Pinal Central Energy Center Hybrid
19 S. Sunshine Blvd, Casa Grande, AZ 85194Plant Summary Information
Pinal Central Energy Center Hybrid is ranked #34 out of 102 solar farms in Arizona in terms of total annual net electricity generation.
Pinal Central Energy Center Hybrid generated 15.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Pinal Central Energy Center Hybrid |
---|---|
Utility Name | Pinal Central Energy Center, LLC |
Location | Pinal County, AZ |
Initial Operation Date | April 2018 |
Last Update | Aug 2024 |
Annual Generation | 50.6 GWh |
Annual Consumption | 196.8 k MMBtu |
Ranked #3,835 out of 11,835 Power Plants Nationwide | |
Ranked #758 out of 5,643 Solar Power Plants Nationwide | |
Ranked #79 out of 155 Arizona Power Plants | |
Ranked #34 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Pinal Central Energy Center Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pinal Central Energy Center Hybrid.
Monthly Net Generation for Pinal Central Energy Center Hybrid
Pinal Central Energy Center Hybrid Details
Summary Information | |
---|---|
Plant Name | Pinal Central Energy Center Hybrid (61678) |
Plant Address | 19 S. Sunshine Blvd, Casa Grande, AZ 85194 |
Utility | Pinal Central Energy Center, LLC (61295) |
Latitude, Longitude | 32.8757, -111.55111 |
Generation Dates on File | Mar 2018 to Aug 2024 |
Initial Operation Date | April 2018 |
Annual Generation | 50.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator BA1 Details Operating April 2018
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 40 |
---|---|
Maximum Charge Rate | 10 MW |
Maximum Discharge Rate | 10 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 10 |
Storage Enclosure Type | CS |
Frequency Regulation | P |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator PCEC Details Operating April 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Lenses Mirrors | No |
---|---|
Single Axis Tracking | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 30.9 MW |
Thin Film Other | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pinal Central Energy Center Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#748 | Fort Gordon Solar Facility | Fort Gordon, GA | 55.0 GWh |
#749 | Adelanto Solar, LLC | Adelanto, CA | 54.9 GWh |
#750 | Orion I Solar Project | Burlington, TX | 54.6 GWh |
#751 | Ripley | La Plata, MD | 54.0 GWh |
#752 | Mountain View Solar | North Las Vegas, NV | 53.8 GWh |
#753 | Axium Modesto Solar | Modesto, CA | 53.7 GWh |
#754 | TA-Acacia, LLC | Lancaster, CA | 53.4 GWh |
#755 | Sulphur Springs | Cochise, AZ | 53.3 GWh |
#756 | Mechanicsville Solar | Mechanicsville, VA | 53.1 GWh |
#757 | Cascade Solar | Joshua Tree, CA | 53.0 GWh |
#759 | Edwards Sanborn E3 | Mojave, CA | 50.3 GWh |
#760 | Kings Bay Solar Facility | Kings Bay, GA | 52.1 GWh |
#761 | Fort Benning Solar Facility | Fort Benning, GA | 51.9 GWh |
#762 | Poseidon Solar, LLC | Globe, AZ | 51.4 GWh |
#763 | Solar Oasis LLC | Palmdale, CA | 51.3 GWh |
#764 | Fort Stewart Solar Facility | Fort Stewart, GA | 51.1 GWh |
#765 | SEPV Mojave West | Mojave, CA | 51.1 GWh |
#766 | RE Kansas South LLC | Lemoore, CA | 51.1 GWh |
#767 | Seville 1 | Ocotillo Wells, CA | 50.3 GWh |
#768 | Prairie Creek Solar | Jacksonville, IL | 50.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pinal Central Energy Center Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bonnybrooke PV | Florence, AZ | 118.7 GWh | 17.3 mi |
Central Line Solar, LLC | Coolidge, AZ | 256.3 GWh | 3 mi |
Coolidge Generation Station | Coolidge, AZ | 281.8 GWh | 4 mi |
Desert Basin | Casa Grande, AZ | 3.2 TWh | 13.9 mi |
East Line Solar | Coolidge, AZ | 236.2 GWh | 2.1 mi |
Eleven Mile Solar Center | Coolidge, AZ | 237.9 GWh | 2.6 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 10.7 GWh | 32.2 mi |
Mesa Carport PV | Mesa, AZ | 8.1 GWh | 32.7 mi |
Poseidon Solar, LLC | Globe, AZ | 51.4 GWh | 20.1 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh | 27.3 mi |
Red Rock | Red Rock, AZ | 84.7 GWh | 27.1 mi |
Saguaro | Red Rock, AZ | 175.6 GWh | 26.7 mi |
Saint Solar | Coolidge, AZ | 256.6 GWh | 2.9 mi |
Sandstone Solar | Florence, AZ | 111.1 GWh | 13.1 mi |
Storey Solar and Storage | Coolidge, AZ | 242.7 GWh | 3.2 mi |
Sundance | Casa Grande, AZ | 480.4 GWh | 4.3 mi |
Union HS at Casa Grande | Casa Grande, AZ | 2.6 GWh | 11.7 mi |
Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.7 GWh | 9.5 mi |
Walmart Casa Grande | Casa Grande, AZ | 1.8 GWh | 12.8 mi |
West Line Solar, LLC | City of Eloy, AZ | 266.5 GWh | 8.3 mi |