Permian Basin
600 North Yucca Dr., Monahans, TX 79756Plant Summary Information
Permian Basin is ranked #110 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Permian Basin is comprised of 5 generators and generated 66.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Permian Basin |
---|---|
Utility Name | Luminant Generation Company LLC |
Location | Ward County, TX |
Initial Operation Date | June 1958 |
Last Update | Dec 2023 |
Annual Generation | 344.7 GWh |
Annual Consumption | 4.9 M MMBtu |
Ranked #1,667 out of 11,835 Power Plants Nationwide | |
Ranked #620 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #320 out of 749 Texas Power Plants | |
Ranked #110 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Map of Permian Basin
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Permian Basin.
Monthly Net Generation for Permian Basin
Permian Basin Details
Summary Information | |
---|---|
Plant Name | Permian Basin (3494) |
Plant Address | 600 North Yucca Dr., Monahans, TX 79756 |
Utility | Luminant Generation Company LLC (55983) |
Latitude, Longitude | 31.5839, -102.9633 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1958 |
Annual Generation | 344.7 GWh |
Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENERGY TRANSFER FUEL LP |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CT1 Details Operating May 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 63 MW |
Winter Capacity | 79 MW |
Minimum Load | 41 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1988 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 68 MW |
Net Winter Capacity With Natural Gas | 71 MW |
Net Summer Capacity With Oil | 68 MW |
Net Winter Capacity With Oil | 71 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT2 Details Operating May 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 64 MW |
Winter Capacity | 76 MW |
Minimum Load | 41 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1988 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 65 MW |
Net Winter Capacity With Natural Gas | 71 MW |
Net Summer Capacity With Oil | 65 MW |
Net Winter Capacity With Oil | 71 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT3 Details Operating May 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 64 MW |
Winter Capacity | 78 MW |
Minimum Load | 41 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1988 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 68 MW |
Net Winter Capacity With Natural Gas | 74 MW |
Net Summer Capacity With Oil | 68 MW |
Net Winter Capacity With Oil | 74 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT4 Details Operating February 1990
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 64 MW |
Winter Capacity | 75 MW |
Minimum Load | 41 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1990 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 69 MW |
Net Winter Capacity With Natural Gas | 75 MW |
Net Summer Capacity With Oil | 69 MW |
Net Winter Capacity With Oil | 75 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT5 Details Operating February 1990
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 89.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 65 MW |
Winter Capacity | 79 MW |
Minimum Load | 41 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1990 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 70 MW |
Net Winter Capacity With Natural Gas | 75 MW |
Net Summer Capacity With Oil | 70 MW |
Net Winter Capacity With Oil | 75 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Permian Basin Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Luminant Generation Company LLC | 6555 Sierra Drive, Irving, TX 75039 | Generator 5 | 100.00% |
Luminant Gen Co LLC Fin Holding | , , | Generator 6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#610 | Formosa Plastics | Baton Rouge, LA | 369.6 GWh |
#611 | Gadsby | Salt Lake City, UT | 366.2 GWh |
#612 | Humboldt Bay | Eureka, CA | 367.5 GWh |
#613 | Kimberly Clark Mobile - CHP Plant | Mobile, AL | 365.5 GWh |
#614 | Dighton Power Plant | Dighton, MA | 358.4 GWh |
#615 | Remington | Remington, VA | 365.5 GWh |
#616 | Hal C Weaver Power Plant | Austin, TX | 354.4 GWh |
#617 | West Campus Cogeneration Facility | Madison, WI | 353.0 GWh |
#618 | Braes Bayou Plant | Richmond, TX | 352.1 GWh |
#619 | THUMS | Long Beach, CA | 342.8 GWh |
#621 | Selkirk Cogen | Selkirk, NY | 339.2 GWh |
#622 | Georgia-Pacific Muskogee | Muskogee, OK | 373.6 GWh |
#623 | Medical Area Total Energy Plant | Boston, MA | 338.6 GWh |
#624 | Walnut Creek Energy Park | Industry, CA | 336.7 GWh |
#625 | Trinidad (TX) | Trinidad, TX | 330.6 GWh |
#626 | Redding Power | Redding, CA | 329.7 GWh |
#627 | Buchanan Generation LLC | Keen Mountain, VA | 329.2 GWh |
#628 | RockGen Energy Center | Cambridge, WI | 329.3 GWh |
#629 | Reeves | Albuquerque, NM | 325.8 GWh |
#630 | Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Permian Basin.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 902.8 GWh | 44.8 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 46.7 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 44.7 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 40.2 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 33.2 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 39 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 227.1 GWh | 29.5 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 17.5 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 17.3 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 41.4 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 34.7 mi |
Phoebe Solar | Kermit, TX | 518.7 GWh | 18.8 mi |
Quail Run Energy Center | Odessa, TX | 2.3 TWh | 42.1 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 38.9 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 43.4 mi |
Taygete Energy Project LLC | Coyanosa, TX | 475.0 GWh | 30.5 mi |
Taygete II Energy Project | Coyanosa, TX | 491.0 GWh | 29.2 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 46.2 mi |
West of the Pecos Solar | TBD, TX | 232.6 GWh | 46.3 mi |
Westover | Odessa, TX | 709.0 MWh | 35 mi |