P L Bartow
1601 Weedon Island Drive, St. Petersburg, FL 33702Plant Summary Information
P L Bartow is ranked #16 out of 279 power plants in Florida in terms of total annual net electricity generation.
P L Bartow is comprised of 9 generators and generated 1.6 TWh during the 3-month period between July 2024 to October 2024.
Plant Name | P L Bartow |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Pinellas County, FL |
Initial Operation Date | May 1972 |
Last Update | Oct 2024 |
Annual Generation | 6.0 TWh |
Annual Consumption | 50.7 M MMBtu |
Ranked #161 out of 11,866 Power Plants Nationwide | |
Ranked #72 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #16 out of 279 Florida Power Plants | |
Ranked #15 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Duke Energy Florida, Inc (2013 to 2015) Duke Energy Florida, LLC (2016 to 2023) |
Map of P L Bartow
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for P L Bartow.
Monthly Net Generation for P L Bartow
P L Bartow Details
Summary Information | |
---|---|
Plant Name | P L Bartow (634) |
Plant Address | 1601 Weedon Island Drive, St. Petersburg, FL 33702 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 27.85954, -82.60176 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | May 1972 |
Annual Generation | 6.0 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Progress Energy Florida (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tampa Bay |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Florida, Inc (6455) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator P1 Details Operating May 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 50 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1972 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator P2 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 53 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 41 MW |
Net Winter Capacity With Natural Gas | 50 MW |
Net Summer Capacity With Oil | 41 MW |
Net Winter Capacity With Oil | 50 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator P3 Details Operating June 1972
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 51 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1972 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator P4 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45 MW |
Winter Capacity | 58 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45 MW |
Net Winter Capacity With Natural Gas | 58 MW |
Net Summer Capacity With Oil | 45 MW |
Net Winter Capacity With Oil | 58 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4AGT Details Operating June 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G981 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 208.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 181 MW |
Winter Capacity | 216 MW |
Minimum Load | 181 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 173 MW |
Net Winter Capacity With Natural Gas | 201 MW |
Net Summer Capacity With Oil | 173 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4BGT Details Operating June 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G981 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 208.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 214 MW |
Minimum Load | 165 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 175 MW |
Net Winter Capacity With Natural Gas | 203 MW |
Net Summer Capacity With Oil | 175 MW |
Net Winter Capacity With Oil | 203 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4CGT Details Operating June 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G981 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 208.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 181 MW |
Winter Capacity | 197 MW |
Minimum Load | 181 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 172 MW |
Net Winter Capacity With Natural Gas | 201 MW |
Net Summer Capacity With Oil | 172 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4DGT Details Operating June 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G981 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 208.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 183 MW |
Winter Capacity | 203 MW |
Minimum Load | 183 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 172 MW |
Net Winter Capacity With Natural Gas | 201 MW |
Net Summer Capacity With Oil | 172 MW |
Net Winter Capacity With Oil | 201 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4ST Details Operating June 2009
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G981 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 421.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 402 MW |
Winter Capacity | 429 MW |
Minimum Load | 402 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 389 MW |
Net Winter Capacity With Natural Gas | 396 MW |
Net Summer Capacity With Oil | 389 MW |
Net Winter Capacity With Oil | 396 MW |
Time To Switch From Gas To Oil | 24H |
Time To Switch From Oil To Gas | 24H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
P L Bartow Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#62 | Hamilton Patriot Generation Plant | Montgomery, PA | 6.4 TWh |
#63 | Oregon Clean Energy Center | Oregon, OH | 6.4 TWh |
#64 | Chuck Lenzie Generating Station | Apex, NV | 6.4 TWh |
#65 | Montgomery County | Willis, TX | 6.4 TWh |
#66 | Allen | Memphis, TN | 6.3 TWh |
#67 | Lake Side Power Plant | Vineyard, UT | 6.2 TWh |
#68 | Hamilton Liberty | Towanda, PA | 6.1 TWh |
#69 | Lake Charles Power | West Lake, LA | 6.1 TWh |
#70 | Midlothian Energy Facility | Midlothian, TX | 6.1 TWh |
#71 | Santan | Gilbert, AZ | 6.1 TWh |
#73 | Polk | Mulberry, FL | 5.9 TWh |
#74 | Victor J Daniel Jr | Escatawpa, MS | 7.4 TWh |
#75 | Sithe Independence Station | Oswego, NY | 5.8 TWh |
#76 | Cottonwood Energy Project | Deweyville, TX | 5.8 TWh |
#77 | Bethlehem Power Plant | Bethlehem, PA | 5.8 TWh |
#78 | St Joseph Energy Center | New Carlisle, IN | 5.8 TWh |
#79 | Acadia Energy Center | Eunice, LA | 5.8 TWh |
#80 | Linden Cogen Plant | Linden, NJ | 5.8 TWh |
#81 | W S Lee | Williamston, SC | 5.8 TWh |
#82 | Channelview Cogeneration Plant | Channelview, TX | 5.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding P L Bartow.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anclote | Holiday, FL | 1.5 TWh | 25.2 mi |
Balm Solar | Wimauma, FL | 127.0 GWh | 23.4 mi |
Bayboro | St. Petersburg, FL | 4.5 GWh | 7.3 mi |
Big Bend | Apollo Beach, FL | 7.3 TWh | 12.9 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 1.5 GWh | 13.4 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.7 GWh | 13.5 mi |
Big Bend II Solar | Apollo Beach, FL | 81.2 GWh | 14 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 5.0 TWh | 11.4 mi |
Hillsborough County Resource Recovery | Tampa, FL | 177.2 GWh | 17.3 mi |
IKEA Tampa 042 | Tampa, FL | 1.4 GWh | 12.2 mi |
John Hopkins Middle School Microgrid | St Petersburg, FL | 39.0 MWh | 7.1 mi |
Little Manatee River Solar | Ruskin, FL | 129.5 GWh | 16.5 mi |
Lockheed Martin Solar System | Oldsmar, FL | 2.9 GWh | 14 mi |
Manatee | Parrish, FL | 6.6 TWh | 23.5 mi |
McKay Bay Facility | Tampa, FL | 68.6 GWh | 12.7 mi |
Mosaic Co Tampa Facility | Riverview, FL | 117.8 GWh | 12.9 mi |
Pinellas County Resource Recovery | St. Petersburg, FL | 409.4 GWh | 4.5 mi |
Riverside Solar | Ruskin, FL | 104.3 GWh | 14.5 mi |
TIA Solar | Tampa, FL | 3.2 GWh | 8.5 mi |
Wimauma Solar | Wimauma, FL | 124.8 GWh | 22.5 mi |