Osage Dam
617 River Road, Eldon, MO 65026Plant Summary Information
Osage Dam is ranked #31 out of 120 power plants in Missouri in terms of total annual net electricity generation.
Osage Dam is comprised of 8 generators and generated 6.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Osage Dam |
---|---|
Utility Name | Union Electric Co - (MO) |
Location | Miller County, MO |
Initial Operation Date | October 1931 |
Last Update | Dec 2023 |
Annual Generation | 176.1 GWh |
Annual Consumption | 747.4 k MMBtu |
Ranked #2,476 out of 11,866 Power Plants Nationwide | |
Ranked #238 out of 1,369 Water Power Plants Nationwide | |
Ranked #31 out of 120 Missouri Power Plants | |
Ranked #3 out of 7 Missouri Water Power Plants | |
Fuel Types | Water |
Map of Osage Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Osage Dam.
Monthly Net Generation for Osage Dam
Osage Dam Details
Summary Information | |
---|---|
Plant Name | Osage Dam (2106) |
Plant Address | 617 River Road, Eldon, MO 65026 |
Utility | Union Electric Co - (MO) (19436) |
Latitude, Longitude | 38.2044, -92.6239 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | October 1931 |
Annual Generation | 176.1 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Osage River |
Ash Impoundment | |
Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE1 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE2 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE3 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE4 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE5 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE6 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 7 Details Operating October 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE7 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE7 |
Nameplate Capacity | 21.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 8 Details Operating October 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.OSAGE8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.OSAGE8 |
Nameplate Capacity | 21.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Osage Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#228 | Carmen Smith | McKenzie Bridge, OR | 188.6 GWh |
#229 | Lower Salmon | Hagerman, ID | 187.9 GWh |
#230 | Nantahala | Topton, NC | 186.1 GWh |
#231 | Kern River 3 | Kernville, CA | 184.5 GWh |
#232 | Balch 1 | Balch Camp, CA | 184.4 GWh |
#233 | Weiss Dam | Leesburg, AL | 183.2 GWh |
#234 | Pardee | Valley Springs, CA | 181.6 GWh |
#235 | Cheatham | Ashland City, TN | 177.3 GWh |
#236 | Charles E Monty | Lewiston, ME | 176.6 GWh |
#237 | Fremont Canyon | Alcova, WY | 176.3 GWh |
#239 | Little Falls (WA) | Ford, WA | 175.8 GWh |
#240 | New Martinsville Hannibal Hydro | New Martinsville, WV | 173.4 GWh |
#241 | Colton | Pierrepont, NY | 171.8 GWh |
#242 | Broken Bow Dam | Broken Bow, OK | 171.5 GWh |
#243 | Blue Mesa | Gunnison, CO | 171.0 GWh |
#244 | Gauley River Power Partners | Summersville, WV | 170.2 GWh |
#245 | Alder | La Grande, WA | 169.4 GWh |
#246 | Gulf Island | Lewiston, ME | 169.3 GWh |
#247 | School Street | Cohoes, NY | 168.9 GWh |
#248 | Cushman 2 | Shelton, WA | 168.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Osage Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Jefferson City | Jefferson City, MO | 22.4 GWh | 39.5 mi |
Black Oak Power Producers | Hartville, MO | 16.5 GWh | 67.8 mi |
Callaway | Fulton, MO | 10.3 TWh | 59.6 mi |
Columbia (MO) | Columbia, MO | 16.6 GWh | 55.1 mi |
Columbia Energy Center | Columbia, MO | 20.1 GWh | 59.6 mi |
Fairgrounds | Jefferson City, MO | 1.5 GWh | 34.6 mi |
Fulton (MO) | Fulton, MO | 206.0 MWh | 58.6 mi |
Harry Truman | Warsaw, MO | 232.3 GWh | 42.6 mi |
Lebanon Solar Farm (MO) | Lebanon, MO | 4.3 GWh | 37.2 mi |
Marshall (MO) | Marshall, MO | 1.7 GWh | 70.8 mi |
Marshall Solar Farm (MO) | Marshall, MO | 4.2 GWh | 69.2 mi |
McCartney | Strafford, MO | 96.1 GWh | 72.5 mi |
Moreau | Moreau, MO | 2.1 GWh | 37.2 mi |
MU Combined Heat and Power Plant | Columbia, MO | 194.1 GWh | 53.6 mi |
Niangua | Camdenton, MO | 1.7 GWh | 22 mi |
Noble Hill Landfill | Willard, MO | 1.8 GWh | 69.4 mi |
Rolla Solar Farm (MO) | Rolla, MO | 4.3 GWh | 51.6 mi |
Stockton Hydro | Stockton, MO | 35.0 GWh | 71.7 mi |
Truman Solar | Colombia, MO | 22.7 GWh | 55.9 mi |
Waynesville Solar Farm (MO) | Waynesville, MO | 4.6 GWh | 34.2 mi |