Peak View Wind Farm
15391 State Highway 10, Walsenburg, CO 81089Plant Summary Information
Peak View Wind Farm is ranked #25 out of 34 wind farms in Colorado in terms of total annual net electricity generation.
Peak View Wind Farm generated 45.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Peak View Wind Farm |
---|---|
Utility Name | Black Hills Colorado Electric, LLC |
Location | Huerfano County, CO |
Initial Operation Date | November 2016 |
Last Update | Dec 2023 |
Annual Generation | 183.4 GWh |
Annual Consumption | 689.0 k MMBtu |
Ranked #2,409 out of 11,836 Power Plants Nationwide | |
Ranked #733 out of 1,343 Wind Power Plants Nationwide | |
Ranked #51 out of 267 Colorado Power Plants | |
Ranked #25 out of 34 Colorado Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Black Hills/Colorado Elec.Util (2015 to 2017) Black Hills Colorado Electric, LLC (2018 to 2023) |
Map of Peak View Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Peak View Wind Farm.
Monthly Net Generation for Peak View Wind Farm
Peak View Wind Farm Details
Summary Information | |
---|---|
Plant Name | Peak View Wind Farm (60143) |
Plant Address | 15391 State Highway 10, Walsenburg, CO 81089 |
Utility | Black Hills Colorado Electric, LLC (56146) |
Latitude, Longitude | 37.71044, -104.50546 |
Generation Dates on File | Nov 2016 to Dec 2023 |
Initial Operation Date | November 2016 |
Annual Generation | 183.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Black Hills/Colorado Elec.Util (56146) CO |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator WTG Details Operating November 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 60.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 60.8 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 34 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 34 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.79-100 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.5 |
Peak View Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#723 | Dempsey Ridge Wind Farm | Cheyenne, OK | 187.8 GWh |
#724 | Rolling Hills | Glenrock, WY | 187.8 GWh |
#725 | Locust Ridge II LLC | Shenandoah, PA | 187.8 GWh |
#726 | Wilton Wind II LLC | Wilton, ND | 187.0 GWh |
#727 | Perrin Ranch Wind LLC | Williams, AZ | 186.4 GWh |
#728 | Alta Wind VIII | Mojave, CA | 186.4 GWh |
#729 | Silver Star I Wind Power Project | Dublin, TX | 186.1 GWh |
#730 | Cohocton Wind Project | Cohocton, NY | 185.4 GWh |
#731 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#732 | Pinnacle Wind Force LLC | Keyser, WV | 184.0 GWh |
#734 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#735 | Los Vientos Wind 1B | Sebastian, TX | 182.1 GWh |
#736 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#737 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#738 | Harvest 2 | Elkton, MI | 180.2 GWh |
#739 | FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh |
#740 | Busch Ranch II Wind Farm | Walsenburg, CO | 179.7 GWh |
#741 | Strauss Wind Farm | Lompoc, CA | 179.6 GWh |
#742 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#743 | Arlington Wind Power Project | Arlington, OR | 177.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Peak View Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bighorn Solar 1 | Pueblo, CO | 600.1 GWh | 34.7 mi |
Busch Ranch II Wind Farm | Walsenburg, CO | 179.7 GWh | 5.7 mi |
Busch Ranch Wind Energy Farm | Walsenburg, CO | 85.2 GWh | 6.3 mi |
CEC Solar #1117, LLC | Pueblo, CO | 7.2 GWh | 39.7 mi |
Comanche (CO) | Pueblo, CO | 5.7 TWh | 34.6 mi |
Comanche Solar | Pueblo, CO | 251.5 GWh | 34.4 mi |
CSU Pueblo | Pueblo, CO | 1.1 GWh | 41.4 mi |
CSWIND America Inc. | Pueblo, CO | 5.9 GWh | 32.3 mi |
Fountain Valley Power Facility | Fountain, CO | 70.3 GWh | 59.3 mi |
Huerfano River Wind | Walsenburg, CO | 12.4 GWh | 18.4 mi |
James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 40.4 mi |
Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh | 43.1 mi |
NSE Camber BH CSG 2, LLC | Ordway, CO | 3.7 GWh | 53.8 mi |
Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 42.2 mi |
San Isabel Solar, LLC | Trinidad, CO | 75.4 GWh | 29.8 mi |
Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 475.5 GWh | 32.5 mi |
Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh | 33.6 mi |
Trinidad (CO) | Trinidad, CO | 26.0 MWh | 36.7 mi |
USS Giveback Solar LLC (CSG) | Pueblo, CO | 60.0 MWh | 32.9 mi |
Vestas Towers America, Inc. | Pueblo, CO | 2.4 GWh | 32.5 mi |