Pelzer Lower
900 Dunlap Road, Williamston, SC 29627Plant Summary Information
Pelzer Lower is ranked #23 out of 29 hydroelectric power plants in South Carolina in terms of total annual net electricity generation.
Pelzer Lower is comprised of 1 generator and generated 332.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pelzer Lower |
---|---|
Utility Name | Central Rivers Power US, LLC |
Location | Anderson County, SC |
Initial Operation Date | December 1989 |
Last Update | Dec 2023 |
Annual Generation | 4.6 GWh |
Annual Consumption | 18.0 k MMBtu |
Ranked #7,841 out of 11,866 Power Plants Nationwide | |
Ranked #1,183 out of 1,369 Water Power Plants Nationwide | |
Ranked #120 out of 190 South Carolina Power Plants | |
Ranked #23 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Pelzer Hydro Co Inc (2013 to 2019) Central Rivers Power US, LLC (2020 to 2023) |
Map of Pelzer Lower
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pelzer Lower.
Monthly Net Generation for Pelzer Lower
Pelzer Lower Details
Summary Information | |
---|---|
Plant Name | Pelzer Lower (10800) |
Plant Address | 900 Dunlap Road, Williamston, SC 29627 |
Utility | Central Rivers Power US, LLC (64078) |
Latitude, Longitude | 34.61652, -82.44791 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1989 |
Annual Generation | 4.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 89-258-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Saluda River |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 3.30 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 1989
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 3.1 MW |
Winter Capacity | 3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1989 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Pelzer Lower Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1173 | Hillcrest Pump Station | Denver, CO | 4.8 GWh |
#1174 | Michell Butte Power Project | Nyssa, OR | 4.8 GWh |
#1175 | Clam River Dam | Danbury, WI | 4.8 GWh |
#1176 | Austin | Austin, TX | 4.7 GWh |
#1177 | Taftville | Taftville, CT | 4.7 GWh |
#1178 | Chasm Hydro Partnership | Chateaugay, NY | 4.7 GWh |
#1179 | Stairs | Salt Lake City, UT | 4.6 GWh |
#1180 | Iowa Hydro LLC | Maquoketa, IA | 4.6 GWh |
#1181 | Center Falls | Greenwich, NY | 4.6 GWh |
#1182 | Pelzer Upper | Petzer, SC | 4.6 GWh |
#1184 | Franklin (NC) | Franklin, NC | 4.6 GWh |
#1185 | Little Mac Project | Buhl, ID | 4.5 GWh |
#1186 | Chester Lake | Metlakatla, AK | 4.5 GWh |
#1187 | Gantt | Andalusia, AL | 4.5 GWh |
#1188 | Lower No 2 | Idaho Falls, ID | 4.5 GWh |
#1189 | Salisbury | Salisbury, VT | 4.5 GWh |
#1190 | West Danville 15 | Danville, VT | 4.5 GWh |
#1191 | Little Cottonwood | Sandy, UT | 4.4 GWh |
#1192 | Piedmont Hydro Power Project | Piedmont, SC | 4.4 GWh |
#1193 | Oconto Falls Lower | Oconto Falls, WI | 4.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pelzer Lower.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ace Solar | Piedmont, SC | 2.1 GWh | 8.6 mi |
Adams | Piedmont, SC | 4.5 GWh | 7.1 mi |
Anderson (SC) | Anderson, SC | 4.0 GWh | 15.5 mi |
Berry Road Solar | Pelzer, SC | 3.1 GWh | 7 mi |
Bluebird Solar SC LLC | Pendleton, SC | 6.6 GWh | 16.6 mi |
BMW Manufacturing Co | Greer, SC | 31.7 GWh | 24.5 mi |
Boyds Mill Hydro | Ware Shoals, SC | 3.8 GWh | 18 mi |
Central Energy Facility | Clemson, SC | 2.0 MWh | 22.7 mi |
Duke Energy CHP at Clemson University | Clemson, SC | 108.5 GWh | 21.7 mi |
Enoree Phase II Landfill Gas Recovery | Greer, SC | 283.0 MWh | 19.6 mi |
Hollidays Bridge Hydro | Honea Path, SC | 9.3 GWh | 7.4 mi |
Honea Path | Honea Path, SC | 66.0 MWh | 13 mi |
Pelzer Solar I | Pelzer, SC | 2.0 GWh | 4.2 mi |
Pelzer Upper | Petzer, SC | 4.6 GWh | 1.8 mi |
Piedmont Hydro Power Project | Piedmont, SC | 4.4 GWh | 6 mi |
Pinson Solar Farm | Woodruff, SC | 39.1 GWh | 23.2 mi |
Saluda Dam | Greenville, SC | 6.2 GWh | 16.4 mi |
W S Lee | Williamston, SC | 5.8 TWh | 1.2 mi |
White Horse Solar A | Greenville, SC | 3.4 GWh | 12.1 mi |
Whitt Solar | Piedmont, SC | 4.1 GWh | 8.5 mi |