Pioneer Generation Station
5639 151st Ave NW, Williston, ND 58801Plant Summary Information
Pioneer Generation Station is ranked #7 out of 56 power plants in North Dakota in terms of total annual net electricity generation.
Pioneer Generation Station is comprised of 15 generators and generated 341.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pioneer Generation Station |
---|---|
Utility Name | Basin Electric Power Coop |
Location | Williams County, ND |
Initial Operation Date | September 2013 |
Last Update | Dec 2023 |
Annual Generation | 1.5 TWh |
Annual Consumption | 15.8 M MMBtu |
Ranked #591 out of 11,835 Power Plants Nationwide | |
Ranked #375 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 56 North Dakota Power Plants | |
Ranked #1 out of 6 North Dakota Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pioneer Generation Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pioneer Generation Station.
Monthly Net Generation for Pioneer Generation Station
Pioneer Generation Station Details
Summary Information | |
---|---|
Plant Name | Pioneer Generation Station (57881) |
Plant Address | 5639 151st Ave NW, Williston, ND 58801 |
Utility | Basin Electric Power Coop (1307) |
Latitude, Longitude | 48.2325, -103.95278 |
Generation Dates on File | Sep 2013 to Dec 2023 |
Initial Operation Date | September 2013 |
Annual Generation | 1.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Mountrail-Williams Elec Coop (20413) ND |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | WBI ENERGY TRANSMISSION INC |
Natural Gas Storage | No |
Generator 01 Details Operating September 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG1_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS1 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 45 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 02 Details Operating January 2014
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG2_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS2 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 45 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2014 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 03 Details Operating February 2014
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG3_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS3 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42 MW |
Winter Capacity | 45 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2014 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 11 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG11_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS11 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG12_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS12 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 13 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG13_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS13 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 14 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG14_16_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS14_16 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 15 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG14_16_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS14_16 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 16 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG14_16_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS14_16 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 17 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG17_19_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS17_19 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 18 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG17_19_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS17_19 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 19 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG17_19_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS17_19 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 20 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG20_22_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS20_22 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 21 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG20_22_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS20_22 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 22 Details Operating January 2017
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WAUEPIONEERGUNG20_22_UNIT_RA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WAUE.BEPM.PGS20_22 |
Nameplate Capacity | 9.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 8.9 MW |
Winter Capacity | 8.9 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Pioneer Generation Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#365 | LaO Energy Systems | Plaquemine, LA | 1.8 TWh |
#366 | Santa Rosa Energy Center | Pace, FL | 1.5 TWh |
#367 | Walnut Energy Center | Turlock, CA | 1.5 TWh |
#368 | Magnolia Power Project | Burbank, CA | 1.5 TWh |
#369 | Westlake Plaquemine | Plaquemine, LA | 1.6 TWh |
#370 | Hot Spring Generating Facility | Malvern, AR | 1.5 TWh |
#371 | Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.5 TWh |
#372 | Anclote | Holiday, FL | 1.5 TWh |
#373 | Shell Chemical Appalachia LLC | Monaca, PA | 1.5 TWh |
#374 | H Wilson Sundt Generating Station | Tucson, AZ | 1.5 TWh |
#376 | Anadarko Plant | Anadarko, OK | 1.5 TWh |
#377 | Greenwood (MI) | Avoca, MI | 1.5 TWh |
#378 | Effingham Energy Facility | Rincon, GA | 1.5 TWh |
#379 | Renaissance Power Plant | Carson City, MI | 1.5 TWh |
#380 | Emporia Energy Center | Emporia, KS | 1.5 TWh |
#381 | Urquhart | Beech Island, SC | 1.5 TWh |
#382 | Ennis Power Company LLC | Ennis, TX | 1.4 TWh |
#383 | Barney M Davis | Corpus Christi, TX | 1.4 TWh |
#384 | Manchester Street | Providence, RI | 1.4 TWh |
#385 | S O Purdom | St Marks, FL | 1.4 TWh |
Nearby Power Plants
Below are closest 16 power plants surrounding Pioneer Generation Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aurora Wind Project | Tioga, ND | 983.9 GWh | 48.4 mi |
Brady II Wind Energy Center | Dickinson, ND | 625.5 GWh | 124.5 mi |
Brady Wind Energy Center | Dickinson, ND | 615.5 GWh | 122.8 mi |
Burke Wind, LLC | Bowbells, ND | 795.2 GWh | 70.2 mi |
Cedar Hills Wind Farm | Rhame, ND | 52.3 GWh | 137.6 mi |
Culbertson Generation Station | Culbertson, MT | 316.6 GWh | 20.3 mi |
Diamond Willow Wind Facility | Baker, MT | 82.1 GWh | 135.7 mi |
Glendive GT | Glendive, MT | 1.5 GWh | 89.3 mi |
Lewis & Clark | Richland, MT | 17.3 GWh | 39.4 mi |
Lindahl Wind Project, LLC | Tioga, ND | 539.8 GWh | 51.2 mi |
Lonesome Creek Station | Alexander, ND | 1.2 TWh | 34.7 mi |
Miles City GT | Miles City, MT | 202.0 MWh | 152.6 mi |
OREG 1 Inc | Culbertson, MT | 148.4 GWh | 20.5 mi |
OREG 2 Inc | Culbertson, MT | 107.0 GWh | 20.5 mi |
Sidney MT Plant | Sidney, MT | 4.4 GWh | 36.6 mi |
Sunflower Wind Project | Mandan, ND | 426.4 GWh | 130.2 mi |