Perry
10 Center Road, Perry, OH 44081Plant Summary Information
Perry is ranked #39 out of 54 nuclear power plants nationwide in terms of total annual net electricity generation.
Perry is comprised of 1 generator and generated 3.7 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Perry |
---|---|
Utility Name | Energy Harbor Nuclear Generation LLC |
Location | Lake County, OH |
Initial Operation Date | November 1987 |
Last Update | Mar 2024 |
Annual Generation | 10.2 TWh |
Annual Consumption | 106.8 M MMBtu |
Ranked #70 out of 11,249 Power Plants Nationwide | |
Ranked #39 out of 54 Nuclear Power Plants Nationwide | |
Ranked #5 out of 170 Ohio Power Plants | |
Ranked #1 out of 2 Ohio Nuclear Power Plants | |
Fuel Types | Nuclear |
Previous Operator |
FirstEnergy Nuclear Operating Company (2013 to 2019) Energy Harbor Nuclear Generation LLC (2020 to 2022) |
Map of Perry
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Perry.
Monthly Net Generation for Perry
Perry Details
Summary Information | |
---|---|
Plant Name | Perry (6020) |
Plant Address | 10 Center Road Perry, OH 44081 |
Utility | Energy Harbor Nuclear Generation LLC (64225) |
Latitude, Longitude | 41.8006, -81.1439 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | November 1987 |
Annual Generation | 10.2 TWh |
Fuel Types | Nuclear |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lake Erie |
Ash Impoundment | No |
Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 1987
Technology | Nuclear |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1311.6 MW |
Nameplate Power Factor | 0.92 |
Summer Capacity | 1240 MW |
Winter Capacity | 1268 MW |
Minimum Load | 133 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1987 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Nuclear |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Perry Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Nuclear.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#29 | Calvert Cliffs Nuclear Power Plant | Lusby, MD | 16.0 TWh |
#30 | Edwin I Hatch | Baxley, GA | 15.4 TWh |
#31 | Surry | Surry, VA | 15.2 TWh |
#32 | Millstone | Waterford, CT | 15.1 TWh |
#33 | Turkey Point | Homestead, FL | 21.9 TWh |
#34 | Grand Gulf | Port Gibson, MS | 11.7 TWh |
#35 | Wolf Creek Generating Station | Burlington, KS | 11.2 TWh |
#36 | PSEG Hope Creek Generating Station | Hancocks Bridge, NJ | 10.6 TWh |
#37 | Point Beach Nuclear Plant | Two Rivers, WI | 10.6 TWh |
#38 | Seabrook | Seabrook, NH | 10.5 TWh |
#40 | Callaway | Fulton, MO | 9.9 TWh |
#41 | Fermi | Frenchtown Twp, MI | 9.6 TWh |
#42 | Harris | New Hill, NC | 9.3 TWh |
#43 | Columbia Generating Station | Richland, WA | 9.3 TWh |
#44 | Clinton Power Station | Clinton, IL | 9.1 TWh |
#45 | V C Summer | Jenkinsville, SC | 8.3 TWh |
#46 | Davis Besse | Oak Harbor, OH | 8.1 TWh |
#47 | James A Fitzpatrick | Lycoming, NY | 8.0 TWh |
#48 | Cooper Nuclear Station | Brownville, NE | 7.5 TWh |
#49 | H B Robinson | Hartsville, SC | 7.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Perry.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 8.6 GWh | 49.8 mi |
Arcelormittal Cleveland Inc | Cleveland, OH | 186.9 GWh | 35.4 mi |
Ashtabula | Ashtabula, OH | 185.5 GWh | 20.6 mi |
Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.9 TWh | 47.5 mi |
Cleveland Peaking | Cleveland, OH | 106.0 MWh | 28.5 mi |
Cleveland Thermal | Cleveland, OH | 1.5 GWh | 34.3 mi |
Clevelandcliffs Warren | Warren, OH | 53.6 GWh | 44 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.9 GWh | 28.5 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.5 GWh | 39.9 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 605.6 MWh | 48.6 mi |
Euclid Farm, Stamco N-54 | Euclid, OH | 598.0 MWh | 22.8 mi |
Geneva | Geneva, OH | 21.0 GWh | 12.1 mi |
Girard (PA) RTO BTM | Girard, PA | 84.0 MWh | 44.6 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 39.4 mi |
LE Wind Turbine 1 | Euclid, OH | 5.5 GWh | 24.7 mi |
Lordstown Motor Corp | Warren, OH | 1.8 GWh | 47.1 mi |
MCCo Solar Generating Facility | Cleveland, OH | 448.0 MWh | 30.5 mi |
Niles RTO BTM | Niles, OH | 308.0 MWh | 48.2 mi |
Painesville | Painesville, OH | 44.0 MWh | 7.6 mi |
Summit Street Power Plant | Kent, OH | 32.4 GWh | 46.6 mi |