Pelton
4133 NW Pelton Dam Rd, Madras, OR 97741Plant Summary Information
Pelton is ranked #26 out of 255 power plants in Oregon in terms of total annual net electricity generation.
Pelton is comprised of 3 generators and generated 89.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pelton |
---|---|
Utility Name | Portland General Electric Co |
Location | Jefferson County, OR |
Initial Operation Date | December 1957 |
Last Update | Dec 2023 |
Annual Generation | 347.5 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,656 out of 11,835 Power Plants Nationwide | |
Ranked #134 out of 1,371 Water Power Plants Nationwide | |
Ranked #26 out of 255 Oregon Power Plants | |
Ranked #8 out of 60 Oregon Water Power Plants | |
Fuel Types | Water |
Map of Pelton
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pelton.
Monthly Net Generation for Pelton
Pelton Details
Summary Information | |
---|---|
Plant Name | Pelton (3048) |
Plant Address | 4133 NW Pelton Dam Rd, Madras, OR 97741 |
Utility | Portland General Electric Co (15248) |
Latitude, Longitude | 44.69437, -121.23138 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1957 |
Annual Generation | 347.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Portland General Electric Company (PGE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Deschutes River |
Ash Impoundment | No |
Transmission / Distribution Owner | Portland General Electric Co (15248) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1957
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | PNP1_2_GNODE1-3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNP-RBP_2_PELRB |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 38 MW |
Winter Capacity | 38 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1957 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating March 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | PNP1_2_GNODE1-3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNP-RBP_2_PELRB |
Nameplate Capacity | 32.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 36 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating April 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | PNP1_2_GNODE1-3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PNP-RBP_2_PELRB |
Nameplate Capacity | 32.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 36 MW |
Winter Capacity | 36 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Pelton Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Portland General Electric Co | 121 SW Salmon Street, Portland, OR 97204 | Generator 1 | 50.10% |
Warm Springs Power Enterprises | P O Box 960, 5180 Jackson Trail Road, Warm Springs, OR 97761 | Generator 1 | 49.90% |
Portland General Electric Co | 121 SW Salmon Street, Portland, OR 97204 | Generator 2 | 50.10% |
Warm Springs Power Enterprises | P O Box 960, 5180 Jackson Trail Road, Warm Springs, OR 97761 | Generator 2 | 49.90% |
Portland General Electric Co | 121 SW Salmon Street, Portland, OR 97204 | Generator 3 | 50.10% |
Warm Springs Power Enterprises | P O Box 960, 5180 Jackson Trail Road, Warm Springs, OR 97761 | Generator 3 | 49.90% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#124 | C J Strike | Bruneau, ID | 377.1 GWh |
#125 | Keswick | Redding, CA | 373.0 GWh |
#126 | Pit 5 | Big Bend, CA | 370.1 GWh |
#127 | Old Hickory | Hendersonville, TN | 368.7 GWh |
#128 | James B Black | Big Bend, CA | 367.0 GWh |
#129 | Douglas Dam | Dandridge, TN | 364.9 GWh |
#130 | Kerckhoff 2 | Auberry, CA | 357.0 GWh |
#131 | Trinity | Weaverville, CA | 356.3 GWh |
#132 | Electra | Jackson, CA | 354.4 GWh |
#133 | Donnells | None, CA | 347.7 GWh |
#135 | Pit 3 | Burney, CA | 345.4 GWh |
#136 | Logan Martin Dam | Vincent, AL | 343.5 GWh |
#137 | Dam 2 | Dumas, AR | 342.3 GWh |
#138 | Caribou 2 | Belden, CA | 341.8 GWh |
#139 | Thermalito | Oroville, CA | 341.8 GWh |
#140 | John H Kerr | Boydton, VA | 340.0 GWh |
#141 | Stanislaus | Vallecito, CA | 334.5 GWh |
#142 | Lucky Peak Power Plant Project | Boise, ID | 331.8 GWh |
#143 | Richard B Russell | Elberton, GA | 330.5 GWh |
#144 | S C Moore | Littleton, NH | 327.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pelton.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
45 Mile Hydroelectric Project | Culver, OR | 4.8 GWh | 12.1 mi |
Adams Solar Center | Madras, OR | 20.1 GWh | 5.5 mi |
Bear Creek Solar Center | Bend, OR | 21.5 GWh | 43.8 mi |
Bend | Bend, OR | 83.0 MWh | 43.9 mi |
Carmen Smith | McKenzie Bridge, OR | 188.6 GWh | 48.9 mi |
Detroit | Mill City, OR | 163.0 GWh | 50.1 mi |
Elbe Solar Center | Madras, OR | 21.8 GWh | 5.4 mi |
Juniper Ridge Hydroelectric Project | Bend, OR | 10.9 GWh | 38.2 mi |
Millican Solar Energy LLC | Prineville, OR | 139.5 GWh | 50.8 mi |
NorWest Energy 2, LLC | Bend, OR | 18.8 GWh | 43.3 mi |
Oak Grove | Estacada, OR | 152.1 GWh | 50.6 mi |
Opal Springs Hydro | Culver, OR | 24.2 GWh | 14.5 mi |
OSLH, LLC | Bend, OR | 22.4 GWh | 43.8 mi |
Prineville Solar Energy LLC | Prineville, OR | 91.3 GWh | 50.6 mi |
Round Butte | Madras, OR | 780.2 GWh | 6.5 mi |
Siphon Power Project | Bend, OR | 15.6 GWh | 46 mi |
Solar Star Oregon II | Prineville, OR | 124.4 GWh | 38.5 mi |
Stone Creek | Estacada, OR | 46.0 GWh | 41.7 mi |
Tumbleweed Solar, LLC | Redmond, OR | 18.8 GWh | 34.7 mi |
Warm Springs Power Enterprises | Warm Springs, OR | 57.1 GWh | 2.2 mi |