Phoebe Solar
11445 E St HWY 302, Kermit, TX 79745Plant Summary Information
Phoebe Solar is ranked #15 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Phoebe Solar generated 179.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Phoebe Solar |
---|---|
Utility Name | Phoebe Energy Project, LLC |
Location | Winkler County, TX |
Initial Operation Date | November 2019 |
Last Update | Aug 2024 |
Annual Generation | 518.7 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,257 out of 11,835 Power Plants Nationwide | |
Ranked #51 out of 5,643 Solar Power Plants Nationwide | |
Ranked #233 out of 749 Texas Power Plants | |
Ranked #15 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Phoebe Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Phoebe Solar.
Monthly Net Generation for Phoebe Solar
Phoebe Solar Details
Summary Information | |
---|---|
Plant Name | Phoebe Solar (61906) |
Plant Address | 11445 E St HWY 302, Kermit, TX 79745 |
Utility | Phoebe Energy Project, LLC (61515) |
Latitude, Longitude | 31.84342, -102.8683 |
Generation Dates on File | Jun 2019 to Aug 2024 |
Initial Operation Date | November 2019 |
Annual Generation | 518.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PHOEB Details Operating November 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 250 MW |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Other Solar Technology | No |
DC Net Capacity | 317 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Phoebe Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
#42 | Oberon II Solar Project | Desert Center, CA | 549.7 GWh |
#43 | Blythe Mesa Solar II | Blythe, CA | 541.3 GWh |
#44 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 555.3 GWh |
#45 | Oberon Solar Project | Desert Center, CA | 534.1 GWh |
#46 | Dodge Flat | Reno, NV | 540.8 GWh |
#47 | Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh |
#48 | Five Wells Solar Center - Hybrid | Rogers, TX | 537.3 GWh |
#49 | Sun Valley Solar Project | Abbott, TX | 534.9 GWh |
#50 | ENGIE Long Draw Solar LLC | Gail, TX | 526.1 GWh |
#52 | Techren Solar II LLC | Boulder, NV | 515.8 GWh |
#53 | Golden Field Solar III, LLC | Rosamond, CA | 509.2 GWh |
#54 | Azure Sky Solar | Haskell, TX | 505.1 GWh |
#55 | Lumina Solar Project | Snyder, TX | 510.3 GWh |
#56 | Dunn's Bridge 1 Solar | Wheatfield, IN | 505.0 GWh |
#57 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 500.3 GWh |
#58 | Galloway 1 Solar Farm | Paint Rock, TX | 496.6 GWh |
#59 | Yellowbud Solar, LLC | Williamsport, OH | 495.8 GWh |
#60 | Waco Solar | Mount Calm, TX | 495.4 GWh |
#61 | RE Maplewood | McCamey, TX | 491.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Phoebe Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 902.8 GWh | 27.4 mi |
Bakke | Andrews, TX | 877.0 MWh | 36.7 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 22.8 mi |
Frankel | Andrews, TX | 645.0 MWh | 37.5 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 16.4 mi |
Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh | 37.8 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 26.2 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 227.1 GWh | 10.7 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 13.8 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 14.5 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 31.8 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 17.6 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 18.8 mi |
Prospero Solar | Andrews, TX | 746.0 GWh | 30.8 mi |
Prospero Solar II | Andrews, TX | 675.9 GWh | 29.9 mi |
Quail Run Energy Center | Odessa, TX | 2.3 TWh | 32.5 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 25.2 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 29.9 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 39.5 mi |
Westover | Odessa, TX | 709.0 MWh | 24.8 mi |