Paradise
5562 Rockport Paradise Road, Drakesboro, KY 42337Plant Summary Information
Paradise is ranked #31 out of 2,254 natural gas power plants nationwide in terms of total annual net electricity generation.
Paradise is comprised of 7 generators and generated 2.9 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Paradise |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Muhlenberg County, KY |
Initial Operation Date | May 1963 |
Last Update | Sep 2024 |
Annual Generation | 7.8 TWh |
Annual Consumption | 61.0 M MMBtu |
Ranked #102 out of 11,852 Power Plants Nationwide | |
Ranked #31 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #4 out of 54 Kentucky Power Plants | |
Ranked #1 out of 16 Kentucky Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Paradise
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Paradise.
Monthly Net Generation for Paradise
Paradise Details
Summary Information | |
---|---|
Plant Name | Paradise (1378) |
Plant Address | 5562 Rockport Paradise Road, Drakesboro, KY 42337 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 37.2608, -86.9783 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 1963 |
Annual Generation | 7.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Green River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) KY |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | TEXAS GAS SERVICE |
Pipeline Name | TEXAS GAS TRANSMISSION LLC |
Generator CTG1 Details Operating April 2017
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 231 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 211 MW |
Winter Capacity | 231 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating April 2017
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 231 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 211 MW |
Winter Capacity | 231 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating April 2017
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 231 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 211 MW |
Winter Capacity | 231 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating April 2017
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 467 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 467 MW |
Winter Capacity | 467 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT5 Details Operating December 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator CT6 Details Operating December 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator CT7 Details Operating December 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Paradise Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#21 | Sanford | DeBary, FL | 8.6 TWh |
#22 | South Field Energy | Wellsville, OH | 8.6 TWh |
#23 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#24 | Seminole (FL) | Palatka, FL | 11.1 TWh |
#25 | Wansley Combined Cycle | Franklin, GA | 8.3 TWh |
#26 | Hummel Station LLC | Shamokin Dam, PA | 8.3 TWh |
#27 | Moxie Freedom Generation Plant | Salem Township, PA | 7.9 TWh |
#28 | Brunswick County Power Station | Freeman, VA | 7.9 TWh |
#29 | Port Washington Generating Station | Port Washington, WI | 7.9 TWh |
#30 | McIntosh Combined Cycle Facility | Rincon, GA | 7.8 TWh |
#32 | Indeck Niles Energy Center | Niles, MI | 7.8 TWh |
#33 | Fairless Energy Center | Fairless Hills, PA | 7.8 TWh |
#34 | Deer Park Energy Center | Deer Park, TX | 7.6 TWh |
#35 | Riviera | Riviera Beach, FL | 7.6 TWh |
#36 | Martin | Indiantown, FL | 7.4 TWh |
#37 | New Covert Generating Facility | Covert, MI | 7.4 TWh |
#38 | Big Bend | Apollo Beach, FL | 7.7 TWh |
#39 | Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh |
#40 | Blue Water Energy Center | East China, MI | 7.3 TWh |
#41 | Wolf Hollow II | Granbury, TX | 7.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Paradise.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A B Brown | Mount Vernon, IN | 102.6 GWh | 60.1 mi |
Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh | 58.8 mi |
Cannelton Hydroelectric Plant | Hawesville, KY | 460.6 GWh | 46.6 mi |
Cheatham | Ashland City, TN | 177.3 GWh | 66.3 mi |
D B Wilson | Centertown, KY | 2.7 TWh | 14.2 mi |
F B Culley | Newburgh, IN | 1.9 TWh | 48.8 mi |
Glasgow LFGTE | Glasgow, KY | 4.3 GWh | 59.3 mi |
IMPA Tell City Solar Park | Tell City, IN | 5.1 GWh | 49.2 mi |
Kentucky Mills | Hawesville, KY | 327.9 GWh | 46.6 mi |
New Haven Solar RES | Dale, IN | 1.6 GWh | 64.5 mi |
Oak Hill Solar Array | Evansville, IN | 3.4 GWh | 58.7 mi |
R D Green | Robards, KY | 601.9 GWh | 39.1 mi |
Robert A Reid | Robards, KY | 6.1 GWh | 39.2 mi |
Rockport | Rockport, IN | 4.6 TWh | 46 mi |
SR Clarksville II, LLC | Clarksville, TN | 62.0 MWh | 54.4 mi |
SR Clarksville, LLC | Clarksville, TN | 93.0 MWh | 54.3 mi |
SR Franklin, LLC | Franklin, KY | 129.0 MWh | 44.7 mi |
Tell City Solar Park | Tell City, IN | 1.6 GWh | 50.5 mi |
Troy Solar | Troy, IN | 88.9 GWh | 53.1 mi |
Warrick | Newburgh, IN | 3.6 TWh | 49.2 mi |