Paloma Solar Hybrid
46700 S Old US 80, Gila Bend, AZ 85337Plant Summary Information
Paloma Solar Hybrid is ranked #44 out of 99 solar farms in Arizona in terms of total annual net electricity generation.
Paloma Solar Hybrid generated 9.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Paloma Solar Hybrid |
---|---|
Utility Name | Arizona Public Service Co |
Location | Maricopa County, AZ |
Initial Operation Date | September 2011 |
Last Update | Dec 2022 |
Annual Generation | 35.5 GWh |
Annual Consumption | 131.0 k MMBtu |
Ranked #4,235 out of 11,249 Power Plants Nationwide | |
Ranked #839 out of 5,158 Solar Power Plants Nationwide | |
Ranked #89 out of 150 Arizona Power Plants | |
Ranked #44 out of 99 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Paloma Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Paloma Solar Hybrid.
Monthly Net Generation for Paloma Solar Hybrid
Paloma Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | Paloma Solar Hybrid (57562) |
Plant Address | 46700 S Old US 80 Gila Bend, AZ 85337 |
Utility | Arizona Public Service Co (803) |
Latitude, Longitude | 33.02111, -112.66139 |
Generation Dates on File | Sep 2011 to Dec 2022 |
Initial Operation Date | September 2011 |
Annual Generation | 35.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 12.50 kV |
Energy Storage | Yes |
Generator PV1 Details Operating September 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 17.6 MW |
Summer Capacity | 17.6 MW |
Winter Capacity | 17.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 190 |
Tilt Angle | 25 |
DC Net Capacity | 22.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Paloma Solar Hybrid Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#829 | Cotton Center Solar Hybrid | Gila Bend, AZ | 36.7 GWh |
#830 | Buckingham Solar LLC | Cumberland, VA | 36.6 GWh |
#831 | Richmond Spider Solar | Spotsylvania, VA | 36.5 GWh |
#832 | Whitetail Solar 3 | Chambersburg, PA | 36.4 GWh |
#833 | Hyder II Hybrid | Hyder, AZ | 36.2 GWh |
#834 | CED Ducor 3 | Ducor, CA | 36.0 GWh |
#835 | Riverhead Solar Farm | Calverton, NY | 36.0 GWh |
#836 | Prairie Creek FL | TBD, FL | 35.9 GWh |
#837 | Blackville Solar II | Blackville, SC | 35.9 GWh |
#838 | Morelos del Sol | Lost Hills, CA | 35.7 GWh |
#840 | Saddle Mountain Solar I | Tonopah, AZ | 35.3 GWh |
#841 | Ocotillo Wells | Borrego Springs, CA | 35.2 GWh |
#842 | Watson Seed Farm PV1 | Whitakers, NC | 35.1 GWh |
#843 | Maryland Solar | Hagerstown, MD | 35.1 GWh |
#844 | Hobnail Solar | Hephzibah, GA | 34.7 GWh |
#845 | Woodmere Solar Farm | Edison, CA | 34.4 GWh |
#846 | Dogwood Solar, LLC | Scotland Neck, NC | 34.2 GWh |
#847 | NVSS-II | Pahrump, NV | 34.2 GWh |
#848 | Luke Solar | Glendale, AZ | 34.2 GWh |
#849 | Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 34.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Paloma Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Valley Energy Facility | Arlington, AZ | 4.1 TWh | 25.8 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 370.4 GWh | 22 mi |
Cotton Center Solar Hybrid | Gila Bend, AZ | 36.7 GWh | 0.9 mi |
Desert Star Hybrid | Buckeye, AZ | 32.4 GWh | 8.6 mi |
Gila Bend Hybrid | Gila Bend, AZ | 102.1 GWh | 13.9 mi |
Gila River Power Block 1 | Gila Bend, AZ | 3.2 TWh | 3.7 mi |
Gila River Power Block 2 | Gila Bend, AZ | 3.1 TWh | 3.7 mi |
Gila River Power Block 3 | Gila Bend, AZ | 2.9 TWh | 3.7 mi |
Gila River Power Block 4 | Gila Bend, AZ | 2.2 TWh | 3.7 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 25.3 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.7 TWh | 25.3 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 283.5 GWh | 25.9 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 27.0 GWh | 25.8 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 70.7 GWh | 25.7 mi |
RE Gillespie 1 LLC | Gila Bend, AZ | 38.5 GWh | 0.4 mi |
Red Hawk | Arlington, AZ | 4.0 TWh | 24 mi |
Solana Generating Station | Gila Bend, AZ | 855.2 GWh | 18.4 mi |
Sonoran Solar Energy | Buckeye, AZ | 309.8 GWh | 17.2 mi |
Sun Streams 2 | Hassayampa, AZ | 362.8 GWh | 22.5 mi |
Sun Streams, LLC | Arlington, AZ | 418.4 GWh | 24.8 mi |