Panda Temple Power Station
2892 Panda Drive, Temple, TX 76501Plant Summary Information
Panda Temple Power Station is ranked #44 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Panda Temple Power Station is comprised of 6 generators and generated 2.3 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Panda Temple Power Station |
---|---|
Utility Name | PPG - O&M Panda Temple Power LLC |
Location | Bell County, TX |
Initial Operation Date | July 2014 |
Last Update | Aug 2024 |
Annual Generation | 7.1 TWh |
Annual Consumption | 57.3 M MMBtu |
Ranked #126 out of 11,835 Power Plants Nationwide | |
Ranked #44 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #12 out of 749 Texas Power Plants | |
Ranked #7 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Panda Temple Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Panda Temple Power Station.
Monthly Net Generation for Panda Temple Power Station
Panda Temple Power Station Details
Summary Information | |
---|---|
Plant Name | Panda Temple Power Station (58001) |
Plant Address | 2892 Panda Drive, Temple, TX 76501 |
Utility | PPG - O&M Panda Temple Power LLC (57377) |
Latitude, Longitude | 31.05583, -97.31722 |
Generation Dates on File | Jul 2014 to Aug 2024 |
Initial Operation Date | July 2014 |
Annual Generation | 7.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City of Temple |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Generator CTG-1 Details Operating July 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | TMP1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 232 MW |
Winter Capacity | 232 MW |
Minimum Load | 140 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-2 Details Operating July 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | TMP1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 232 MW |
Winter Capacity | 232 MW |
Minimum Load | 140 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG-1 Details Operating July 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | TMP1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 339.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 326 MW |
Winter Capacity | 326 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-3 Details Operating May 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | TMP2 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 232 MW |
Winter Capacity | 232 MW |
Minimum Load | 140 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | June 2023 |
Status | Operating |
---|---|
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-4 Details Operating May 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | TMP2 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 232 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 232 MW |
Winter Capacity | 232 MW |
Minimum Load | 140 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | June 2023 |
Status | Operating |
---|---|
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG-2 Details Operating May 2015
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | TMP2 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
Nameplate Capacity | 339.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 326 MW |
Winter Capacity | 326 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Panda Temple Power Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Temple Generation I, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator CTG-1 | 100.00% |
Temple Generation I, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator CTG-2 | 100.00% |
Temple Generation II, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator CTG-3 | 100.00% |
Temple Generation II, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator CTG-4 | 100.00% |
Temple Generation I, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator STG-1 | 100.00% |
CXA Temple 2, LLC | 2892 Panda Drive, Temple, TX 76501 | Generator STG-2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#34 | Riviera | Riviera Beach, FL | 7.6 TWh |
#35 | Paradise | Drakesboro, KY | 7.5 TWh |
#36 | Blue Water Energy Center | East China, MI | 7.4 TWh |
#37 | New Covert Generating Facility | Covert, MI | 7.4 TWh |
#38 | Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh |
#39 | Big Bend | Apollo Beach, FL | 7.7 TWh |
#40 | Wolf Hollow II | Granbury, TX | 7.2 TWh |
#41 | Colorado Bend II | Wharton, TX | 7.2 TWh |
#42 | Martin | Indiantown, FL | 7.2 TWh |
#43 | Freestone Energy Center | Fairfield, TX | 7.2 TWh |
#45 | Guadalupe Generating Station | Marion, TX | 7.1 TWh |
#46 | Jackson Generation, LLC | Elwood, IL | 7.1 TWh |
#47 | Turkey Point | Homestead, FL | 21.3 TWh |
#48 | Victor J Daniel Jr | Escatawpa, MS | 8.6 TWh |
#49 | Manatee | Parrish, FL | 7.0 TWh |
#50 | CPV Fairview Energy Center | Johnstown, PA | 7.0 TWh |
#51 | Chuck Lenzie Generating Station | Apex, NV | 6.9 TWh |
#52 | Chouteau | Pryor, OK | 6.9 TWh |
#53 | Jack County | Bridgeport, TX | 6.8 TWh |
#54 | Tenaska Westmoreland Generating Station | Smithton, PA | 6.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Panda Temple Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BPL Crown Solar LLC | Chilton, TX | 134.9 GWh | 24.4 mi |
BPL Sol Solar LLC | Chilton, TX | 132.5 GWh | 24.4 mi |
Eddy II | Eddy, TX | 16.2 GWh | 16.6 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 537.3 GWh | 5.2 mi |
Griffin Solar | Robinson, TX | 11.3 GWh | 30.7 mi |
HEB00182 | Temple, TX | 298.0 MWh | 3.4 mi |
HEB00591 | Round Rock, TX | 425.0 MWh | 42.3 mi |
IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh | 41 mi |
Major Oak Power | Bremond, TX | 2.0 TWh | 36.9 mi |
Marlin Solar | Marlin, TX | 10.3 GWh | 30.5 mi |
Orion I Solar Project | Burlington, TX | 54.6 GWh | 19.1 mi |
Orion III Solar Project | Buckholts, TX | 65.9 GWh | 13.2 mi |
Phantom Solar | Fort Hood, TX | 26.5 GWh | 31.5 mi |
Prairie Hill Wind Project | Mart, TX | 227.9 GWh | 42 mi |
Roseland Solar Project, LLC | Riesel, TX | 875.9 GWh | 40.4 mi |
Sandy Creek Energy Station | Riesel, TX | 2.9 TWh | 35.9 mi |
WAL1232 | Belton, TX | 328.0 MWh | 8.5 mi |
WAL407 | Killeen, TX | 369.0 MWh | 24.5 mi |
WAL5480 | Round Rock, TX | 334.0 MWh | 40.1 mi |
WAL6929 | Temple, TX | 296.0 MWh | 7.1 mi |