1414 Blue Hills Ave, Bloomfield, CT 6002Plant Summary Information
Pepperidge Farm Bloomfield is ranked #33 out of 55 natural gas power plants in Connecticut in terms of total annual net electricity generation.
Pepperidge Farm Bloomfield is comprised of 2 generators and generated 16.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pepperidge Farm Bloomfield |
---|---|
Utility Name | Pepperidge Farm, Inc.- Bloomfield |
Location | Capitol Planning Region, CT |
Initial Operation Date | August 2008 |
Last Update | Dec 2023 |
Annual Generation | 16.5 GWh |
Annual Consumption | 226.2 k MMBtu |
Ranked #5,284 out of 11,835 Power Plants Nationwide | |
Ranked #1,454 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #52 out of 156 Connecticut Power Plants | |
Ranked #33 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pepperidge Farm Bloomfield
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pepperidge Farm Bloomfield.
Monthly Net Generation for Pepperidge Farm Bloomfield
Pepperidge Farm Bloomfield Details
Summary Information | |
---|---|
Plant Name | Pepperidge Farm Bloomfield (59967) |
Plant Address | 1414 Blue Hills Ave, Bloomfield, CT 6002 |
Utility | Pepperidge Farm, Inc.- Bloomfield (59724) |
Latitude, Longitude | 41.8693, -72.71832 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | August 2008 |
Annual Generation | 16.5 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial CHP (7) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONNECTICUT NAT GAS CORP |
Natural Gas Storage | No |
Generator FCB Details Operating September 2008
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2008 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator FCC Details Operating August 2016
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Pepperidge Farm Bloomfield Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1444 | Burrstone Energy Center | New Hartford, NY | 17.1 GWh |
#1445 | Medtronic - New Haven 2 | North Haven, CT | 17.0 GWh |
#1446 | Altice - Hicksville | Hicksville, NY | 16.9 GWh |
#1447 | Equinix - Billerica | Billerica, MA | 16.8 GWh |
#1448 | Nalco | Naperville, IL | 16.7 GWh |
#1449 | Waynoka Gas Processing Plant | Alva, OK | 16.7 GWh |
#1450 | Pleasant Hill | Pleasant Hill, IA | 16.8 GWh |
#1451 | EQX010 Great Oaks Fuel Cell | San Jose, CA | 16.5 GWh |
#1452 | POET Biorefining- Alexandria, LLC | Alexandria, IN | 16.5 GWh |
#1453 | McIntosh | Rincon, GA | 21.1 GWh |
#1455 | UI RCP Woodbridge FC | Woodbridge, CT | 16.5 GWh |
#1456 | Kaiser East La Palma Ave. Fuel Cell | Anaheim, CA | 16.4 GWh |
#1457 | Kaiser - Harbor City | Harbor City, CA | 16.4 GWh |
#1458 | Cayuga | Cayuga, IN | 4.5 TWh |
#1459 | GEN005 Antibody Fuel Cell | Oceanside, CA | 16.3 GWh |
#1460 | John W Turk Jr Power Plant | Fulton, AR | 3.0 TWh |
#1461 | POET Biorefining-Hanlontown, LLC | Hanlontown, IA | 16.1 GWh |
#1462 | Nodaway | Conception Junction, MO | 16.0 GWh |
#1463 | Tracy 210 | Tracy, CA | 15.9 GWh |
#1464 | Clay Boswell | Cohasset, MN | 4.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pepperidge Farm Bloomfield.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ALDI DC 2 | South Windsor, CT | 1.7 GWh | 7.4 mi |
Algonquin Windsor Locks | Windsor Locks, CT | 130.4 GWh | 6 mi |
Bradley Energy Center | Windsor Locks, CT | 12.9 GWh | 4.4 mi |
Canis Major Solar Farm | Suffield, CT | 3.5 GWh | 10.3 mi |
Cellu Tissue | East Hartford, CT | 12.1 GWh | 8.6 mi |
East Windsor Solar One | East Windsor, CT | 8.8 GWh | 10.4 mi |
Goose Pond Solar | Southwick, MA | 7.0 GWh | 10.1 mi |
Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh | 7.7 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.4 GWh | 6.4 mi |
HSCo CHP | Hartford, CT | 26.6 GWh | 7.9 mi |
Kearsarge Southwick LLC | Southwick, MA | 5.5 GWh | 10.6 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 4.4 GWh | 0.7 mi |
Norcap North | East Windsor, CT | 3.4 GWh | 9 mi |
Norcap South | East Windsor, CT | 3.4 GWh | 9 mi |
Pratt & Whitney | East Hartford, CT | 129.1 GWh | 9.4 mi |
Rainbow (CT) | Windsor, CT | 37.9 GWh | 3.4 mi |
South Meadow | Hartford, CT | 1.5 GWh | 8.9 mi |
South Windsor Fuel Cell | South Windsor, CT | 39.2 GWh | 6.5 mi |
Southington Solar One | Southington, CT | 8.7 GWh | 10.4 mi |
Trinity College Fuel Cell | Hartford, CT | 8.9 GWh | 8.6 mi |