Pavant Solar, LLC
1325 W 8900 N, Fillmore, UT 84631Plant Summary Information
Pavant Solar, LLC is ranked #43 out of 121 power plants in Utah in terms of total annual net electricity generation.
Pavant Solar, LLC generated 16.7 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Pavant Solar, LLC |
---|---|
Utility Name | Onward Energy |
Location | Millard County, UT |
Initial Operation Date | December 2015 |
Last Update | Jan 2025 |
Annual Generation | 112.1 GWh |
Annual Consumption | 396.1 k MMBtu |
Ranked #3,109 out of 11,979 Power Plants Nationwide | |
Ranked #607 out of 5,765 Solar Power Plants Nationwide | |
Ranked #43 out of 121 Utah Power Plants | |
Ranked #24 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Dominion Renewable Energy (2014 to 2020) Onward Energy (2021 to 2023) |
Map of Pavant Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pavant Solar, LLC.
Monthly Net Generation for Pavant Solar, LLC
Pavant Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Pavant Solar, LLC (59702) |
Plant Address | 1325 W 8900 N, Fillmore, UT 84631 |
Utility | Onward Energy (60453) |
Latitude, Longitude | 38.96052, -112.36327 |
Generation Dates on File | Dec 2015 to Jan 2025 |
Initial Operation Date | December 2015 |
Annual Generation | 112.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-479-001 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG15-115-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 62.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pavant Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#597 | Macho Springs | Deming, NM | 115.5 GWh |
#598 | Wimauma Solar | Wimauma, FL | 115.0 GWh |
#599 | Hawtree Solar | Warrenton, NC | 114.3 GWh |
#600 | Platteview Solar LLC | Ashland, NE | 113.6 GWh |
#601 | Porter Solar, LLC (TX) | Krum, TX | 113.6 GWh |
#602 | Horizon Solar Energy Center | Hawthorne, FL | 113.5 GWh |
#603 | Silver State Solar Power North | Primm, NV | 113.5 GWh |
#604 | Copperhead Solar, LLC | Riesel, TX | 111.2 GWh |
#605 | BT Cooke Solar, LLC | Gainsville, TX | 112.4 GWh |
#606 | Landrace Holdings, LLC | Conway, SC | 112.4 GWh |
#608 | SEGS IX | Hinkley, CA | 112.0 GWh |
#609 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 111.8 GWh |
#610 | Ranchland Solar, LLC | Moyock, NC | 111.8 GWh |
#611 | Ocotillo Wells | Borrego Springs, CA | 111.7 GWh |
#612 | Manatee Solar Energy Center | Parrish, FL | 95.5 GWh |
#613 | Sandstone Solar | Florence, AZ | 111.1 GWh |
#614 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 110.3 GWh |
#615 | Beacon Solar Plant Site 2 | Cantil, CA | 109.9 GWh |
#616 | Lick Creek Solar, LLC | Walnut Cove, NC | 109.6 GWh |
#617 | SR Turkey Creek, LLC | Lancaster, KY | 109.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pavant Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blundell | Milford, UT | 248.2 GWh | 41.9 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 30 mi |
Escalante Solar I, LLC | Milford, UT | 212.6 GWh | 47.1 mi |
Escalante Solar II, LLC | Milford, UT | 213.9 GWh | 48 mi |
Escalante Solar III, LLC | Milford, UT | 210.9 GWh | 46.4 mi |
Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 51.2 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 52.7 mi |
Gunnison Solar | Gunnison, UT | 3.9 GWh | 33.4 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 57.7 mi |
Intermountain Power Project | Delta, UT | 6.3 TWh | 39.7 mi |
Manti Lower | Manti, UT | 1.8 GWh | 44.7 mi |
Manti Upper | Manti, UT | 58.0 MWh | 44.7 mi |
Milford 2 | Milford, UT | 6.5 GWh | 52.1 mi |
Milford Solar 1 | Milford, UT | 255.2 GWh | 48 mi |
Milford Wind Corridor I LLC | Milford, UT | 376.3 GWh | 42.6 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 171.5 GWh | 40.1 mi |
Pavant Solar II LLC | Fillmore, UT | 102.4 GWh | 14 mi |
Pavant Solar III | Filmore, UT | 40.8 GWh | 13.4 mi |
Sigurd Solar LLC | Sigurd, UT | 201.4 GWh | 20.7 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 48.2 mi |