PFMG Solar Grossmont Helix LLC
7323 University Ave, La Mesa, CA 91942Plant Summary Information
PFMG Solar Grossmont Helix LLC is ranked #632 out of 799 solar farms in California in terms of total annual net electricity generation.
PFMG Solar Grossmont Helix LLC generated 382.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | PFMG Solar Grossmont Helix LLC |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | San Diego County, CA |
Initial Operation Date | May 2018 |
Last Update | Dec 2023 |
Annual Generation | 2.0 GWh |
Annual Consumption | 7.3 k MMBtu |
Ranked #9,851 out of 11,835 Power Plants Nationwide | |
Ranked #4,590 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,360 out of 1,569 California Power Plants | |
Ranked #632 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
PFMG Solar Grossmont Helix LLC (2018 to 2022) Altus Power America Management, LLC (2023 to 2023) |
Map of PFMG Solar Grossmont Helix LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PFMG Solar Grossmont Helix LLC.
Monthly Net Generation for PFMG Solar Grossmont Helix LLC
PFMG Solar Grossmont Helix LLC Details
Summary Information | |
---|---|
Plant Name | PFMG Solar Grossmont Helix LLC (62611) |
Plant Address | 7323 University Ave, La Mesa, CA 91942 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 32.75328, -117.03524 |
Generation Dates on File | May 2018 to Dec 2023 |
Initial Operation Date | May 2018 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF18-469 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator HELIX Details Operating May 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 236 |
Tilt Angle | 5 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
PFMG Solar Grossmont Helix LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4580 | Titlow Garden LLC CSG | Gaylord, MN | 2.1 GWh |
#4581 | Svihel Community Solar LLC CSG | Foley, MN | 2.0 GWh |
#4582 | Paradise Valley H.S. PV | Phoenix, AZ | 2.0 GWh |
#4583 | Foxconn Ohio | Warren, OH | 2.0 GWh |
#4584 | Union Garden | Northfield, MN | 2.0 GWh |
#4585 | MSC-Scott01 LLC | Jordan, MN | 2.0 GWh |
#4586 | Honeysuckle Solar, LLC | Lester Prairie, MN | 2.0 GWh |
#4587 | Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh |
#4588 | USS Bluff Country Solar CSG | Altura, MN | 2.0 GWh |
#4589 | USS Solar Rapids CSG | Sauk Rapids, MN | 2.0 GWh |
#4591 | Centerville Solar Park | Centerville, IN | 2.0 GWh |
#4592 | The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.0 GWh |
#4593 | Holliston LLC | Holliston, MA | 2.0 GWh |
#4594 | Amherst Solar Facility (VA) | Amherst, VA | 2.0 GWh |
#4595 | Freeze Solar | Dayton, NJ | 2.0 GWh |
#4596 | Novel Wayne Solar LLC CSG | Mantorville, MN | 2.0 GWh |
#4597 | Novel Debra Solar LLC CSG | Mantorville, MN | 2.0 GWh |
#4598 | Concord Solar Farm | Concord, MA | 2.0 GWh |
#4599 | SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh |
#4600 | WWRF Solar Plant | Rifle, CO | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PFMG Solar Grossmont Helix LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Childrens Hospital | San Diego, CA | 26.7 GWh | 7.5 mi |
Chula Vista Energy Center | Chula Vista, CA | 1.7 GWh | 11.2 mi |
County of San Diego COC Hybrid | San Diego, CA | 3.1 GWh | 7.9 mi |
County of San Diego SBRC | Chula Vista, CA | 2.3 GWh | 8.7 mi |
CP Kelco San Diego Plant | San Diego, CA | 83.2 GWh | 7.5 mi |
Cuyamaca Peak Energy Plant | El Cajon, CA | 12.1 GWh | 4.7 mi |
El Cajon Energy Center | El Cajon, CA | 7.6 GWh | 4.7 mi |
Grossmont Hospital | La Mesa, CA | 27.5 GWh | 2.5 mi |
Grossmont HS Solar Project | El Cajon, CA | 2.1 GWh | 4.8 mi |
Kyocera International Inc.(San Diego) | San Diego, CA | 8.8 GWh | 7.6 mi |
Lindberg FIeld Solar | San Diego, CA | 4.6 GWh | 10.2 mi |
Lindberg Field Solar 2 | San Diego, CA | 3.5 GWh | 10 mi |
Miramar Energy Facility | San Diego, CA | 12.9 GWh | 11.4 mi |
MM San Diego-Miramar | San Diego, CA | 35.9 GWh | 9.7 mi |
Naval Hospital Medical Center | San Diego, CA | 21.4 GWh | 6.7 mi |
San Diego Community College | San Diego, CA | 6.5 GWh | 8.5 mi |
San Diego State University | San Diego, CA | 56.5 GWh | 2.7 mi |
SeaWorld Aquatica | Chula Vista, CA | 1.9 GWh | 11.7 mi |
Sycamore Energy LLC | Santee, CA | 23.2 GWh | 7.2 mi |
University of San Diego | San Diego, CA | 6.2 GWh | 9.2 mi |