Pensacola
Junction 82 & 28, Langley, OK 74350Plant Summary Information
Pensacola is ranked #2 out of 10 hydroelectric power plants in Oklahoma in terms of total annual net electricity generation.
Pensacola is comprised of 7 generators and generated 31.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pensacola |
---|---|
Utility Name | Grand River Dam Authority |
Location | Mayes County, OK |
Initial Operation Date | August 1940 |
Last Update | Dec 2023 |
Annual Generation | 228.0 GWh |
Annual Consumption | 917.9 k MMBtu |
Ranked #2,167 out of 11,852 Power Plants Nationwide | |
Ranked #199 out of 1,371 Water Power Plants Nationwide | |
Ranked #81 out of 126 Oklahoma Power Plants | |
Ranked #2 out of 10 Oklahoma Water Power Plants | |
Fuel Types | Water |
Map of Pensacola
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pensacola.
Monthly Net Generation for Pensacola
Pensacola Details
Summary Information | |
---|---|
Plant Name | Pensacola (2981) |
Plant Address | Junction 82 & 28, Langley, OK 74350 |
Utility | Grand River Dam Authority (7490) |
Latitude, Longitude | 36.4675, -95.04139 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1940 |
Annual Generation | 228.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Grand Neosho |
Ash Impoundment | No |
Transmission / Distribution Owner | Grand River Dam Authority (7490) OK |
Grid Voltage | 69.00 kV / 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN1_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19 MW |
Winter Capacity | 19.9 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 2 Details Operating August 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN2_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18.9 MW |
Winter Capacity | 20 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 3 Details Operating August 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN3_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19 MW |
Winter Capacity | 19.6 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4 Details Operating August 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN4_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18.9 MW |
Winter Capacity | 20.1 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator A Details Out of Service August 1940
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | August 1940 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating August 1946
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN5_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18.8 MW |
Winter Capacity | 19.9 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1946 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating August 1946
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRDAPENSA1UN6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRDAPENSA1UN6_RA |
Nameplate Capacity | 21.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 18.7 MW |
Winter Capacity | 19.9 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1946 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Pensacola Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#189 | Tiger Creek | Pioneer, CA | 246.0 GWh |
#190 | Cochrane | Great Falls, MT | 244.7 GWh |
#191 | Hudson Falls Hydroelectric Project | South Glens Falls, NY | 242.3 GWh |
#192 | Blakely Mountain | Royal, AR | 234.9 GWh |
#193 | Judge F Carr | French Gulch, CA | 234.3 GWh |
#194 | Edison Sault | Sault Ste. Marie, MI | 233.6 GWh |
#195 | Lewis Smith Dam | Jasper, AL | 233.4 GWh |
#196 | Woodleaf | Forbestown, CA | 231.6 GWh |
#197 | Toledo Bend | Burkville, TX | 231.5 GWh |
#198 | Harry Truman | Warsaw, MO | 230.9 GWh |
#200 | J Woodruff | Chattahoochee, FL | 224.2 GWh |
#201 | Hiwassee Dam | Murphy, NC | 224.0 GWh |
#202 | Thurlow Dam | Tallassee, AL | 222.2 GWh |
#203 | Lost Creek | Trail, OR | 221.3 GWh |
#204 | Willow Island Hydroelectric Plant | Willow Island, WV | 220.4 GWh |
#205 | San Francisquito 1 | Saugus, CA | 220.2 GWh |
#206 | Hadley Falls | Holyoke, MA | 218.2 GWh |
#207 | W E Warne | Gorman, CA | 216.9 GWh |
#208 | Eufaula Dam | Porum, OK | 216.1 GWh |
#209 | Racine | Racine, OH | 215.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pensacola.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chouteau | Pryor, OK | 6.7 TWh | 21.4 mi |
CML&P Generating Facility No. 2 | Coffeyville, KS | 93.2 GWh | 52.7 mi |
Coffeyville | Coffeyville, KS | 10.9 GWh | 50.5 mi |
Flint Creek | Gentry, AR | 2.1 TWh | 32.3 mi |
Fort Gibson | Fort Gibson, OK | 140.4 GWh | 42.6 mi |
Georgia-Pacific Muskogee | Muskogee, OK | 374.1 GWh | 52.7 mi |
GREC | Chouteau, OK | 3.4 TWh | 23.6 mi |
Harry D Mattison Gas Plant | Tontitown, AR | 180.5 GWh | 46.4 mi |
Markham | Locust Grove, OK | 123.5 GWh | 18.1 mi |
Muskogee | Fort Gibson, OK | 2.7 TWh | 50.7 mi |
Northeastern | Oologah, OK | 3.9 TWh | 36.7 mi |
Oneta Energy Center | Broken Arrow, OK | 5.7 TWh | 48.2 mi |
Ozarks Natural Energy Community Solar | Springdale, AR | 1.3 GWh | 57.4 mi |
Prosperity Solar Farm CSG | Joplin, MO | 4.0 GWh | 56.6 mi |
Riverton | Riverton, KS | 1.2 TWh | 45.9 mi |
State Line Combined Cycle | Joplin, MO | 2.6 TWh | 47.6 mi |
Tulsa | Tulsa, OK | 214.3 GWh | 58.2 mi |
UA Central Utility Plant | Fayetteville, AR | 37.5 GWh | 55.8 mi |
Waste Management Eco Vista LFGTE | Springdale, AR | 6.9 GWh | 49 mi |
Westside Wastewater Treatment Plant Hybrid | Fayetteville, AR | 9.0 GWh | 58.2 mi |