Pio Pico Energy Center
7363 Calzada de la Fuente, San Diego, CA 92154Plant Summary Information
Pio Pico Energy Center is ranked #74 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Pio Pico Energy Center is comprised of 3 generators and generated 31.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pio Pico Energy Center |
---|---|
Utility Name | Pio Pico Energy Center LLC |
Location | San Diego County, CA |
Initial Operation Date | November 2016 |
Last Update | Dec 2023 |
Annual Generation | 100.1 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #3,165 out of 11,835 Power Plants Nationwide | |
Ranked #902 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #355 out of 1,569 California Power Plants | |
Ranked #74 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pio Pico Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pio Pico Energy Center.
Monthly Net Generation for Pio Pico Energy Center
Pio Pico Energy Center Details
Summary Information | |
---|---|
Plant Name | Pio Pico Energy Center (57555) |
Plant Address | 7363 Calzada de la Fuente, San Diego, CA 92154 |
Utility | Pio Pico Energy Center LLC (56895) |
Latitude, Longitude | 32.57389, -116.91778 |
Generation Dates on File | Nov 2016 to Dec 2023 |
Initial Operation Date | November 2016 |
Annual Generation | 100.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Otay Water District |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
Natural Gas Storage | No |
Generator CTG1 Details Operating November 2016
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIOPICO1_7_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIOPICO1_7_N001 |
Nameplate Capacity | 131.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 111.3 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating November 2016
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIOPICO2_7_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIOPICO2_7_N001 |
Nameplate Capacity | 131.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 112.7 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating November 2016
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PIOPICO3_7_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PIOPICO3_7_N001 |
Nameplate Capacity | 131.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 112 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Pio Pico Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#892 | TECO CHP-1 | Houston, TX | 106.3 GWh |
#893 | International Paper Texarkana Mill | Queen City, TX | 378.2 GWh |
#894 | Brunot Island | Pittsburg, PA | 105.2 GWh |
#895 | Bridgeport Fuel Cell, LLC | Bridgeport, CT | 105.1 GWh |
#896 | Calcasieu | Sulphur, LA | 104.4 GWh |
#897 | Energy Center Dover | Dover, DE | 104.1 GWh |
#898 | Pleasant Valley (MN) | Dexter, MN | 104.1 GWh |
#899 | University of Illinois Cogen Facility | Chicago, IL | 103.5 GWh |
#900 | HP Hood CT | Winchester, VA | 103.0 GWh |
#901 | Fort Dodge | Dodge City, KS | 102.4 GWh |
#903 | Graphic Packaging International Augusta Mill | Augusta, GA | 382.7 GWh |
#904 | Hell Gate | Bronx, NY | 99.8 GWh |
#905 | C R Wing Cogen Plant | Big Spring, TX | 99.6 GWh |
#906 | PCA, Filer City Mill | Filer City, MI | 97.3 GWh |
#907 | Edgewood Energy LLC | Brentwood, NY | 97.3 GWh |
#908 | Nearman Creek | Kansas, KS | 646.5 GWh |
#909 | Bob Glanzer Generating Station | Huron, SD | 96.4 GWh |
#910 | Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 96.3 GWh |
#911 | McCartney | Strafford, MO | 96.1 GWh |
#912 | Lockport Energy Associates LP | Lockport, NY | 96.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pio Pico Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CalPeak Power Border Peaker Plant | San Diego, CA | 13.2 GWh | 1.7 mi |
Childrens Hospital | San Diego, CA | 26.7 GWh | 20.7 mi |
Chula Vista Energy Center | Chula Vista, CA | 1.7 GWh | 8.3 mi |
County of San Diego SBRC | Chula Vista, CA | 2.3 GWh | 10.2 mi |
CP Kelco San Diego Plant | San Diego, CA | 83.2 GWh | 15.6 mi |
Cuyamaca Peak Energy Plant | El Cajon, CA | 12.1 GWh | 15.7 mi |
El Cajon Energy Center | El Cajon, CA | 7.6 GWh | 15.7 mi |
Gas Utilization Facility | San Diego, CA | 32.8 GWh | 20.5 mi |
Grossmont Hospital | La Mesa, CA | 27.5 GWh | 15.1 mi |
Grossmont HS Solar Project | El Cajon, CA | 2.1 GWh | 17.4 mi |
Larkspur Energy Facility | San Diego, CA | 38.7 GWh | 1.6 mi |
Lindberg FIeld Solar | San Diego, CA | 4.6 GWh | 20 mi |
Lindberg Field Solar 2 | San Diego, CA | 3.5 GWh | 19.9 mi |
Naval Hospital Medical Center | San Diego, CA | 21.4 GWh | 17 mi |
Otay Mesa Generating Project | San Diego, CA | 2.4 TWh | 0.5 mi |
PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.0 GWh | 14.2 mi |
San Diego - EMDF at San Diego | San Diego, CA | 4.8 GWh | 1.1 mi |
San Diego State University | San Diego, CA | 56.5 GWh | 16.7 mi |
SeaWorld Aquatica | Chula Vista, CA | 1.9 GWh | 5.1 mi |
Sycamore Energy LLC | Santee, CA | 23.2 GWh | 20.6 mi |