Pecan PV1
163 Pecan Rd, Cordova, NC 28330Plant Summary Information
Pecan PV1 is ranked #254 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Pecan PV1 generated 2.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pecan PV1 |
---|---|
Utility Name | Ecoplexus, Inc |
Location | Richmond County, NC |
Initial Operation Date | December 2014 |
Last Update | Dec 2023 |
Annual Generation | 9.2 GWh |
Annual Consumption | 32.8 k MMBtu |
Ranked #6,149 out of 11,852 Power Plants Nationwide | |
Ranked #1,703 out of 5,655 Solar Power Plants Nationwide | |
Ranked #328 out of 863 North Carolina Power Plants | |
Ranked #254 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Pecan PV1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pecan PV1.
Monthly Net Generation for Pecan PV1
Pecan PV1 Details
Summary Information | |
---|---|
Plant Name | Pecan PV1 (59157) |
Plant Address | 163 Pecan Rd, Cordova, NC 28330 |
Utility | Ecoplexus, Inc (58970) |
Latitude, Longitude | 34.90917, -79.82944 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | December 2014 |
Annual Generation | 9.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-376 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator PEC1 Details Operating December 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 7 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pecan PV1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Fresh Air Energy XIII LLC | 101 2nd St., Ste. 1250, San Francisco, CA 94105 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1693 | Wellons Farm | Smithfield, NC | 9.2 GWh |
#1694 | Mocksville Farm | Mocksville, NC | 9.2 GWh |
#1695 | Nash 97 Solar, LLC | Middlesex, NC | 9.2 GWh |
#1696 | Bolton Farm | Warrenton, NC | 9.2 GWh |
#1697 | Davis Lane Solar, LLC | Edenton, NC | 9.2 GWh |
#1698 | Rock Farm | Rockingham, NC | 9.2 GWh |
#1699 | Walters Solar (FLS 260) | Orrum, NC | 9.2 GWh |
#1700 | Sartell Holdco CSG | Sartell, MN | 9.2 GWh |
#1701 | Haley Solar | Allendale, SC | 9.2 GWh |
#1702 | Fisher Solar Farm - NC | Oakboro, NC | 9.2 GWh |
#1704 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.2 GWh |
#1705 | North Nash Farm, LLC | Castalia, NC | 9.2 GWh |
#1706 | Tiburon Holdings | Advance, NC | 9.2 GWh |
#1707 | Bayboro Solar Farm | Alliance, NC | 9.2 GWh |
#1708 | Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 9.2 GWh |
#1709 | Mustang Solar | Robbins, NC | 9.2 GWh |
#1710 | Windsor Solar | Windsor, NC | 9.2 GWh |
#1711 | Lincoln Solar, LLC (NC) | Bostic, NC | 9.2 GWh |
#1712 | Monroe County Sites C, D, & E | Hilton, NY | 9.2 GWh |
#1713 | Sweetgum Solar | Sanford, NC | 9.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pecan PV1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anson County Generation Facility | Lilesville, NC | 92.2 GWh | 6.6 mi |
Blewett | Lilesville, NC | 116.1 GWh | 5.8 mi |
County Home Solar LLC | Rockingham, NC | 9.6 GWh | 6.1 mi |
Ellerbe | Ellerbe, NC | 3.2 GWh | 14.3 mi |
ESA Hamlet NC , LLC | Hamlet, NC | 8.1 GWh | 9.1 mi |
Hamlet Generating Facility | Hamlet, NC | 76.7 GWh | 7 mi |
Hamlet Solar Energy Storage | Hamlet, NC | 252.0 MWh | 6.9 mi |
Hickson Solar, LLC | Wallace, SC | 4.7 GWh | 14.9 mi |
Innovative Solar 37 LLC | Morven, NC | 117.4 GWh | 8.1 mi |
Mills Anson Farm | Lilesville, NC | 8.7 GWh | 7.3 mi |
Polk Farm | Hamlet, NC | 11.1 GWh | 10 mi |
Rock Farm | Rockingham, NC | 9.2 GWh | 13 mi |
Rockingham Solar, LLC | Marston, NC | 9.5 GWh | 13.7 mi |
Sellers Farm Solar | Hamlet, NC | 10.6 GWh | 9.5 mi |
Selwyn Farm | Lilesville, NC | 10.9 GWh | 10.2 mi |
Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh | 7 mi |
Wadesboro Farm 1 | Wadesboro, NC | 8.6 GWh | 16.2 mi |
Wadesboro Farm 2 | Wadesboro, NC | 9.4 GWh | 16.9 mi |
Wadesboro Farm 3 | Wadesboro, NC | 9.2 GWh | 13.2 mi |
Wadesboro Solar | Wadesboro, NC | 9.4 GWh | 12.2 mi |