Panda Solar NC 3, LLC
1927 NC HWY 711, Lumberton, NC 28360Plant Summary Information
Panda Solar NC 3, LLC is ranked #606 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Panda Solar NC 3, LLC generated 786.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Panda Solar NC 3, LLC |
---|---|
Utility Name | Panda Solar NC 3, LLC |
Location | Robeson County, NC |
Initial Operation Date | June 2019 |
Last Update | Dec 2023 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.4 k MMBtu |
Ranked #8,112 out of 11,852 Power Plants Nationwide | |
Ranked #3,111 out of 5,655 Solar Power Plants Nationwide | |
Ranked #692 out of 863 North Carolina Power Plants | |
Ranked #606 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Panda Solar NC 3, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Panda Solar NC 3, LLC.
Monthly Net Generation for Panda Solar NC 3, LLC
Panda Solar NC 3, LLC Details
Summary Information | |
---|---|
Plant Name | Panda Solar NC 3, LLC (62121) |
Plant Address | 1927 NC HWY 711, Lumberton, NC 28360 |
Utility | Panda Solar NC 3, LLC (61656) |
Latitude, Longitude | 34.63181, -79.09067 |
Generation Dates on File | Jun 2019 to Dec 2023 |
Initial Operation Date | June 2019 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-35-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lumbee River Elec Member Corp (11291) NC |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 20011 Details Operating June 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2019 |
---|---|
Planned Retirement | June 2049 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 2.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Panda Solar NC 3, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3101 | Merced Solar LLC | Merced, CA | 4.1 GWh |
#3102 | Expressway Solar B | Victorville, CA | 4.1 GWh |
#3103 | MD - CS - BGE - PR24 TPE | Mitchellville, MD | 4.1 GWh |
#3104 | DG Foxborough Elm CSG | Foxborough, MA | 4.1 GWh |
#3105 | Kish CSG | Cherry Valley, IL | 4.1 GWh |
#3106 | Monson Solar | Monson, MA | 4.1 GWh |
#3107 | Grand Valley Solar Gardens | Allendale, MI | 4.1 GWh |
#3108 | Lafayette 2 - Kankakee Yonke | Kankakee, IL | 4.0 GWh |
#3109 | Anderson (SC) | Anderson, SC | 4.0 GWh |
#3110 | Edwardsville Solar II | Edwardsville, IL | 4.0 GWh |
#3112 | Red Toad 4451 Buffalo Road, LLC | Selma, NC | 4.0 GWh |
#3113 | Briscoe 1A | Tonica, IL | 4.0 GWh |
#3114 | Clinton Solar 4 LLC CSG | Carlyle, IL | 4.0 GWh |
#3115 | Gaines Solar | Bishopville, SC | 4.0 GWh |
#3116 | Weaver Solar | Lynchburg, SC | 4.0 GWh |
#3117 | Geneseo Solar | Geneseo, NY | 4.0 GWh |
#3118 | Thunderhead | Asheboro, NC | 4.0 GWh |
#3119 | Ohio Northern University Solar Site | Ada, OH | 4.0 GWh |
#3120 | Morning View | Seagrove, NC | 4.0 GWh |
#3121 | Monroeville Solar | Monroeville, OH | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Panda Solar NC 3, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barker Solar, LLC | Lumberton, NC | 9.0 GWh | 9.2 mi |
Bo Biggs Solar | Lumberton, NC | 8.8 GWh | 8.8 mi |
Broadridge Solar, LLC | Lumberton, NC | 9.9 GWh | 10.7 mi |
Deep Branch Farm | Pembroke, NC | 9.5 GWh | 6.7 mi |
Fairmont-FLS 100 | Fairmont, NC | 6.4 GWh | 8 mi |
Floyd Solar, LLC | Fairmont, NC | 9.5 GWh | 8.9 mi |
FLS Solar 170, LLC | Lumberton, NC | 3.4 GWh | 7.2 mi |
FLS Solar 200, LLC | Lumberton, NC | 6.4 GWh | 9.2 mi |
Holly Swamp Solar, LLC | Lumberton, NC | 4.3 GWh | 3.2 mi |
Innovative Solar 55 | Pembroke, NC | 8.9 GWh | 8.4 mi |
Jersey Holdings | Lumberton, NC | 9.6 GWh | 5.6 mi |
Progress Solar II, LLC | Fairmont, NC | 5.4 GWh | 10.8 mi |
Railroad Solar Farm, LLC | Pembroke, NC | 6.4 GWh | 6.3 mi |
St. Pauls Solar 1, LLC | St. Pauls, NC | 5.9 GWh | 11.4 mi |
St. Pauls Solar 2 | St. Pauls, NC | 7.7 GWh | 11.3 mi |
Stone Solar | Lumberton, NC | 9.8 GWh | 4.7 mi |
Three Bridge | Pembroke, NC | 3.3 GWh | 6.8 mi |
Turkey Branch Solar LLC | Fairmont, NC | 8.1 GWh | 7.5 mi |
W H Weatherspoon | Lumberton, NC | 104.0 MWh | 7.2 mi |
Walters Solar (FLS 260) | Orrum, NC | 9.2 GWh | 9.6 mi |