Pine Tree Solar Project
22500 Jawbone Canyon Rd, Owenyo, CA 93518Plant Summary Information
Pine Tree Solar Project is ranked #350 out of 799 solar farms in California in terms of total annual net electricity generation.
Pine Tree Solar Project generated 1.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pine Tree Solar Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Kern County, CA |
Initial Operation Date | March 2013 |
Last Update | Dec 2023 |
Annual Generation | 6.9 GWh |
Annual Consumption | 25.3 k MMBtu |
Ranked #6,990 out of 11,835 Power Plants Nationwide | |
Ranked #2,330 out of 5,643 Solar Power Plants Nationwide | |
Ranked #971 out of 1,569 California Power Plants | |
Ranked #350 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Pine Tree Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine Tree Solar Project.
Monthly Net Generation for Pine Tree Solar Project
Pine Tree Solar Project Details
Summary Information | |
---|---|
Plant Name | Pine Tree Solar Project (57306) |
Plant Address | 22500 Jawbone Canyon Rd, Owenyo, CA 93518 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 35.22964, -118.1957 |
Generation Dates on File | Mar 2013 to Dec 2023 |
Initial Operation Date | March 2013 |
Annual Generation | 6.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating March 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 8.5 MW |
Summer Capacity | 8.5 MW |
Winter Capacity | 8.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 9.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pine Tree Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2320 | PopeSun CSG, LLC | Starbuck, MN | 6.9 GWh |
#2321 | Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh |
#2322 | Carvers Creek Solar | Gloucester, VA | 6.9 GWh |
#2323 | CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh |
#2324 | 71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 6.8 GWh |
#2325 | Blackjack Solar | King City, CA | 6.9 GWh |
#2326 | Sweden 1 | Sweden, NY | 6.9 GWh |
#2327 | Ravenbrook | Carver, MA | 6.9 GWh |
#2328 | Hemings Solar | Warsaw, VA | 6.9 GWh |
#2329 | True North | Salisbury, MA | 6.9 GWh |
#2331 | Upper Blackstone (MA) Treasure Valley | Rutland, MA | 6.9 GWh |
#2332 | Montrose Solar | Montrose, MN | 6.9 GWh |
#2333 | South Goshen Community Solar | Goshen, NY | 6.7 GWh |
#2334 | Elizabeth Mines Solar 1 | So. Strafford, VT | 6.9 GWh |
#2335 | Athens AT01 | Athens, ME | 6.9 GWh |
#2336 | 3232 Batavia Solar | Batavia, NY | 6.9 GWh |
#2337 | Kearsarge Concord II | Concord, MA | 6.9 GWh |
#2338 | GMP Solar/Storage-Essex Hybrid | Essex, VT | 7.4 GWh |
#2339 | Bolton PV | Bolton, MA | 6.8 GWh |
#2340 | Tanager Holdings | Asheboro, NC | 6.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pine Tree Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
85 A | Tehachapi, CA | 62.9 GWh | 11.8 mi |
85 B | Tehachapi, CA | 86.9 GWh | 11.7 mi |
Alta Wind X | Mojave, CA | 336.5 GWh | 11.7 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh | 11.4 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.1 GWh | 9.2 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 129.0 GWh | 10.6 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 133.3 GWh | 10.3 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 113.7 GWh | 9.7 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 8.2 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 1.7 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 7.4 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 10.6 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 9.7 mi |
Rising Tree Wind Farm III | Mojave, CA | 261.7 GWh | 12 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 3.6 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 242.6 GWh | 11.7 mi |
Tehachapi Wind Resource II | Tehachapi, CA | 42.1 GWh | 10.7 mi |
Voyager Wind II | Mojave, CA | 473.5 GWh | 11.6 mi |
Voyager Wind III | Mojave, CA | 142.9 GWh | 12.3 mi |
Voyager Wind IV | Mojave, CA | 70.2 GWh | 10.9 mi |