Pit 1 Road, Star Route 1, Burney, CA 96013Plant Summary Information
Pit 1 is ranked #52 out of 214 hydroelectric power plants in California in terms of total annual net electricity generation.
Pit 1 is comprised of 2 generators and generated 29.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Pit 1 |
---|---|
Utility Name | Pacific Gas & Electric Co. |
Location | Shasta County, CA |
Initial Operation Date | September 1922 |
Last Update | Dec 2022 |
Annual Generation | 116.5 GWh |
Annual Consumption | 442.4 k MMBtu |
Ranked #2,952 out of 11,249 Power Plants Nationwide | |
Ranked #308 out of 1,354 Water Power Plants Nationwide | |
Ranked #321 out of 1,501 California Power Plants | |
Ranked #52 out of 214 California Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Pacific Gas & Electric Co (2013 to 2016) Pacific Gas & Electric Co. (2017 to 2022) |
Map of Pit 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pit 1.
Monthly Net Generation for Pit 1
Pit 1 Details
Summary Information | |
---|---|
Plant Name | Pit 1 (265) |
Plant Address | Pit 1 Road, Star Route 1 Burney, CA 96013 |
Utility | Pacific Gas & Electric Co. (14328) |
Latitude, Longitude | 40.99084, -121.49824 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | September 1922 |
Annual Generation | 116.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Fall River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator H1 Details Operating September 1922
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT1U1_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT1U1_7_B1 |
Nameplate Capacity | 34.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 30.5 MW |
Winter Capacity | 30.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1922 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator H2 Details Operating September 1922
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIT1U1_7_B2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIT1U1_7_B2 |
Nameplate Capacity | 34.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 30.5 MW |
Winter Capacity | 30.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1922 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Pit 1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#298 | Watauga | Elizabethton, TN | 123.7 GWh |
#299 | Pit 3 | Burney, CA | 123.1 GWh |
#300 | Cabin Creek | Georgetown, CO | 123.0 GWh |
#301 | Carpenter | Hot Springs, AR | 120.4 GWh |
#302 | Lemolo 2 | Toketee Falls, OR | 119.7 GWh |
#303 | Crystal | Montrose, CO | 119.6 GWh |
#304 | Fort Patrick Henry | Kingsport, TN | 119.0 GWh |
#305 | Castaic | Castaic, CA | 117.6 GWh |
#306 | Main Canal Headworks | Coulee City, WA | 117.5 GWh |
#307 | Skelton | Dayton, ME | 117.2 GWh |
#309 | Tyee Lake Hydroelectric Facility | Wrangell, AK | 116.5 GWh |
#310 | Dearborn | Great Falls, SC | 116.0 GWh |
#311 | RC Thomas Hydroelectric Project | Livingston, TX | 114.8 GWh |
#312 | Shepaug | Southbury, CT | 114.4 GWh |
#313 | Blewett | Lilesville, NC | 114.4 GWh |
#314 | Big Quinnesec 92 | Iron Mountain, MI | 114.0 GWh |
#315 | Swan Falls | Kuna, ID | 113.4 GWh |
#316 | Lemolo 1 | Idleyld Park, OR | 113.2 GWh |
#317 | River Mill | Estacada, OR | 113.0 GWh |
#318 | Lake Lynn Hydro Station | Lake Lynn, PA | 112.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pit 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bidwell Ditch Project | Hat Creek, CA | 11.7 GWh | 13.3 mi |
Burney Creek | Burney, CA | 2.0 GWh | 14.9 mi |
Burney Forest Products | Burney, CA | 242.3 GWh | 13.9 mi |
Cove Hydroelectric | Burney, CA | 7.5 GWh | 24.9 mi |
Hat Creek 1 | Burney, CA | 18.9 GWh | 4.9 mi |
Hat Creek 2 | Burney, CA | 22.7 GWh | 3.4 mi |
Hatchet Creek Project | Montgomery Creek, CA | 9.3 GWh | 23.5 mi |
Hatchet Ridge Wind Project | Burney, CA | 290.0 GWh | 17.2 mi |
James B Black | Big Bend, CA | 504.9 GWh | 24.9 mi |
Lost Creek I | Burney, CA | 5.2 GWh | 16.7 mi |
Montgomery Creek Hydro | Montgomery Creek, CA | 3.9 GWh | 25.9 mi |
Muck Valley Hydroelectric | NA, CA | 17.7 GWh | 12.7 mi |
Nelson Creek | Big Bend, CA | 939.2 MWh | 20.7 mi |
Pit 3 | Burney, CA | 123.1 GWh | 13 mi |
Pit 4 | Big Bend, CA | 400.1 GWh | 18.3 mi |
Pit 5 | Big Bend, CA | 738.8 GWh | 25 mi |
Pit 6 | Montgomery Creek, CA | 184.0 GWh | 26.2 mi |
Roaring Creek Water Power | Montgomery Creek, CA | 2.8 GWh | 24.7 mi |
Shasta Solar Farm | Fall River Mills, CA | 8.2 GWh | 4.8 mi |
Sierra Pacific Burney Facility | Burney, CA | 101.1 GWh | 13.2 mi |