Parr Hydro
1492 Parr Road, Jenkinsville, SC 29065Plant Summary Information
Parr Hydro is ranked #14 out of 29 hydroelectric power plants in South Carolina in terms of total annual net electricity generation.
Parr Hydro is comprised of 6 generators and generated 7.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Parr Hydro |
---|---|
Utility Name | Dominion Energy South Carolina, Inc |
Location | Fairfield County, SC |
Initial Operation Date | August 1914 |
Last Update | Dec 2023 |
Annual Generation | 46.9 GWh |
Annual Consumption | 176.6 k MMBtu |
Ranked #3,934 out of 11,835 Power Plants Nationwide | |
Ranked #521 out of 1,371 Water Power Plants Nationwide | |
Ranked #55 out of 190 South Carolina Power Plants | |
Ranked #14 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
South Carolina Electric&Gas Company (2013 to 2017) Dominion Energy South Carolina, Inc (2018 to 2023) |
Map of Parr Hydro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Parr Hydro.
Monthly Net Generation for Parr Hydro
Parr Hydro Details
Summary Information | |
---|---|
Plant Name | Parr Hydro (3290) |
Plant Address | 1492 Parr Road, Jenkinsville, SC 29065 |
Utility | Dominion Energy South Carolina, Inc (17539) |
Latitude, Longitude | 34.26132, -81.33085 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1914 |
Annual Generation | 46.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Dominion Energy South Carolina (SCEG) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Broad River |
Ash Impoundment | No |
Transmission / Distribution Owner | Dominion Energy South Carolina (17539) SC |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Operating August 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1914 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2.2 MW |
Planned Net Winter Capacity Uprate | 2.2 MW |
Planned Uprate | December 2027 |
Multiple Fuels | No |
Generator 2 Details Operating August 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1914 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2.2 MW |
Planned Net Winter Capacity Uprate | 2.2 MW |
Planned Uprate | September 2026 |
Multiple Fuels | No |
Generator 3 Details Operating August 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1914 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 0.5 MW |
Planned Net Winter Capacity Uprate | 0.5 MW |
Planned Uprate | March 2025 |
Multiple Fuels | No |
Generator 4 Details Operating August 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1914 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2.2 MW |
Planned Net Winter Capacity Uprate | 2.2 MW |
Planned Uprate | September 2028 |
Multiple Fuels | No |
Generator 5 Details Operating August 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1914 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2.2 MW |
Planned Net Winter Capacity Uprate | 2.2 MW |
Planned Uprate | September 2029 |
Multiple Fuels | No |
Generator 6 Details Operating August 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1921 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 2.2 MW |
Planned Net Winter Capacity Uprate | 2.2 MW |
Planned Uprate | September 2027 |
Multiple Fuels | No |
Parr Hydro Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#511 | Keowee | Seneca, SC | 48.3 GWh |
#512 | Milton | Milton, VT | 48.3 GWh |
#513 | Fond Du Lac | Duluth, MN | 48.1 GWh |
#514 | Slide Creek | Idleyld Park, OR | 48.1 GWh |
#515 | Post Falls | Post Falls, ID | 48.0 GWh |
#516 | Sturgeon | Tillson, NY | 48.0 GWh |
#517 | Abiquiu Dam | Abiquiu, NM | 47.8 GWh |
#518 | Cougar | Lowell, OR | 47.6 GWh |
#519 | De Sabla | Magalia, CA | 47.2 GWh |
#520 | Green Mountain | Kremmling, CO | 47.1 GWh |
#522 | Soft Maple | Croghan, NY | 46.8 GWh |
#523 | Dutch Flat 2 | Dutch Flat, CA | 46.7 GWh |
#524 | Leesville | Hurt, VA | 46.7 GWh |
#525 | Narrows (AR) | Murfreesboro, AR | 46.7 GWh |
#526 | Cooper Lake | Cooper Landing, AK | 46.4 GWh |
#527 | Bonny Eagle | Hollis, ME | 45.3 GWh |
#528 | Stone Creek | Estacada, OR | 46.0 GWh |
#529 | New Badger | Kaukauna, WI | 46.0 GWh |
#530 | McSwain | Snelling, CA | 45.9 GWh |
#531 | J P Priest | Nashville, TN | 45.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Parr Hydro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allora Solar, LLC | Gilbert, SC | 165.3 GWh | 25.3 mi |
Beulah Solar | Batesburg, SC | 135.5 GWh | 25.8 mi |
Cedar Creek | Great Falls, SC | 138.7 GWh | 32.4 mi |
Champion Solar | Pelion, SC | 21.2 GWh | 32.5 mi |
Coit GT | Columbia, SC | 400.0 MWh | 25.5 mi |
Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh | 32.5 mi |
Dearborn | Great Falls, SC | 86.9 GWh | 32.4 mi |
Fairfield Pumped Storage | Jenkinsville, SC | 445.8 GWh | 3.1 mi |
Hecate Energy West Newberry, LLC | Newberry, SC | 6.4 GWh | 18.2 mi |
McMeekin | Columbia, SC | 882.6 GWh | 15.6 mi |
Midway Green Solar | Union, SC | 21.1 GWh | 11.6 mi |
Neal Shoals | Union, SC | 5.8 GWh | 28.6 mi |
Otarre Solar Park | Cayce, SC | 2.8 GWh | 27.8 mi |
Parr GT | Jenkinsville, SC | 3.1 GWh | 0.2 mi |
Richland County Landfill | Lugoff, SC | 12.1 GWh | 32.8 mi |
Saluda Lexington | Columbia, SC | 109.5 GWh | 15.8 mi |
Saluda Solar II | Saluda, SC | 6.3 GWh | 29.1 mi |
Swamp Fox Solar | Pelion, SC | 22.9 GWh | 32.7 mi |
V C Summer | Jenkinsville, SC | 8.7 TWh | 2.7 mi |
Webb Forging | Carlisle, SC | 83.0 MWh | 22.4 mi |