Pecan Row Landfill To Electric Facility
2995 Wetherington Lane, Valdosta, GA 31601Plant Summary Information
Pecan Row Landfill To Electric Facility is ranked #6 out of 12 landfill gas power plants in Georgia in terms of total annual net electricity generation.
Pecan Row Landfill To Electric Facility is comprised of 4 generators and generated 7.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pecan Row Landfill To Electric Facility |
---|---|
Utility Name | EDL Inc |
Location | Lowndes County, GA |
Initial Operation Date | June 1977 |
Last Update | Dec 2023 |
Annual Generation | 30.3 GWh |
Annual Consumption | 410.7 k MMBtu |
Ranked #4,532 out of 11,835 Power Plants Nationwide | |
Ranked #90 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #123 out of 238 Georgia Power Plants | |
Ranked #6 out of 12 Georgia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
ESG Biofuels (Southern Georgia) Company LLC (2013 to 2015) Energy Developments Inc (2016 to 2017) EDL Inc (2018 to 2023) |
Map of Pecan Row Landfill To Electric Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pecan Row Landfill To Electric Facility.
Monthly Net Generation for Pecan Row Landfill To Electric Facility
Pecan Row Landfill To Electric Facility Details
Summary Information | |
---|---|
Plant Name | Pecan Row Landfill To Electric Facility (59221) |
Plant Address | 2995 Wetherington Lane, Valdosta, GA 31601 |
Utility | EDL Inc (55858) |
Latitude, Longitude | 30.815, -83.3625 |
Generation Dates on File | Dec 2013 to Dec 2023 |
Initial Operation Date | June 1977 |
Annual Generation | 30.3 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Colquitt Electric Membership Corp (40212) GA |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator GM04 Details Operating June 1977
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1977 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN1 Details Operating December 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating December 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating December 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Pecan Row Landfill To Electric Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#80 | Georgia LFG Oak Grove Plant | Winder, GA | 38.4 GWh |
#81 | Southeast Berrien Generating Facility | Niles, MI | 31.6 GWh |
#82 | Ameresco Vasco Road | Livermore, CA | 31.5 GWh |
#83 | Ameresco San Joaquin | Linden, CA | 30.9 GWh |
#84 | Amelia | Jetersville, VA | 32.6 GWh |
#85 | Fitchburg Gas Recovery | Westminster, MA | 30.7 GWh |
#86 | Sand Valley Power Station | Collinsville, AL | 30.6 GWh |
#87 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#88 | Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh |
#89 | Brevard | Cocoa, FL | 30.4 GWh |
#91 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh |
#92 | Ameresco Delaware South | Georgetown, DE | 29.6 GWh |
#93 | Mahoning | New Springfield, OH | 28.9 GWh |
#94 | Lincoln Landfill | Lincoln, CA | 28.8 GWh |
#95 | Ameresco Keller Canyon | Bay Point, CA | 28.7 GWh |
#96 | Model City Energy Facility | Youngstown, NY | 28.6 GWh |
#97 | Riverview Energy Systems | Riverview, MI | 28.3 GWh |
#98 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#99 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#100 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pecan Row Landfill To Electric Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Denver Braswell PV | Moultrie, GA | 2.6 GWh | 42.3 mi |
Hamilton Solar Power Plant | Jasper, FL | 152.0 GWh | 27.7 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.5 GWh | 23.4 mi |
Lowndes Cowart | Valdosta, GA | 1.1 GWh | 6.1 mi |
Lowndes IDA | Valdosta, GA | 2.9 GWh | 8.1 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 14.5 mi |
Moody Air Force Base Solar | Valdosta, GA | 75.6 GWh | 12.9 mi |
PCA-Valdosta Mill | Valdosta, GA | 306.6 GWh | 9 mi |
Quitman II Solar | Quitman, GA | 322.4 GWh | 17.5 mi |
Quitman Solar | Quitman, GA | 340.1 GWh | 16.8 mi |
SR Odom | Moultrie, GA | 47.4 GWh | 22.4 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 32.2 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 32.3 mi |
Swift Creek Chemical Complex | White Springs, FL | 71.9 GWh | 38.8 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 153.7 GWh | 33.6 mi |
Valdosta | Valdosta, GA | 1.5 GWh | 8.1 mi |
Valdosta Prison | Valdosta, GA | 1.8 GWh | 6.9 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh | 9.4 mi |
Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 16.4 mi |
Winquepin Renewable Energy Center | Lee, FL | 71.0 GWh | 37 mi |