Pine Tree Wind Power Project
near Majove Desert, Cantil, CA 93519Plant Summary Information
Pine Tree Wind Power Project is ranked #60 out of 108 wind farms in California in terms of total annual net electricity generation.
Pine Tree Wind Power Project generated 13.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pine Tree Wind Power Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Kern County, CA |
Initial Operation Date | June 2009 |
Last Update | Dec 2023 |
Annual Generation | 61.0 GWh |
Annual Consumption | 231.0 k MMBtu |
Ranked #3,670 out of 11,852 Power Plants Nationwide | |
Ranked #938 out of 1,345 Wind Power Plants Nationwide | |
Ranked #429 out of 1,570 California Power Plants | |
Ranked #60 out of 108 California Wind Power Plants | |
Fuel Types | Wind |
Map of Pine Tree Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine Tree Wind Power Project.
Monthly Net Generation for Pine Tree Wind Power Project
Pine Tree Wind Power Project Details
Summary Information | |
---|---|
Plant Name | Pine Tree Wind Power Project (56433) |
Plant Address | near Majove Desert, Cantil, CA 93519 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 35.24801, -118.17536 |
Generation Dates on File | Jun 2009 to Dec 2023 |
Initial Operation Date | June 2009 |
Annual Generation | 61.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 135 MW |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 90 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 90 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 218 |
Pine Tree Wind Power Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#928 | Condon Windpower LLC | Condon, OR | 65.5 GWh |
#929 | Brule County Wind | Kimball, SD | 64.6 GWh |
#930 | Blue Canyon Windpower | Carnegie, OK | 64.4 GWh |
#931 | Red Horse 2 | Willcox, AZ | 200.4 GWh |
#932 | Camp Reed | Glenns Ferry, ID | 63.7 GWh |
#933 | 85 A | Tehachapi, CA | 62.9 GWh |
#934 | Big Spring Wind Power Facility | Big Spring, TX | 62.5 GWh |
#935 | Big Turtle Wind Farm 2 | Harbor Beach, MI | 62.1 GWh |
#936 | San Gorgonio Farms Wind Farm | Whitewater, CA | 61.8 GWh |
#937 | Vansycle | Touchet, OR | 61.7 GWh |
#939 | Yahoo Creek | Hagerman, ID | 60.9 GWh |
#940 | Lempster Wind LLC | Lempster, NH | 59.9 GWh |
#941 | Payne's Ferry | Hagerman, ID | 59.8 GWh |
#942 | Steel Winds Wind Farm | Lackawanna, NY | 59.5 GWh |
#943 | New England Wind LLC | Florida, MA | 59.5 GWh |
#944 | North Allegheny Windpower Project | Lilly, PA | 59.3 GWh |
#945 | BayWa r.e Mozart LLC | Jayton, TX | 59.1 GWh |
#946 | Crosswind Energy Project | Ruthven, IA | 57.8 GWh |
#947 | Salmon Falls Wind Park | Hagerman, ID | 57.2 GWh |
#948 | Hammett Hill Windfarm | Glenns Ferry, ID | 57.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pine Tree Wind Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
85 B | Tehachapi, CA | 86.9 GWh | 13.4 mi |
Alta Wind X | Mojave, CA | 336.5 GWh | 13.1 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 112.3 GWh | 10 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.2 GWh | 8 mi |
California City | California City, CA | 5.3 GWh | 12.6 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 128.8 GWh | 9.2 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 132.9 GWh | 9.1 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 114.0 GWh | 8.4 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 6.9 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 1.7 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 6.7 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 12 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 11.1 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 4.1 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 244.9 GWh | 11.2 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 12.4 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 11.2 mi |
Tehachapi Wind Resource II | Tehachapi, CA | 42.1 GWh | 12.5 mi |
Voyager Wind II | Mojave, CA | 476.7 GWh | 13.2 mi |
Voyager Wind IV | Mojave, CA | 70.2 GWh | 12.5 mi |