar Park 3 | Richmond, IN | 12.1 GWh |
#1299 | Gemini Solar | Unincorporated, NV | 12.1 GWh |
#1300 | Port Allen Solar | Eleele, HI | 12.1 GWh |
#1301 | Wonderful Orchards - Belridge | Lost Hills, CA | 12.1 GWh |
#1302 | OCI Alamo 3 LLC | San Antonio, TX | 12.1 GWh |
#1303 | ANAD Solar Array | Anniston Army Depot, AL | 12.0 GWh |
#1304 | SCE&G Springfield CSG | Springfield, SC | 12.0 GWh |
#1305 | AFA Solar Farm | Colorado Springs, CO | 12.0 GWh |
#1307 | Frankford Solar | Branchville, NJ | 12.0 GWh |
#1308 | GDIM 4, LLC | North Smithfield, RI | 12.0 GWh |
#1309 | SR McNeal | McNeal, AZ | 11.8 GWh |
#1310 | Frenchtown III Solar | Frenchtown, NJ | 11.9 GWh |
#1311 | RE Bruceville 3 LLC | Elk Grove, CA | 11.9 GWh |
#1312 | Imclone Solar Electric Facility | Branchburg, NJ | 11.9 GWh |
#1313 | Franklin County Solar | Hampton, IA | 11.9 GWh |
#1314 | Mercer County Community College | West Windsor, NJ | 11.8 GWh |
#1315 | Toyota HQ Plan | Plano, TX | 11.8 GWh |
#1316 | RE Kammerer 2 LLC | Elk Grove, CA | 11.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pitkin County Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
3 MW LLC | Somerset, CO | 3.2 GWh | 41.2 mi |
American Gypsum Cogeneration | Gypsum, CO | 25.7 GWh | 28 mi |
Basalt | Aspen, CO | 13.2 GWh | 8.5 mi |
Blue Mesa | Gunnison, CO | 134.0 GWh | 60.2 mi |
Crystal | Montrose, CO | 119.6 GWh | 64.9 mi |
Dillon Hydro Plant | Summit, CO | 9.7 GWh | 50.4 mi |
Eagle Springs Solar LLC | Silt, CO | 1.7 GWh | 47.8 mi |
Eagle Valley Clean Energy LLC Biomass | Gypsum, CO | 65.5 GWh | 27.9 mi |
Green Mountain | Kremmling, CO | 25.6 GWh | 52.4 mi |
Lower Molina | Molina, CO | 12.4 GWh | 62.6 mi |
Oak Leaf Solar XXXII (CSG) | Rifle, CO | 3.6 GWh | 53.6 mi |
Oak Leaf Solar XXXIII LLC (Lantz) | Salida, CO | 4.1 GWh | 65.4 mi |
Pivot Solar 7 LLC (CSG) | Rifle, CO | 1.4 GWh | 53.6 mi |
Salida | Salida, CO | 1.7 GWh | 61.9 mi |
Shoshone (CO) | Glenwood Springs, CO | 68.1 GWh | 29.1 mi |
Sunnyside Ranch Community Solar Array | Carbondale, CO | 3.4 GWh | 18.9 mi |
Trout Creek Solar | Buena Vista, CO | 4.2 GWh | 50.8 mi |
Upper Molina | Molina, CO | 21.3 GWh | 60.8 mi |
Williams Fork Hydro Plant | Parshall, CO | 12.8 GWh | 65.1 mi |
WWRF Solar Plant | Rifle, CO | 2.2 GWh | 53.5 mi |