Pine Tree Acres WM LFGTE

36600 29 Mile Road, Lenox, MI 48048

Plant Summary Information

Pine Tree Acres WM LFGTE is ranked #8 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.

Pine Tree Acres WM LFGTE is comprised of 8 generators and generated 21.6 GWh during the 3-month period between June 2024 to September 2024.

Plant NamePine Tree Acres WM LFGTE
Utility NameWM Renewable Energy LLC
LocationMacomb County, MI
Initial Operation DateMarch 2012
Last Update Sep 2024
Annual Generation 89.6 GWh
Annual Consumption 1.1 M MMBtu
Ranked #3,301 out of 11,852 Power Plants Nationwide
Ranked #8 out of 299 Landfill Gas Power Plants Nationwide
Ranked #82 out of 256 Michigan Power Plants
Ranked #1 out of 23 Michigan Landfill Gas Power Plants
Fuel Types Landfill Gas

Map of Pine Tree Acres WM LFGTE

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine Tree Acres WM LFGTE.

Create Your Account Today

Monthly Net Generation for Pine Tree Acres WM LFGTE

Pine Tree Acres WM LFGTE Details

Summary Information
Plant NamePine Tree Acres WM LFGTE (57443)
Plant Address36600 29 Mile Road, Lenox, MI 48048
UtilityWM Renewable Energy LLC (54842)
Latitude, Longitude42.765, -82.74556
Generation Dates on FileMar 2012 to Sep 2024
Initial Operation DateMarch 2012
Annual Generation 89.6 GWh
Fuel Types Landfill Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerITC Transmission (56068) MI
Grid Voltage 120.00 kV
Energy StorageNo

Generator GEN1 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN2 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN3 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN4 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN5 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN6 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN7 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator GEN8 Details Operating March 2012

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
RTO ISO LMP Node DesignationDECO.PINE_TREE
RTO ISO Location Designation For Reporting Wholesale Sales DataDECO.PINE_TREE
Nameplate Capacity1.6 MW
Nameplate Power Factor0.98
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Pine Tree Acres WM LFGTE Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#1Brea Expansion PlantBrea, CA245.4 GWh
#2Johnston LFG Turbine PlantJohnston, RI231.1 GWh
#3Bowerman Power LFG, LLCIrvine, CA161.1 GWh
#4Puente Hills Energy RecoveryWhittier, CA158.5 GWh
#5Sunshine Gas ProducersSylmar, CA116.8 GWh
#6Loraine County ProjectOberlin, OH101.3 GWh
#7Middlesex County Utilities AuthoritySayreville, NJ93.2 GWh
#9Omega Hills Gas RecoveryGermantown, WI86.1 GWh
#10Seneca EnergySeneca Falls, NY85.8 GWh
#11Ameresco Ox MountainHalf Moon Bay, CA83.1 GWh
#12Waste Management Columbia Ridge LFGTEArlington, OR79.7 GWh
#13Waste Management King George LFGTEKing George, VA79.4 GWh
#14Metro Methane Recovery FacilityMitchellville, IA79.1 GWh
#15Ontario LFGTEStanley, NY78.4 GWh
#16Ocean County LandfillManchester, NJ77.9 GWh
#17High Acres Gas RecoveryFairport, NY72.1 GWh
#18Pine Tree AcresLenox Twp, MI69.9 GWh
#19Kiefer LandfillSloughhouse, CA66.6 GWh
#20Livingston Generating FacilityPontiac, IL64.0 GWh
#21Georgia LFG Richland Creek PlantBuford, GA62.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Pine Tree Acres WM LFGTE.

Plant NamePlant LocationAnnual GenerationDistance
Belle RiverChina Twp, MI6.1 TWh12.7 mi
Blue Water Energy CenterEast China, MI7.3 TWh13.5 mi
Blue Water Renewables IncKimball Township, MI24.6 GWh12.9 mi
Corewell Health Dearborn CampusDearborn, MI30.0 MWh40.4 mi
DeanEast China, MI589.1 GWh13.4 mi
Dearborn Energy CenterDearborn, MI251.9 GWh40.7 mi
Dearborn Industrial GenerationDearborn, MI5.7 TWh38.1 mi
DelrayDetroit, MI21.4 GWh37.2 mi
Demille Solar FarmLapeer, MI34.6 GWh35.3 mi
Eagle Valley (MI)Orion, MI21.6 GWh26.4 mi
Greenwood (MI)Avoca, MI1.5 TWh23.7 mi
Greenwood Solar FarmAvoca, MI2.2 GWh23.7 mi
HancockCommerce Twp, MI11.1 GWh38.4 mi
MSC CroswellCroswell, MI24.3 MWh35.2 mi
Northeast (MI)Warren, MI1.8 GWh26.4 mi
O'Shea Solar FarmDetroit, MI2.9 GWh35.4 mi
Pine Tree AcresLenox Twp, MI69.9 GWh0.1 mi
St ClairEast China Twp, MI290.0 MWh13.9 mi
Turrill Solar FarmLapeer, MI25.1 GWh34.1 mi
WyandotteWyandotte, MI85.0 MWh43.5 mi