Phantom Solar
91001 Ammo Road, Fort Hood, TX 76544Plant Summary Information
Phantom Solar is ranked #97 out of 151 solar farms in Texas in terms of total annual net electricity generation.
Phantom Solar generated 7.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Phantom Solar |
---|---|
Utility Name | Phantom Solar, LLC |
Location | Bell County, TX |
Initial Operation Date | April 2017 |
Last Update | Dec 2022 |
Annual Generation | 28.5 GWh |
Annual Consumption | 104.1 k MMBtu |
Ranked #4,506 out of 11,249 Power Plants Nationwide | |
Ranked #940 out of 5,158 Solar Power Plants Nationwide | |
Ranked #483 out of 721 Texas Power Plants | |
Ranked #97 out of 151 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Phantom Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Phantom Solar.
Monthly Net Generation for Phantom Solar
Phantom Solar Details
Summary Information | |
---|---|
Plant Name | Phantom Solar (60774) |
Plant Address | 91001 Ammo Road Fort Hood, TX 76544 |
Utility | Phantom Solar, LLC (60400) |
Latitude, Longitude | 31.11498, -97.84511 |
Generation Dates on File | Apr 2017 to Dec 2022 |
Initial Operation Date | April 2017 |
Annual Generation | 28.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF17662-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15.4 MW |
Summer Capacity | 15.4 MW |
Winter Capacity | 15.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 19.6 MW |
Other Materials | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Phantom Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#930 | TWE Myrtle Solar Farm, LLC | Suffolk, VA | 28.8 GWh |
#931 | Crane Solar Facility | Crane, IN | 28.8 GWh |
#932 | AES Kekaha Solar, LLC Hybrid | Kekaha, HI | 27.9 GWh |
#933 | Lake Mabel Solar | Lake Wales, FL | 28.6 GWh |
#934 | Redcrest Solar Farm | Edison, CA | 28.6 GWh |
#935 | Coolidge Solar 1, LLC | Ludlow, VT | 28.6 GWh |
#936 | Rio De Oro Solar Energy Center | Belen, NM | 28.5 GWh |
#937 | Ibis | Palm Bay, FL | 28.5 GWh |
#938 | Wautoma Solar | Wautoma, WI | 28.5 GWh |
#939 | Patua Acquisition Project, LLC | Hazen, NV | 138.6 GWh |
#941 | Gates Solar Station | Huron, CA | 28.3 GWh |
#942 | Puller Solar | Topping, VA | 28.2 GWh |
#943 | Twittys Creek Solar, LLC | Keysville, VA | 28.2 GWh |
#944 | Victory Pass | Desert Center, CA | 28.1 GWh |
#945 | San Miguel II Solar Energy Center | Las Vegas, NM | 27.9 GWh |
#946 | Western Antelope Dry Ranch | Lancaster, CA | 27.9 GWh |
#947 | Selmer Farm LLC | Selmer, TN | 27.9 GWh |
#948 | Mulberry Farm LLC | Selmer, TN | 27.8 GWh |
#949 | Pilesgrove | Pilesgrove, NJ | 27.8 GWh |
#950 | Electric City Solar | Sturgis, MI | 27.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Phantom Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BPL Crown Solar LLC | Chilton, TX | 44.7 GWh | 47.8 mi |
BPL Sol Solar LLC | Chilton, TX | 43.1 GWh | 47.8 mi |
Buchanan Dam (TX) | Buchanan Dam, TX | 24.2 GWh | 42.2 mi |
Castle Gap Wind | Goldthwaite, TX | 324.8 GWh | 36 mi |
Eddy II | Eddy, TX | 18.1 GWh | 36.6 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 148.1 GWh | 35.6 mi |
Goldthwaite Wind Energy Facility | Goldthwaite, TX | 543.6 GWh | 41.1 mi |
Granite Shoals | Marble Falls, TX | 17.9 GWh | 48.5 mi |
Griffin Solar | Robinson, TX | 11.2 GWh | 48.4 mi |
Grizzly Ridge Solar | Hamilton County, TX | 68.5 GWh | 48.2 mi |
HEB00182 | Temple, TX | 267.3 MWh | 28.2 mi |
HEB00591 | Round Rock, TX | 386.0 MWh | 42.7 mi |
IKEA Round Rock 027 | Round Rock, TX | 1.7 GWh | 39.6 mi |
Inks | Buchanan Dam, TX | 12.3 GWh | 41.6 mi |
Marble Falls | Marble Falls, TX | 10.7 GWh | 45.8 mi |
Panda Temple Power Station | Temple, TX | 7.9 TWh | 31.5 mi |
WAL1232 | Belton, TX | 300.3 MWh | 23 mi |
WAL407 | Killeen, TX | 264.0 MWh | 7.1 mi |
WAL5480 | Round Rock, TX | 342.0 MWh | 42.5 mi |
WAL6929 | Temple, TX | 269.2 MWh | 25.5 mi |