PCA-Valdosta Mill
5495 Clyattville-Lake Park Roa, Valdosta, GA 31601Plant Summary Information
PCA-Valdosta Mill is ranked #38 out of 85 black liquor power plants nationwide in terms of total annual net electricity generation.
PCA-Valdosta Mill is comprised of 3 generators and generated 78.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | PCA-Valdosta Mill |
---|---|
Utility Name | PCA-Valdosta Mill |
Location | Lowndes County, GA |
Initial Operation Date | January 1954 |
Last Update | Dec 2023 |
Annual Generation | 306.6 GWh |
Annual Consumption | 13.1 M MMBtu |
Ranked #1,820 out of 11,852 Power Plants Nationwide | |
Ranked #38 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #37 out of 239 Georgia Power Plants | |
Ranked #7 out of 11 Georgia Black Liquor Power Plants | |
Fuel Types | Black Liquor : 64.3% Wood/Wood Waste Solids : 31.9% Natural Gas : 3.8% |
Map of PCA-Valdosta Mill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PCA-Valdosta Mill.
Monthly Net Generation for PCA-Valdosta Mill
PCA-Valdosta Mill Details
Summary Information | |
---|---|
Plant Name | PCA-Valdosta Mill (60084) |
Plant Address | 5495 Clyattville-Lake Park Roa, Valdosta, GA 31601 |
Utility | PCA-Valdosta Mill (59833) |
Latitude, Longitude | 30.69444, -83.30306 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | January 1954 |
Annual Generation | 306.6 GWh |
Fuel Types | Black Liquor : 64.3% Wood/Wood Waste Solids : 31.9% Natural Gas : 3.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 06-104-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Paperboard Mills (32213) |
Sector | Industrial CHP (7) |
Water Source | Floridan Aquifer |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | Southern Natural Gas (Option not listed) |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator TG1 Details Operating January 1954
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | N/A |
RTO ISO Location Designation For Reporting Wholesale Sales Data | N/A |
Nameplate Capacity | 10.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.1 MW |
Winter Capacity | 10.1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1954 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Wood/Wood Waste Solids / Natural Gas / Residual Fuel Oil / Other Biomass Liquids |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | WDS / NG / RFO / OBL |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 10.1 MW |
Net Winter Capacity With Natural Gas | 10.1 MW |
Net Summer Capacity With Oil | 10.1 MW |
Net Winter Capacity With Oil | 10.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Generator TG2 Details Operating January 1954
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1954 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Wood/Wood Waste Solids / Natural Gas / Residual Fuel Oil / Other Biomass Liquids |
Startup Source | Natural Gas / Residual Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | WDS / NG / RFO / OBL |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 7.5 MW |
Net Winter Capacity With Natural Gas | 7.5 MW |
Net Summer Capacity With Oil | 7.5 MW |
Net Winter Capacity With Oil | 7.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Generator TG3 Details Operating October 2011
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 52.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 52.3 MW |
Winter Capacity | 52.3 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2011 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
---|---|
Topping Or Bottoming | T |
Energy Source | Black Liquor / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BLQ / NG |
---|
PCA-Valdosta Mill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#28 | Somerset Plant | Skowhegan, ME | 495.5 GWh |
#29 | International Paper Valliant OK | Valliant, OK | 450.2 GWh |
#30 | Graphic Packaging International Augusta Mill | Augusta, GA | 382.7 GWh |
#31 | International Paper Franklin Mill | Franklin, VA | 276.9 GWh |
#32 | WestRock-West Point Mill | West Point, VA | 504.4 GWh |
#33 | Rumford Cogeneration | Rumford, ME | 410.8 GWh |
#34 | Boise Cascade International Falls | International Falls, MN | 336.6 GWh |
#35 | Florence Mill | Florence, SC | 405.5 GWh |
#36 | Clearwater Paper IPP Lewiston | Lewiston, ID | 371.6 GWh |
#37 | Westrock Hodge (LA) | Hodge, LA | 412.2 GWh |
#39 | DeRidder Mill | DeRidder, LA | 389.0 GWh |
#40 | Pixelle Specialty Solutions LLC - Spring Grove Facility | Spring Grove, PA | 389.5 GWh |
#41 | Billerud Quinnesec Mill | Norway, MI | 288.8 GWh |
#42 | International Paper Texarkana Mill | Queen City, TX | 378.2 GWh |
#43 | Alabama River Pulp | Perdue Hill, AL | 302.9 GWh |
#44 | WestRock Demopolis Mill | Demopolis, AL | 290.7 GWh |
#45 | Georgia-Pacific Palatka Operations | Palatka, FL | 320.3 GWh |
#46 | Escanaba Mill | Escanaba, MI | 408.7 GWh |
#47 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 344.1 GWh |
#48 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 278.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PCA-Valdosta Mill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Echo River Solar | Live Oak, FL | 152.5 GWh | 37.9 mi |
Hamilton Solar Power Plant | Jasper, FL | 148.6 GWh | 18.6 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.5 GWh | 27.3 mi |
Lowndes Cowart | Valdosta, GA | 1.1 GWh | 8.5 mi |
Lowndes IDA | Valdosta, GA | 2.9 GWh | 10.7 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 8.1 mi |
Moody Air Force Base Solar | Valdosta, GA | 72.2 GWh | 18.8 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh | 9 mi |
Quitman II Solar | Quitman, GA | 311.0 GWh | 23.7 mi |
Quitman Solar | Quitman, GA | 330.2 GWh | 22.8 mi |
SR Odom | Moultrie, GA | 47.4 GWh | 31.2 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 23.2 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 23.3 mi |
Swift Creek Chemical Complex | White Springs, FL | 71.9 GWh | 31 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 151.8 GWh | 25.4 mi |
Valdosta | Valdosta, GA | 1.5 GWh | 9.2 mi |
Valdosta Prison | Valdosta, GA | 1.8 GWh | 14.2 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh | 15.4 mi |
Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 25.2 mi |
Winquepin Renewable Energy Center | Lee, FL | 74.8 GWh | 28.5 mi |