Pfizer Groton Plant
Eastern Point Rd, MS 9101, Groton, CT 6340Plant Summary Information
Pfizer Groton Plant is ranked #25 out of 156 power plants in Connecticut in terms of total annual net electricity generation.
Pfizer Groton Plant is comprised of 4 generators and generated 22.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Pfizer Groton Plant |
---|---|
Utility Name | Pfizer Inc |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | January 1948 |
Last Update | Aug 2024 |
Annual Generation | 69.4 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #3,554 out of 11,835 Power Plants Nationwide | |
Ranked #1,004 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #25 out of 156 Connecticut Power Plants | |
Ranked #16 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas : 97.6% Distillate Fuel Oil : 2.4% |
Map of Pfizer Groton Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pfizer Groton Plant.
Monthly Net Generation for Pfizer Groton Plant
Pfizer Groton Plant Details
Summary Information | |
---|---|
Plant Name | Pfizer Groton Plant (54236) |
Plant Address | Eastern Point Rd, MS 9101, Groton, CT 6340 |
Utility | Pfizer Inc (14928) |
Latitude, Longitude | 41.3315, -72.0786 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | January 1948 |
Annual Generation | 69.4 GWh |
Fuel Types | Natural Gas : 97.6% Distillate Fuel Oil : 2.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 89-350-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Chemical Manufacturing (325) |
Sector | Industrial CHP (7) |
Water Source | Thames River |
Ash Impoundment | No |
Transmission / Distribution Owner | Groton Dept of Utilities - (CT) (7716) CT |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | YANKEE GAS SVC CO |
Pipeline Name | Algonquin Gas Transmission Company |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator TG 3 Details Operating January 1952
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.97 |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1952 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 10 MW |
Net Winter Capacity With Natural Gas | 10 MW |
Net Summer Capacity With Oil | 10 MW |
Net Winter Capacity With Oil | 10 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator TG 4 Details Operating January 1994
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.94 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1994 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 5 MW |
Net Winter Capacity With Natural Gas | 5 MW |
Net Summer Capacity With Oil | 5 MW |
Net Winter Capacity With Oil | 5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator TG5 Details Operating August 2001
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2001 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 7.5 MW |
Net Winter Capacity With Natural Gas | 7.5 MW |
Net Summer Capacity With Oil | 7.5 MW |
Net Winter Capacity With Oil | 7.5 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT-1 Details Operating September 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 9.5 MW |
Winter Capacity | 10.5 MW |
Minimum Load | 4.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 9.5 MW |
Net Winter Capacity With Natural Gas | 10.5 MW |
Net Summer Capacity With Oil | 9.5 MW |
Net Winter Capacity With Oil | 10.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Pfizer Groton Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#994 | Rubart | Ulysses, KS | 70.3 GWh |
#995 | Fountain Valley Power Facility | Fountain, CO | 70.3 GWh |
#996 | Nippon Dynawave Packaging Longview WA | Longview, WA | 291.9 GWh |
#997 | Berkshire Power | Agawam, MA | 70.1 GWh |
#998 | Anheuser-Busch Jacksonville | Jacksonville, FL | 69.5 GWh |
#999 | Parnassus Central Utility Plant | San Francisco, CA | 69.3 GWh |
#1000 | New York University Central Plant | New York, NY | 74.2 GWh |
#1001 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1002 | Hopewell Mill | Hopewell, VA | 284.6 GWh |
#1003 | Beaver Dam | Canton Township, PA | 68.1 GWh |
#1005 | La Luz Energy Center | Belen, NM | 67.7 GWh |
#1006 | International Paper Vicksburg Mill | Vicksburg, MS | 203.7 GWh |
#1007 | Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh |
#1008 | Lee Energy Facility | Dixon, IL | 67.0 GWh |
#1009 | Packaging Corp of America | Counce, TN | 409.7 GWh |
#1010 | Yuma Cogeneration Associates | Yuma, AZ | 66.6 GWh |
#1011 | Univ of Massachusetts Medical Center | Worcester, MA | 68.1 GWh |
#1012 | Wolf Run Energy | Wilmot Township, PA | 66.1 GWh |
#1013 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#1014 | The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pfizer Groton Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.1 GWh | 10 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 2.2 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 4.4 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 3.4 mi |
Connecticut College | New London, CT | 8.1 GWh | 3.7 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.9 GWh | 9.9 mi |
Fishers Island 1 | Fisher's Island, NY | 119.0 MWh | 5.6 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 742.0 MWh | 9.7 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 11.5 mi |
Gary Court 1 & 2 | Groton, CT | 466.0 MWh | 3.1 mi |
Millstone | Waterford, CT | 16.3 TWh | 4.8 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 6.8 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 4.7 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 13.4 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 0.4 mi |
Rand Whitney CHP Plant | Montville, CT | 133.5 GWh | 8.9 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 4.7 mi |
Water Treatment 1 & 2 | Groton, CT | 413.0 MWh | 2.2 mi |
White Rock Road LLC | Westerly, RI | 9.8 GWh | 13.3 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 1.4 mi |