PCS Phosphate
1530 NC HWY 306 South, Aurora, NC 27806Plant Summary Information
PCS Phosphate is ranked #3 out of 31 waste heat power plants nationwide in terms of total annual net electricity generation.
PCS Phosphate is comprised of 1 generator and generated 47.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | PCS Phosphate |
---|---|
Utility Name | PCS Phosphate |
Location | Beaufort County, NC |
Initial Operation Date | December 1984 |
Last Update | Aug 2024 |
Annual Generation | 256.1 GWh |
Annual Consumption | 950.2 k MMBtu |
Ranked #2,013 out of 11,835 Power Plants Nationwide | |
Ranked #3 out of 31 Waste Heat Power Plants Nationwide | |
Ranked #29 out of 862 North Carolina Power Plants | |
Ranked #1 out of 1 North Carolina Waste Heat Power Plants | |
Fuel Types | Waste Heat |
Map of PCS Phosphate
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PCS Phosphate.
Monthly Net Generation for PCS Phosphate
PCS Phosphate Details
Summary Information | |
---|---|
Plant Name | PCS Phosphate (50509) |
Plant Address | 1530 NC HWY 306 South, Aurora, NC 27806 |
Utility | PCS Phosphate (22175) |
Latitude, Longitude | 35.37627, -76.77986 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | December 1984 |
Annual Generation | 256.1 GWh |
Fuel Types | Waste Heat |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 84-183-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Chemical Manufacturing (325) |
Sector | Industrial CHP (7) |
Water Source | Castle Haynes Aquifer |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 1984
Technology | All Other |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.97 |
Summer Capacity | 54 MW |
Winter Capacity | 54 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1984 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | B |
Energy Source | Waste Heat |
Startup Source | Distillate Fuel Oil / Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
PCS Phosphate Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Waste Heat.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Heat Recovery Coke Facility | East Chicago, IN | 450.6 GWh |
#2 | Mosaic New Wales Operations | Mulberry, FL | 413.0 GWh |
#4 | St. Mary Clean Energy Center | Centerville, LA | 218.8 GWh |
#5 | Wilmington Hydrogen Plant | Wilmington, CA | 179.9 GWh |
#6 | Lake Charles Plant | Sulphur, LA | 154.8 GWh |
#7 | OREG 1 Inc | Culbertson, MT | 148.4 GWh |
#8 | Mosaic South Pierce Operations | Mulberry, FL | 142.2 GWh |
#9 | Mosaic Co Bartow Facility | Bartow, FL | 122.0 GWh |
#10 | OREG 2 Inc | Culbertson, MT | 107.0 GWh |
#11 | ADA Carbon Solutions Red River | Coushatta, LA | 102.0 GWh |
#12 | Kennecott Power Plant | Magna, UT | 122.8 GWh |
#13 | Bayway Refinery | Linden, NJ | 70.1 GWh |
#14 | Simplot Leasing Don Plant | Pocatello, ID | 68.6 GWh |
#15 | Rentech Nitrogen Pasadena Cogeneration | Pasadena, TX | 65.4 GWh |
#16 | Phillips 66 Carbon Plant | Rodeo, CA | 50.1 GWh |
#17 | Williams Ignacio Natural Gas Plant | Durango, CO | 47.9 GWh |
#18 | Veyo Heat Recovery Project | Gunlock, UT | 45.8 GWh |
#19 | Glen Ullin Station 6 | Glen Ullin, ND | 38.0 GWh |
#20 | OREG 3 Inc | Trimont, MN | 35.8 GWh |
#21 | Ivanhoe Generation Facility | Franklin, LA | 32.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PCS Phosphate.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andrew Solar | New Bern, NC | 9.1 GWh | 23.8 mi |
Bay Branch Solar | Chocowinity, NC | 10.7 GWh | 20.3 mi |
Bayboro Solar Farm | Alliance, NC | 9.2 GWh | 15.8 mi |
Beaufort Solar, LLC | Chocowinity, NC | 27.6 GWh | 20.7 mi |
Choco Solar, LLC | Chocowinity, NC | 10.1 GWh | 20.1 mi |
Chocowinity Solar LLC | Chocowinity, NC | 8.0 GWh | 19.9 mi |
Coogee Solar | Grantsboro, NC | 11.5 GWh | 15.8 mi |
Grove Solar | New Bern, NC | 13.2 GWh | 23.9 mi |
International Paper Co. - New Bern Mill | New Bern, NC | 205.1 GWh | 22 mi |
New Bern Farm | Ernul, NC | 8.3 GWh | 19.4 mi |
Pamlico Partners Solar | Washington, NC | 8.2 GWh | 10 mi |
Plott Hound Solar | New Bern, NC | 7.4 GWh | 24.1 mi |
Porter Solar | New Bern, NC | 8.3 GWh | 19.9 mi |
Rose Acre Solar Energy Storage | Currituck, NC | 1.5 GWh | 22.7 mi |
Sweet Tea Solar, LLC | New Bern, NC | 6.2 GWh | 24.9 mi |
TWE Chocowinity Solar, LLC | Chocowinity, NC | 5.9 GWh | 20.3 mi |
Washington Airport Solar LLC | Washington, NC | 9.0 GWh | 20.2 mi |
Washington Millfield Solar, LLC | Bath, NC | 8.4 GWh | 9 mi |
Washington White Post Solar LLC | Bath, NC | 19.2 GWh | 9.7 mi |
Wilkinson Solar LLC | Pantego, NC | 131.4 GWh | 15.3 mi |