Pit 5
Pit 5 Road, Big Bend, CA 96011Plant Summary Information
Pit 5 is ranked #27 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Pit 5 is comprised of 4 generators and generated 28.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Pit 5 |
---|---|
Utility Name | Pacific Gas & Electric Co. |
Location | Shasta County, CA |
Initial Operation Date | April 1944 |
Last Update | Aug 2024 |
Annual Generation | 370.1 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,592 out of 11,835 Power Plants Nationwide | |
Ranked #126 out of 1,371 Water Power Plants Nationwide | |
Ranked #124 out of 1,569 California Power Plants | |
Ranked #27 out of 222 California Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Pacific Gas & Electric Co (2013 to 2016) Pacific Gas & Electric Co. (2017 to 2023) |
Map of Pit 5
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pit 5.
Monthly Net Generation for Pit 5
Pit 5 Details
Summary Information | |
---|---|
Plant Name | Pit 5 (268) |
Plant Address | Pit 5 Road, Big Bend, CA 96011 |
Utility | Pacific Gas & Electric Co. (14328) |
Latitude, Longitude | 40.9862, -121.97759 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | April 1944 |
Annual Generation | 370.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Pit River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator H1 Details Operating April 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT5_7_PL1X2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT5_7_PL1X2-APND |
Nameplate Capacity | 38.2 MW |
Nameplate Power Factor | 0.87 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1944 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator H2 Details Operating April 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT5_7_PL1X2-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT5_7_PL1X2-APND |
Nameplate Capacity | 38.2 MW |
Nameplate Power Factor | 0.87 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1944 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator H3 Details Operating April 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT5_7_PL3X4-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT5_7_PL3X4-APND |
Nameplate Capacity | 33.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1944 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator H4 Details Operating April 1944
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT5_7_PL3X4-APND |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT5_7_PL3X4-APND |
Nameplate Capacity | 32 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1944 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Pit 5 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#116 | Markland | Florence, IN | 394.7 GWh |
#117 | Cabot | Montague, MA | 394.4 GWh |
#118 | Big Creek 1 | Big Creek, CA | 393.8 GWh |
#119 | Curtis Palmer Hydroelectric | Corinth, NY | 393.2 GWh |
#120 | Box Canyon | Ione, WA | 383.5 GWh |
#121 | Parker Dam | Parker, CA | 379.9 GWh |
#122 | Hartwell Lake | Hartwell, GA | 378.9 GWh |
#123 | Smithland Hydroelectric Plant | Smithland, KY | 378.8 GWh |
#124 | C J Strike | Bruneau, ID | 377.1 GWh |
#125 | Keswick | Redding, CA | 373.0 GWh |
#127 | Old Hickory | Hendersonville, TN | 368.7 GWh |
#128 | James B Black | Big Bend, CA | 367.0 GWh |
#129 | Douglas Dam | Dandridge, TN | 364.9 GWh |
#130 | Kerckhoff 2 | Auberry, CA | 357.0 GWh |
#131 | Trinity | Weaverville, CA | 356.3 GWh |
#132 | Electra | Jackson, CA | 354.4 GWh |
#133 | Donnells | None, CA | 347.7 GWh |
#134 | Pelton | Madras, OR | 347.5 GWh |
#135 | Pit 3 | Burney, CA | 345.4 GWh |
#136 | Logan Martin Dam | Vincent, AL | 343.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pit 5.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Box Canyon Dam | Mount Shasta, CA | 17.3 GWh | 27.3 mi |
Burney Creek | Burney, CA | 6.2 GWh | 16 mi |
Burney Forest Products | Burney, CA | 186.7 GWh | 15.3 mi |
Cove Hydroelectric | Burney, CA | 14.4 GWh | 8.1 mi |
Hat Creek 1 | Burney, CA | 22.8 GWh | 22.9 mi |
Hat Creek 2 | Burney, CA | 6.9 GWh | 22.4 mi |
Hatchet Creek Project | Montgomery Creek, CA | 21.2 GWh | 8.3 mi |
Hatchet Ridge Wind Project | Burney, CA | 248.5 GWh | 10.9 mi |
James B Black | Big Bend, CA | 367.0 GWh | 0.4 mi |
Montgomery Creek Hydro | Montgomery Creek, CA | 8.4 GWh | 9.7 mi |
Nelson Creek | Big Bend, CA | 2.6 GWh | 5.3 mi |
Olsen | Whitmore, CA | 18.4 GWh | 24.3 mi |
Pit 1 | Burney, CA | 195.3 GWh | 25 mi |
Pit 3 | Burney, CA | 345.4 GWh | 12 mi |
Pit 4 | Big Bend, CA | 312.5 GWh | 6.7 mi |
Pit 6 | Montgomery Creek, CA | 277.7 GWh | 4.5 mi |
Pit 7 | Montgomery Creek, CA | 265.4 GWh | 9.6 mi |
Roaring Creek Water Power | Montgomery Creek, CA | 7.3 GWh | 7.4 mi |
Sierra Pacific Burney Facility | Burney, CA | 94.5 GWh | 16.3 mi |
Slate Creek | Lakehead, CA | 11.0 GWh | 25 mi |