Paris (WI)
335 North 172nd Avenue, Union Grove, WI 53182Plant Summary Information
Paris (WI) is ranked #33 out of 216 power plants in Wisconsin in terms of total annual net electricity generation.
Paris (WI) is comprised of 4 generators and generated 22.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Paris (WI) |
---|---|
Utility Name | Wisconsin Electric Power Co |
Location | Kenosha County, WI |
Initial Operation Date | March 1995 |
Last Update | Dec 2023 |
Annual Generation | 160.2 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #2,594 out of 11,852 Power Plants Nationwide | |
Ranked #797 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #33 out of 216 Wisconsin Power Plants | |
Ranked #14 out of 50 Wisconsin Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Paris (WI)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Paris (WI).
Monthly Net Generation for Paris (WI)
Paris (WI) Details
Summary Information | |
---|---|
Plant Name | Paris (WI) (7270) |
Plant Address | 335 North 172nd Avenue, Union Grove, WI 53182 |
Utility | Wisconsin Electric Power Co (20847) |
Latitude, Longitude | 42.6658, -88.0131 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | March 1995 |
Annual Generation | 160.2 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating March 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S1 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 90.1 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1995 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 5 MW |
Planned Uprate | May 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 90.1 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 90.1 MW |
Net Winter Capacity With Oil | 100 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2 Details Operating March 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S2 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 89.9 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1995 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 5 MW |
Planned Uprate | May 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 90.8 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 90.8 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating June 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S3 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 93.5 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1995 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 5 MW |
Planned Uprate | May 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 94.5 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 94.5 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4 Details Operating June 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S4 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 90.4 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1995 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 5 MW |
Planned Uprate | May 2024 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 91.3 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 91.3 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Paris (WI) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#787 | Celanese Acetate LLC | Narrows, VA | 167.8 GWh |
#788 | AES Alamitos LLC | Long Beach, CA | 167.2 GWh |
#789 | Riverbay | New York, NY | 169.0 GWh |
#790 | Ashtabula | Ashtabula, OH | 164.1 GWh |
#791 | NIH Cogeneration Facility | Bethesda, MD | 164.0 GWh |
#792 | Marsh Landing Generating Station | Antioch, CA | 163.3 GWh |
#793 | Solway CT | Solway, MN | 163.4 GWh |
#794 | Wallingford Energy | Wallingford, CT | 161.3 GWh |
#795 | PE Berkeley | Berkeley, CA | 161.2 GWh |
#796 | Otsego Mill Power Plant | Otsego, MI | 161.2 GWh |
#798 | James H Miller Jr | Quinton, AL | 17.1 TWh |
#799 | Toray Plastic America's CHP Plant | North Kingstown, RI | 157.3 GWh |
#800 | Lieberman | Mooringsport, LA | 155.8 GWh |
#801 | Smarr Energy Center | Forsyth, GA | 155.7 GWh |
#802 | Sarpy County | Bellevue, NE | 161.8 GWh |
#803 | Westrock Hodge (LA) | Hodge, LA | 412.2 GWh |
#804 | El Segundo Energy Center LLC | El Segundo, CA | 154.3 GWh |
#805 | Glenwood Landing | Glenwood Landing, NY | 154.4 GWh |
#806 | Kenilworth Energy Facility | Kenilworth, NJ | 152.8 GWh |
#807 | SJRR Power LLC | Houston, TX | 152.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Paris (WI).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alden Road Harvard Solar 1 | Harvard, IL | 3.8 GWh | 30.8 mi |
ATI | Cudahy, WI | 3.6 GWh | 20.8 mi |
Charter Dura-Bar | Woodstock, IL | 8.6 GWh | 33.1 mi |
Charter Durabar at Woodstock | Woodstock, IL | 2.8 GWh | 32.8 mi |
City of Milwaukee Landfill | Milwaukee, WI | 3.7 GWh | 19.6 mi |
CREE | Racine, WI | 2.2 GWh | 6.8 mi |
Elm Road Generating Station | Oak Creek, WI | 7.0 TWh | 15.6 mi |
IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.4 GWh | 16.9 mi |
Lake Forest Hospital Central Energy Plant | Lake Forest, IL | 290.0 MWh | 29.4 mi |
Lannon Stone | Pewaukee, WI | 3.4 GWh | 32.4 mi |
Metro Gas Recovery | Franklin, WI | 43.9 GWh | 13.1 mi |
MMSD Jones Island Wastewater | Milwaukee, WI | 61.0 GWh | 25.2 mi |
MMSD South Shore Wastewater | Oak Creek, WI | 30.2 GWh | 17.6 mi |
North Chicago Energy Center | North Chicago, IL | 36.0 GWh | 26.2 mi |
Pheasant Run Landfill Gas Recovery | Bristol, WI | 40.5 GWh | 6 mi |
South Oak Creek | Oak Creek, WI | 2.6 TWh | 15.5 mi |
UW Parkside | Kenosha, WI | 3.8 GWh | 8.1 mi |
Valley (WI) | Milwaukee, WI | 427.8 GWh | 25.6 mi |
Waxdale | Sturtevant, WI | 45.6 GWh | 7.2 mi |
Zion Energy Center | Zion, IL | 310.5 GWh | 14.3 mi |