Park Meridian #1
15001 Meridian Parkway, Riverside, CA 92518Plant Summary Information
Park Meridian #1 is ranked #585 out of 799 solar farms in California in terms of total annual net electricity generation.
Park Meridian #1 generated 568.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Park Meridian #1 |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Riverside County, CA |
Initial Operation Date | March 2015 |
Last Update | Dec 2023 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.6 k MMBtu |
Ranked #9,454 out of 11,835 Power Plants Nationwide | |
Ranked #4,233 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,312 out of 1,569 California Power Plants | |
Ranked #585 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Kona Solar, LLC (2014 to 2021) Altus Power America Management, LLC (2022 to 2023) |
Map of Park Meridian #1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Park Meridian #1.
Monthly Net Generation for Park Meridian #1
Park Meridian #1 Details
Summary Information | |
---|---|
Plant Name | Park Meridian #1 (59539) |
Plant Address | 15001 Meridian Parkway, Riverside, CA 92518 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 33.89611, -117.28361 |
Generation Dates on File | Mar 2015 to Dec 2023 |
Initial Operation Date | March 2015 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-695-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 1 Details Operating March 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 11 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Park Meridian #1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4223 | Chesapeake College | Wye Mills, MD | 2.4 GWh |
#4224 | Macedon | Macedon, NY | 2.4 GWh |
#4225 | BWC Swan Pond River CSG | Rehoboth, MA | 2.4 GWh |
#4226 | Timmerman (CSG) | Balaton, MN | 2.4 GWh |
#4227 | JM Huber at Quincy | Quincy, IL | 2.4 GWh |
#4228 | L'Oreal Monmouth | Monmouth Junction, NJ | 2.4 GWh |
#4229 | Coventry Photovoltaic, LLC | Coventry, VT | 2.4 GWh |
#4230 | Page Solar | Willow Spring, NC | 2.4 GWh |
#4231 | Barton Solar Farm | Barton, VT | 2.4 GWh |
#4232 | Canandaigua Solar Array | Canandaigua, NY | 2.4 GWh |
#4234 | Town of Lexington Solar | Lexington, MA | 2.4 GWh |
#4235 | Pima Community College | Tucson, AZ | 2.4 GWh |
#4236 | Frey Rd #1 Community Solar Farm | Macedon, NY | 2.4 GWh |
#4237 | Frey Rd #2 Community Solar Farm | Macedon, NY | 2.4 GWh |
#4238 | Faison Solar | Faison, NC | 2.4 GWh |
#4239 | Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.4 GWh |
#4240 | Arrache 4006 | Palmdale, CA | 2.4 GWh |
#4241 | Sand Lake DPC Solar | Centuria, WI | 2.4 GWh |
#4242 | Waxdale | Sturtevant, WI | 45.3 GWh |
#4243 | MN CSG 2019-38 DE LLC | Cleveland, MN | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Park Meridian #1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Mansa Power Plant | Colton, CA | 10.2 GWh | 11 mi |
Broadway 2 - UC Riverside | Riverside, CA | 3.7 GWh | 5.8 mi |
Century Generating Facility | Colton, CA | 651.0 MWh | 12 mi |
Colton Solar Two, LLC | Colton, CA | 1.1 GWh | 11 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 12.1 mi |
EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.3 GWh | 4.4 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.0 GWh | 10.9 mi |
ESCA-LL-COLTON, LLC | Colton, CA | 4.6 GWh | 10.8 mi |
IGS SBD1 | Bloomington, CA | 5.0 GWh | 11.4 mi |
Lake Mathews | Riverside, CA | 5.1 GWh | 10.2 mi |
Loma Linda University Cogen | Loma Linda, CA | 52.3 GWh | 10.8 mi |
Perris | Perris, CA | 5.2 GWh | 7.1 mi |
Redlands Community Hospital | Redlands, CA | 9.1 GWh | 10.7 mi |
Riverside Energy Resource Center | Riverside, CA | 52.6 GWh | 10.8 mi |
Riverside RWQCP Fuel Cell | Riverside, CA | 9.4 GWh | 10.9 mi |
Springs Generating Station | Riverside, CA | 11.1 GWh | 2.5 mi |
SSI West Riverside Landfill LLC | Riverside, CA | 4.8 GWh | 7.9 mi |
SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 1.3 GWh | 3.7 mi |
Tequesquite Landfill Solar PV Project | Riverside, CA | 13.2 GWh | 8.1 mi |
UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh | 5.8 mi |