Pickwick Landing Dam
HIGHWAY 128 S, Pickwick Dam, TN 38365Plant Summary Information
Pickwick Landing Dam is ranked #36 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Pickwick Landing Dam is comprised of 6 generators and generated 231.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pickwick Landing Dam |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Hardin County, TN |
Initial Operation Date | June 1938 |
Last Update | Dec 2023 |
Annual Generation | 1.1 TWh |
Annual Consumption | 4.1 M MMBtu |
Ranked #686 out of 11,835 Power Plants Nationwide | |
Ranked #36 out of 1,371 Water Power Plants Nationwide | |
Ranked #9 out of 84 Tennessee Power Plants | |
Ranked #1 out of 28 Tennessee Water Power Plants | |
Fuel Types | Water |
Map of Pickwick Landing Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pickwick Landing Dam.
Monthly Net Generation for Pickwick Landing Dam
Pickwick Landing Dam Details
Summary Information | |
---|---|
Plant Name | Pickwick Landing Dam (3415) |
Plant Address | HIGHWAY 128 S, Pickwick Dam, TN 38365 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 35.0683, -88.2494 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1938 |
Annual Generation | 1.1 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tennessee River |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 2 Details Operating June 1938
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 37.6 MW |
Winter Capacity | 34.3 MW |
Minimum Load | 32.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1938 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1 Details Operating August 1938
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 37.7 MW |
Winter Capacity | 34.4 MW |
Minimum Load | 32.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1938 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating June 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 43.6 MW |
Winter Capacity | 39.4 MW |
Minimum Load | 32.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1942 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating August 1942
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 38.5 MW |
Winter Capacity | 35.2 MW |
Minimum Load | 32.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1942 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 5 Details Operating October 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 43.7 MW |
Winter Capacity | 38.4 MW |
Minimum Load | 30.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 6 Details Operating December 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.91 |
Summer Capacity | 43.2 MW |
Winter Capacity | 37.9 MW |
Minimum Load | 30.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1952 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Pickwick Landing Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#26 | Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh |
#27 | Fort Randall | Pickstown, SD | 1.5 TWh |
#28 | Dworshak | Ahsahka, ID | 1.4 TWh |
#29 | Ice Harbor | Burbank, WA | 1.4 TWh |
#30 | Hoover Dam (NV) | Boulder City, NV | 1.4 TWh |
#31 | Lower Monumental | Kahlotus, WA | 1.3 TWh |
#32 | Lower Granite | Pomeroy, WA | 1.3 TWh |
#33 | Noxon Rapids | Noxon, MT | 1.3 TWh |
#34 | Colgate | Dobbins, CA | 1.3 TWh |
#35 | Kentucky Dam | Grand Rivers, KY | 1.2 TWh |
#37 | Wheeler Dam | Town Creek, AL | 1.1 TWh |
#38 | Safe Harbor | Conestoga, PA | 989.2 GWh |
#39 | Holtwood | Holtwood, PA | 949.8 GWh |
#40 | Devil Canyon | San Bernardino, CA | 925.8 GWh |
#41 | Davis Dam | Kingman, AZ | 908.9 GWh |
#42 | Oxbow (OR) | Oxbow, OR | 900.1 GWh |
#43 | Yellowtail | Hardin, MT | 846.0 GWh |
#44 | Mossyrock | Silver Creek, WA | 844.5 GWh |
#45 | Keokuk | Keokuk, IA | 834.9 GWh |
#46 | Cabinet Gorge | Clark Fork, ID | 815.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pickwick Landing Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brownsville Peaking Power | Brownsville, TN | 39.4 GWh | 62.8 mi |
Colbert | Tuscumbia, AL | 78.7 GWh | 31.9 mi |
Johnsonville | New Johnsonville, TN | 642.8 GWh | 67.9 mi |
Latitude Solar Center | Whiteville, TN | 24.9 GWh | 54.4 mi |
Magnolia Power Plant | Ashland, MS | 6.4 TWh | 56.3 mi |
Mulberry Farm LLC | Selmer, TN | 25.1 GWh | 19.6 mi |
Muscle Shoals | Cherokee, AL | 437.0 GWh | 28.4 mi |
Packaging Corp of America | Counce, TN | 409.7 GWh | 1.7 mi |
Providence Solar | Madison, TN | 27.0 GWh | 57.2 mi |
River Bend Solar, LLC | Florence, AL | 151.5 GWh | 28.3 mi |
Selmer Farm LLC | Selmer, TN | 24.9 GWh | 18.2 mi |
Selmer I | Selmer, TN | 22.8 GWh | 17.8 mi |
Selmer II | Selmer, TN | 10.9 GWh | 23.4 mi |
Somerville Solar | Somerville, TN | 3.2 GWh | 63.2 mi |
SR Bolivar | Bolivar, TN | 6.5 GWh | 45.4 mi |
SR Jackson II | Jackson, TN | 2.2 GWh | 53 mi |
SR McKellar | Denmark, TN | 137.5 GWh | 51.8 mi |
Wheeler Dam | Town Creek, AL | 1.1 TWh | 52.4 mi |
Wildberry | Moscow, TN | 18.9 GWh | 63.3 mi |
Wilson Dam | Muscle Shoals, AL | 2.2 TWh | 40 mi |