Pike Solar Hybrid
TBD, Fountain, CO 80817Plant Summary Information
Pike Solar Hybrid is ranked #40 out of 267 power plants in Colorado in terms of total annual net electricity generation.
Pike Solar Hybrid generated 117.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Pike Solar Hybrid |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | El Paso County, CO |
Initial Operation Date | December 2023 |
Last Update | Aug 2024 |
Annual Generation | 307.9 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,802 out of 11,835 Power Plants Nationwide | |
Ranked #152 out of 5,643 Solar Power Plants Nationwide | |
Ranked #40 out of 267 Colorado Power Plants | |
Ranked #5 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pike Solar LLC (2020 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Pike Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pike Solar Hybrid.
Monthly Net Generation for Pike Solar Hybrid
Pike Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | Pike Solar Hybrid (64212) |
Plant Address | TBD, Fountain, CO 80817 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 38.6217, -104.5814 |
Generation Dates on File | Dec 2023 to Aug 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 307.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Colorado Springs - (CO) (3989) CO |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator CO465 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 175 MW |
Summer Capacity | 175 MW |
Winter Capacity | 175 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 223.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pike Solar Hybrid Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Pike Solar, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Pike Solar, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Lily Solar Hybrid | Scurry, TX | 315.7 GWh |
#143 | Cove Mountain Solar 2 | Beryl, UT | 317.3 GWh |
#144 | Oak Ridge Solar | Oak Ridge, LA | 313.8 GWh |
#145 | Maverick Solar 7, LLC | Desert Center, CA | 312.8 GWh |
#146 | Edwards Sanborn E2 | Mojave, CA | 294.1 GWh |
#147 | Big Cypress Solar, LLC | Crawfordsville, AR | 311.3 GWh |
#148 | Elora Solar | Elora, TN | 309.7 GWh |
#149 | Bernard Creek Solar | Hungerford, TX | 309.3 GWh |
#150 | Sun Streams 2 | Hassayampa, AZ | 309.0 GWh |
#151 | SR DeSoto I, LLC | DeSoto, GA | 308.4 GWh |
#153 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 304.1 GWh |
#154 | Drew Solar LLC | Calexico, CA | 304.0 GWh |
#155 | Midway Solar - TX | Fort Stockton, TX | 302.3 GWh |
#156 | Samson Solar Energy III LLC | Cunningham, TX | 301.8 GWh |
#157 | BigBeau Solar, LLC | Rosamond, CA | 299.9 GWh |
#158 | Panoche Valley Solar Farm | Paicines, CA | 298.3 GWh |
#159 | Victory Pass | Desert Center, CA | 296.2 GWh |
#160 | Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh |
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#162 | Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pike Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AFA Solar Farm | Colorado Springs, CO | 11.0 GWh | 26.2 mi |
Bighorn Solar 1 | Pueblo, CO | 600.1 GWh | 28.6 mi |
Carson Solar I | Colorado Springs, CO | 3.0 GWh | 12.9 mi |
CEC Solar #1117, LLC | Pueblo, CO | 7.2 GWh | 23.5 mi |
Clear Spring Ranch PV Project | Fountain, CO | 20.2 GWh | 6.3 mi |
Comanche (CO) | Pueblo, CO | 5.7 TWh | 28.6 mi |
Comanche Solar | Pueblo, CO | 251.5 GWh | 28.8 mi |
CSU Pueblo | Pueblo, CO | 1.1 GWh | 21.8 mi |
Fountain Valley Power Facility | Fountain, CO | 70.3 GWh | 7.3 mi |
Front Range Power Plant | Fountain, CO | 2.2 TWh | 6.8 mi |
George Birdsall | Colorado Springs, CO | 5.9 GWh | 22 mi |
James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 25.4 mi |
Manitou Springs | Manitou Spring, CO | 14.6 GWh | 24.9 mi |
Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh | 22.1 mi |
Palmer Solar | Fountain, CO | 144.1 GWh | 3.9 mi |
Pikes Peak Solar Garden 1 LLC CSG | Colorado Springs, CO | 10.0 GWh | 13.8 mi |
Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 21 mi |
Ray D Nixon | Fountain, CO | 928.6 GWh | 6.8 mi |
Ruxton Park | Manitou Spring, CO | 1.8 GWh | 26 mi |
South Plant | Colorado Springs, CO | 118.8 GWh | 19.5 mi |