Pine Tree Solar Project

22500 Jawbone Canyon Rd, Owenyo, CA 93518

Plant Summary Information

Pine Tree Solar Project is ranked #357 out of 807 solar farms in California in terms of total annual net electricity generation.

Pine Tree Solar Project generated 1.4 GWh during the 3-month period between September 2023 to December 2023.

Plant NamePine Tree Solar Project
Utility NameLos Angeles Department of Water & Power
LocationKern County, CA
Initial Operation DateMarch 2013
Last Update Dec 2023
Annual Generation 6.9 GWh
Annual Consumption 25.3 k MMBtu
Ranked #7,118 out of 11,979 Power Plants Nationwide
Ranked #2,439 out of 5,765 Solar Power Plants Nationwide
Ranked #981 out of 1,578 California Power Plants
Ranked #357 out of 807 California Solar Power Plants
Fuel Types Solar

Map of Pine Tree Solar Project

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine Tree Solar Project.

Create Your Account Today

Monthly Net Generation for Pine Tree Solar Project

2k2k2k2k1k1k5005000020142014201520152016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Pine Tree Solar Project Details

Summary Information
Plant NamePine Tree Solar Project (57306)
Plant Address22500 Jawbone Canyon Rd, Owenyo, CA 93518
UtilityLos Angeles Department of Water & Power (11208)
Latitude, Longitude35.22964, -118.1957
Generation Dates on FileMar 2013 to Dec 2023
Initial Operation DateMarch 2013
Annual Generation 6.9 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityLos Angeles Department of Water and Power (LDWP)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerLos Angeles Department of Water & Power (11208) CA
Grid Voltage 34.50 kV
Energy StorageNo

Generator 1 Details Operating March 2013

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity8.5 MW
Summer Capacity8.5 MW
Winter Capacity8.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2013
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity9.8 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Pine Tree Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2429PopeSun CSG, LLCStarbuck, MN6.9 GWh
#2430Fiddler's Canyon #1Cedar City, UT6.9 GWh
#2431CSU Long Beach Lots 7 & 14Long Beach, CA6.9 GWh
#243271 Charlotte Furnace Rd Hybrid(CSG)Wareham, MA6.8 GWh
#2433Blackjack SolarKing City, CA6.9 GWh
#2434Sweden 1Sweden, NY6.9 GWh
#2435Green PastureTBD, FL6.9 GWh
#2436RavenbrookCarver, MA6.9 GWh
#2437Hemings SolarWarsaw, VA6.9 GWh
#2438True NorthSalisbury, MA6.9 GWh
#2440Upper Blackstone (MA) Treasure ValleyRutland, MA6.9 GWh
#2441Montrose SolarMontrose, MN6.9 GWh
#2442South Goshen Community SolarGoshen, NY6.7 GWh
#2443Elizabeth Mines Solar 1So. Strafford, VT6.9 GWh
#2444Athens AT01Athens, ME6.9 GWh
#24453232 Batavia SolarBatavia, NY6.9 GWh
#2446Kearsarge Concord IIConcord, MA6.9 GWh
#2447Bolton PVBolton, MA6.8 GWh
#2448Founders Homestead Farms SolarPortsmouth, RI6.8 GWh
#2449Tanager HoldingsAsheboro, NC6.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Pine Tree Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
85 ATehachapi, CA62.9 GWh11.8 mi
85 BTehachapi, CA86.9 GWh11.7 mi
Alta Wind XMojave, CA336.5 GWh11.7 mi
Beacon Solar Plant Site 2Cantil, CA109.9 GWh11.4 mi
Beacon Solar Plant Site 5Cantil, CA92.8 GWh9.2 mi
Hecate Energy Beacon Solar 1Cantil, CA128.9 GWh10.6 mi
Hecate Energy Beacon Solar 3Cantil, CA132.8 GWh10.3 mi
Hecate Energy Beacon Solar 4Cantil, CA116.5 GWh9.7 mi
North Sky River Energy LLCWeldon, CA386.6 GWh8.2 mi
Pine Tree Wind Power ProjectCantil, CA61.0 GWh1.7 mi
RE Barren Ridge 1Mojave, CA169.5 GWh7.4 mi
Rising Tree Wind FarmMojave, CA213.4 GWh10.6 mi
Rising Tree Wind Farm IIMojave, CA47.7 GWh9.7 mi
Rising Tree Wind Farm IIIMojave, CA261.7 GWh12 mi
Sky River Wind Energy CenterTehachapi, CA201.6 GWh3.6 mi
Springbok 3 Solar Farm HybridCantil, CA247.4 GWh11.7 mi
Tehachapi Wind Resource IITehachapi, CA42.1 GWh10.7 mi
Voyager Wind IIMojave, CA496.9 GWh11.6 mi
Voyager Wind IIIMojave, CA147.5 GWh12.3 mi
Voyager Wind IVMojave, CA70.2 GWh10.9 mi