Papalote Creek II LLC
546 FM 631, Taft, TX 78390Plant Summary Information
Papalote Creek II LLC is ranked #123 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Papalote Creek II LLC generated 115.0 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Papalote Creek II LLC |
---|---|
Utility Name | RWE Renewables Americas, LLC |
Location | San Patricio County, TX |
Initial Operation Date | December 2010 |
Last Update | Jan 2025 |
Annual Generation | 443.4 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,412 out of 11,979 Power Plants Nationwide | |
Ranked #397 out of 1,359 Wind Power Plants Nationwide | |
Ranked #269 out of 774 Texas Power Plants | |
Ranked #123 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) |
Map of Papalote Creek II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Papalote Creek II LLC.
Monthly Net Generation for Papalote Creek II LLC
Papalote Creek II LLC Details
Summary Information | |
---|---|
Plant Name | Papalote Creek II LLC (57212) |
Plant Address | 546 FM 631, Taft, TX 78390 |
Utility | RWE Renewables Americas, LLC (56215) |
Latitude, Longitude | 27.9958, -97.2967 |
Generation Dates on File | Aug 2010 to Jan 2025 |
Initial Operation Date | December 2010 |
Annual Generation | 443.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 10-22 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | COTTON_PAP2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | COTTON_PAP2 |
Nameplate Capacity | 200.1 MW |
Summer Capacity | 200.1 MW |
Winter Capacity | 200.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 87 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 87 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-101 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Papalote Creek II LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#387 | La Chalupa, LLC | Rio Hondo, TX | 455.8 GWh |
#388 | Cactus Flats Wind Energy Project | Eden, TX | 455.8 GWh |
#389 | Langdon Renewables, LLC | Langdon, ND | 455.6 GWh |
#390 | Blackstone Wind Farm II LLC | Dwight, IL | 455.2 GWh |
#391 | Los Vientos Windpower IV | Rio Grande City, TX | 453.9 GWh |
#392 | Glen Ullin Energy Center | Glen Ullin, ND | 453.2 GWh |
#393 | Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh |
#394 | Sunflower Wind Project | Mandan, ND | 449.2 GWh |
#395 | Heartland Divide Wind Project, LLC | Melville, IA | 447.2 GWh |
#396 | White Creek Wind Farm | Roosevelt, WA | 446.8 GWh |
#398 | Day County Wind LLC | Conde, SD | 443.1 GWh |
#399 | Wellsburg Wind Project | Wellsburg, IA | 441.8 GWh |
#400 | Polaris Wind Park | North Star Township, MI | 440.3 GWh |
#401 | Adams Wind | Lenox, IA | 440.1 GWh |
#402 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 438.7 GWh |
#403 | Smoky Hills Wind Project Phase II | Lincoln, KS | 437.7 GWh |
#404 | Glass Sands Wind Facility | Sulphur, OK | 437.1 GWh |
#405 | Oliver Wind III, LLC | Mandan, ND | 435.6 GWh |
#406 | Pioneer Trail Wind Farm, LLC | Paxton, IL | 433.8 GWh |
#407 | Dunlap | Medicine Bow, WY | 432.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Papalote Creek II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barney M Davis | Corpus Christi, TX | 1.6 TWh | 26.9 mi |
Blackjack Creek Wind Farm | Skidmore, TX | 522.8 GWh | 20.1 mi |
Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh | 30.5 mi |
Corpus Christi | Corpus Christi, TX | 72.9 GWh | 22.3 mi |
Corpus Christi Energy Center | Corpus Christi, TX | 2.6 TWh | 14.9 mi |
Corpus Refinery | Corpus Christi, TX | 272.8 GWh | 18.1 mi |
Cranell Wind Farm LLC | TBD, TX | 585.4 GWh | 16.6 mi |
El Algodon Alto Wind Farm, LLC | Mathis, TX | 627.7 GWh | 27.3 mi |
Gregory Power Plant | Gregory, TX | 835.6 GWh | 7.7 mi |
HEB00057 | Corpus Christi, TX | 315.0 MWh | 22.9 mi |
HEB00069 | Corpus Christi, TX | 407.0 MWh | 20.9 mi |
HEBCCBakery | Corpus Christi, TX | 1.0 GWh | 17.7 mi |
Ingleside Cogeneration | Houston, TX | 2.6 TWh | 8.5 mi |
Karankawa Wind LLC | Mathis, TX | 810.6 GWh | 34 mi |
Midway Wind, LLC | Taft, TX | 395.9 GWh | 2.8 mi |
Nueces Bay | Corpus Christi, TX | 1.7 TWh | 14.3 mi |
Papalote Creek I LLC | Taft, TX | 421.0 GWh | 10.6 mi |
Patriot Wind Farm | Bishop, TX | 606.4 GWh | 35.6 mi |
Peacock Energy Project | TX | 24.7 GWh | 5.6 mi |
Valero Refinery Corpus Christi West | Corpus Christi, TX | 92.7 GWh | 16.7 mi |