Palmer Solar
14230 Solar Power Circle, Fountain, CO 80817Plant Summary Information
Palmer Solar is ranked #9 out of 142 solar farms in Colorado in terms of total annual net electricity generation.
Palmer Solar generated 43.8 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Palmer Solar |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | El Paso County, CO |
Initial Operation Date | April 2020 |
Last Update | Sep 2024 |
Annual Generation | 144.1 GWh |
Annual Consumption | 540.3 k MMBtu |
Ranked #2,713 out of 11,852 Power Plants Nationwide | |
Ranked #408 out of 5,655 Solar Power Plants Nationwide | |
Ranked #57 out of 267 Colorado Power Plants | |
Ranked #9 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Palmer Solar LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Palmer Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Palmer Solar.
Monthly Net Generation for Palmer Solar
Palmer Solar Details
Summary Information | |
---|---|
Plant Name | Palmer Solar (62495) |
Plant Address | 14230 Solar Power Circle, Fountain, CO 80817 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 38.6299, -104.6526 |
Generation Dates on File | Apr 2020 to Sep 2024 |
Initial Operation Date | April 2020 |
Annual Generation | 144.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Colorado Springs City of (3989) CO |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 20181 Details Operating April 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 60 MW |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 81.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Palmer Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Palmer Solar, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#398 | Midlands | St. Matthews, SC | 146.5 GWh |
#399 | Hibiscus Solar Energy Center | Westlake, FL | 145.9 GWh |
#400 | Conetoe II Solar, LLC | Conetoe, NC | 145.7 GWh |
#401 | Desert Harvest II LLC | Desert Center, CA | 141.8 GWh |
#402 | Titan Solar 1 (CA) | Borrego Springs, CA | 145.7 GWh |
#403 | Union Springs Solar Center | Lake Butler, FL | 145.7 GWh |
#404 | Bay Tree | Harrells, NC | 145.6 GWh |
#405 | Columbia Solar Power Plant | Fort White, FL | 145.2 GWh |
#406 | Blue Heron Solar | Clewiston, FL | 145.0 GWh |
#407 | Regulus Solar Project | Bakersfield, CA | 144.5 GWh |
#409 | Santa Fe Solar Power Plant | Archer, FL | 143.9 GWh |
#410 | Rodeo Solar Center | Arcadia, FL | 143.9 GWh |
#411 | Prairie Creek FL | TBD, FL | 143.8 GWh |
#412 | Indian River Solar Center | Vero Beach, FL | 143.7 GWh |
#413 | Sunflower County | Ruleville, MS | 143.6 GWh |
#414 | Magnolia Springs Solar Center | Green Cove Springs, FL | 143.5 GWh |
#415 | Longbow Solar, LLC | Liverpool, TX | 143.4 GWh |
#416 | High Springs Solar Power Plant | High Springs, FL | 143.3 GWh |
#417 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 142.9 GWh |
#418 | Eastover Solar | Eastover, SC | 142.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Palmer Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AFA Solar Farm | Colorado Springs, CO | 11.0 GWh | 24.1 mi |
Bighorn Solar 1 | Pueblo, CO | 598.5 GWh | 29.3 mi |
Carson Solar I | Colorado Springs, CO | 3.0 GWh | 9.5 mi |
CEC Solar #1117, LLC | Pueblo, CO | 7.2 GWh | 24.9 mi |
Clear Spring Ranch PV Project | Fountain, CO | 20.2 GWh | 3 mi |
Comanche (CO) | Pueblo, CO | 5.7 TWh | 29.4 mi |
CSU Pueblo | Pueblo, CO | 1.1 GWh | 22.7 mi |
Fountain Valley Power Facility | Fountain, CO | 77.0 GWh | 5.4 mi |
Front Range Power Plant | Fountain, CO | 2.2 TWh | 2.9 mi |
George Birdsall | Colorado Springs, CO | 10.1 GWh | 19.5 mi |
James W. Broderick Hydropower Plant | Pueblo, CO | 20.8 GWh | 25.1 mi |
Manitou Springs | Manitou Spring, CO | 14.6 GWh | 21.7 mi |
Neptune Energy Center Hybrid | Boone, CO | 701.6 GWh | 24.4 mi |
Pike Solar Hybrid | Fountain, CO | 349.1 GWh | 3.9 mi |
Pikes Peak Solar Garden 1 LLC CSG | Colorado Springs, CO | 10.0 GWh | 11.2 mi |
Pueblo Airport Generating Station | Pueblo, CO | 1.6 TWh | 22.4 mi |
Ray D Nixon | Fountain, CO | 930.7 GWh | 2.9 mi |
Ruxton Park | Manitou Spring, CO | 1.8 GWh | 22.7 mi |
South Plant | Colorado Springs, CO | 115.6 GWh | 16.6 mi |
Tesla | Colorado Springs, CO | 56.4 GWh | 27.3 mi |