Pavant Solar III
1920 W 8900 W, Filmore, UT 84631Plant Summary Information
Pavant Solar III is ranked #27 out of 51 solar farms in Utah in terms of total annual net electricity generation.
Pavant Solar III generated 7.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Pavant Solar III |
---|---|
Utility Name | Invenergy Services LLC |
Location | Millard County, UT |
Initial Operation Date | December 2016 |
Last Update | Dec 2023 |
Annual Generation | 40.8 GWh |
Annual Consumption | 145.1 k MMBtu |
Ranked #4,120 out of 11,835 Power Plants Nationwide | |
Ranked #858 out of 5,643 Solar Power Plants Nationwide | |
Ranked #53 out of 121 Utah Power Plants | |
Ranked #27 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Pavant Solar III LLC (2016 to 2018) AEP Renewables (2019 to 2022) Invenergy Services LLC (2023 to 2023) |
Map of Pavant Solar III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pavant Solar III.
Monthly Net Generation for Pavant Solar III
Pavant Solar III Details
Summary Information | |
---|---|
Plant Name | Pavant Solar III (60886) |
Plant Address | 1920 W 8900 W, Filmore, UT 84631 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 39.15447, -112.35985 |
Generation Dates on File | Dec 2016 to Dec 2023 |
Initial Operation Date | December 2016 |
Annual Generation | 40.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator PSIII Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 25.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pavant Solar III Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#848 | Redwood 4 Solar Farm | Edison, CA | 42.0 GWh |
#849 | Briel Solar Farm | Standston, VA | 41.8 GWh |
#850 | Decatur County Solar Project | Bainbridge, GA | 41.6 GWh |
#851 | Hampton Solar 2 | Hampton, SC | 41.5 GWh |
#852 | Temperance Solar, LLC | Erie, MI | 41.3 GWh |
#853 | DD Fayetteville Solar NC LLC | Fayetteville, NC | 41.3 GWh |
#854 | Calipatria Solar Farm | Calipatria, CA | 41.2 GWh |
#855 | Cotton Center Solar Hybrid | Gila Bend, AZ | 41.2 GWh |
#856 | Grassfield Solar | Chesapeake, VA | 41.0 GWh |
#857 | Summer Solar LLC | Lancaster, CA | 40.9 GWh |
#859 | RE Kent South, LLC | Lemoore, CA | 40.6 GWh |
#860 | Maricopa West Solar PV, LLC | Taft, CA | 40.6 GWh |
#861 | Cork Oak Solar | Halifax, NC | 40.6 GWh |
#862 | Solar Blythe LLC | Blythe, CA | 40.5 GWh |
#863 | Solar Blythe 2 | Blythe, CA | 40.5 GWh |
#864 | Energix Leatherwood, LLC | Axton, VA | 40.3 GWh |
#865 | Hyder Solar Hybrid | Hyder, AZ | 40.2 GWh |
#866 | Frontier Solar LLC | Newman, CA | 40.1 GWh |
#867 | Blackwell Solar Park | Lost Hills, CA | 40.1 GWh |
#868 | SR McNeal | McNeal, AZ | 38.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pavant Solar III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blundell | Milford, UT | 248.2 GWh | 53.1 mi |
Clover Creek Solar Community Solar | Mona, UT | 200.0 GWh | 53.7 mi |
Currant Creek | Mona, UT | 2.8 TWh | 52.4 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 42.7 mi |
Escalante Solar I, LLC | Milford, UT | 212.6 GWh | 56.7 mi |
Escalante Solar II, LLC | Milford, UT | 212.9 GWh | 57.8 mi |
Escalante Solar III, LLC | Milford, UT | 209.7 GWh | 56.6 mi |
Gunnison Solar | Gunnison, UT | 3.9 GWh | 30 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 55 mi |
Intermountain Power Project | Delta, UT | 4.1 TWh | 27.2 mi |
Manti Lower | Manti, UT | 1.8 GWh | 40.1 mi |
Manti Upper | Manti, UT | 58.0 MWh | 40.1 mi |
Milford Solar 1 | Milford, UT | 260.4 GWh | 58 mi |
Milford Wind Corridor I LLC | Milford, UT | 346.0 GWh | 52.8 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 162.6 GWh | 49.9 mi |
Pavant Solar II LLC | Fillmore, UT | 102.4 GWh | 1.1 mi |
Pavant Solar, LLC | Fillmore, UT | 110.1 GWh | 13.4 mi |
Sigurd Solar LLC | Sigurd, UT | 207.6 GWh | 28.3 mi |
Unit 4 | Mt Pleasent, UT | 3.2 GWh | 57 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 61.6 mi |