Peru (IL)
4005 Plank Rd., City of Peru, IL 61354Plant Summary Information
Peru (IL) is ranked #2 out of 6 hydroelectric power plants in Illinois in terms of total annual net electricity generation.
Peru (IL) is comprised of 12 generators and generated 5.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Peru (IL) |
---|---|
Utility Name | City of Peru - (IL) |
Location | LaSalle County, IL |
Initial Operation Date | October 1968 |
Last Update | Aug 2024 |
Annual Generation | 21.4 GWh |
Annual Consumption | 86.3 k MMBtu |
Ranked #4,977 out of 11,835 Power Plants Nationwide | |
Ranked #741 out of 1,371 Water Power Plants Nationwide | |
Ranked #116 out of 318 Illinois Power Plants | |
Ranked #2 out of 6 Illinois Water Power Plants | |
Fuel Types | Water : 99.1% Distillate Fuel Oil : 0.7% |
Map of Peru (IL)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Peru (IL).
Monthly Net Generation for Peru (IL)
Peru (IL) Details
Summary Information | |
---|---|
Plant Name | Peru (IL) (955) |
Plant Address | 4005 Plank Rd., City of Peru, IL 61354 |
Utility | City of Peru - (IL) (14840) |
Latitude, Longitude | 41.3237, -89.1123 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1968 |
Annual Generation | 21.4 GWh |
Fuel Types | Water : 99.1% Distillate Fuel Oil : 0.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Illinois River |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Peru - (IL) (14840) IL |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GT1 Details Operating October 1968
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 8.6 MW |
Winter Capacity | 8.6 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Jet Fuel |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator HC1 Details Operating September 1996
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HC2 Details Operating September 1996
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HC3 Details Operating September 1996
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HC4 Details Operating September 1996
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 11 Details Operating April 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating April 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 13 Details Operating April 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 14 Details Operating April 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 15 Details Operating April 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 16 Details Operating September 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 17 Details Operating September 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMIL.IP.IMEA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMIL.IP.IMEA |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.7 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Peru (IL) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#731 | Wainiha Hydro | Hanalei, HI | 22.1 GWh |
#732 | Haypress | Sierra City, CA | 22.1 GWh |
#733 | Heart Mountain | Cody, WY | 21.8 GWh |
#734 | South Edwards | Fine, NY | 21.6 GWh |
#735 | Searsburg | Searsburg, VT | 21.6 GWh |
#736 | Flat Rock | Fine, NY | 21.5 GWh |
#737 | Moline | Moline, IL | 21.5 GWh |
#738 | Spearfish Hydro | Spearfish, SD | 21.4 GWh |
#739 | Neversink | Grahmsville, NY | 21.3 GWh |
#740 | Boatlock | Holyoke, MA | 21.3 GWh |
#742 | Blue Ridge | Blue Ridge, GA | 21.2 GWh |
#743 | Hatchet Creek Project | Montgomery Creek, CA | 21.2 GWh |
#744 | Portal | Lakeshore, CA | 21.2 GWh |
#745 | Whiting | Whiting, WI | 21.2 GWh |
#746 | Guernsey | Guernsey, WY | 21.1 GWh |
#747 | Chatuge | Hayesville, NC | 21.0 GWh |
#748 | Allison Creek Hydro | Valdez, AK | 21.0 GWh |
#749 | Fries Hydroelectric Project | Fries, VA | 20.9 GWh |
#750 | James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh |
#751 | Fleish | Fleish, NV | 20.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Peru (IL).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bennington Wind | Minonk, IL | 319.5 GWh | 25.1 mi |
Briscoe 1A | Tonica, IL | 4.0 GWh | 9.1 mi |
Briscoe 2A | Lostant, IL | 3.8 GWh | 11.3 mi |
Com Adam 1WF-1 | Sublette, IL | 6.5 GWh | 24.3 mi |
Crescent Ridge | Tiskilwa, IL | 203.8 GWh | 24.3 mi |
Dayton Hydro | Ottawa, IL | 11.4 GWh | 17.3 mi |
DePue Holdings, LLC | DePue, IL | 23.7 GWh | 9.9 mi |
Grand Ridge Solar Farm | Marseilles, IL | 25.4 GWh | 22.2 mi |
Grand Ridge Wind Energy Center | Marseilles, IL | 426.0 GWh | 23.2 mi |
GSG LLC | West Brooklyn, IL | 92.5 GWh | 22.3 mi |
LaSalle Generating Station | Marseilles, IL | 19.5 TWh | 23.6 mi |
Mendota | Mendota, IL | 2.9 GWh | 15.7 mi |
Mendota Rich Dev CSG | Mendota, IL | 4.1 GWh | 15.2 mi |
Otter Creek Wind Farm LLC | Ransom, IL | 468.9 GWh | 19.5 mi |
Princeton (IL) | Princeton, IL | 1.0 GWh | 18.6 mi |
Providence Heights Wind LLC | Tiskilwa, IL | 148.1 GWh | 24 mi |
Schulte 2 Community Solar | Lacon, IL | 3.7 GWh | 25.3 mi |
Segunda II (CSG) | Streator, IL | 6.1 GWh | 19.2 mi |
Shady Oaks Wind 2 | Compton, IL | 298.4 GWh | 23.8 mi |
Shady Oaks Wind Farm | Compton, IL | 318.8 GWh | 23.9 mi |