688 Orange Street, Bedford, VA 24523Plant Summary Information
Orange Street G1 is ranked #45 out of 64 distillate fuel oil power plants in Virginia in terms of total annual net electricity generation.
Orange Street G1 is comprised of 6 generators and generated 54.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Orange Street G1 |
---|---|
Utility Name | Town of Bedford - (VA) |
Location | Bedford County, VA |
Initial Operation Date | July 2005 |
Last Update | Dec 2023 |
Annual Generation | 211.0 MWh |
Annual Consumption | 1.6 k MMBtu |
Ranked #11,279 out of 11,835 Power Plants Nationwide | |
Ranked #644 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #194 out of 211 Virginia Power Plants | |
Ranked #45 out of 64 Virginia Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Orange Street G1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orange Street G1.
Monthly Net Generation for Orange Street G1
Orange Street G1 Details
Summary Information | |
---|---|
Plant Name | Orange Street G1 (63173) |
Plant Address | 688 Orange Street, Bedford, VA 24523 |
Utility | Town of Bedford - (VA) (1456) |
Latitude, Longitude | 37.33206, -79.51109 |
Generation Dates on File | Jan 2019 to Dec 2023 |
Initial Operation Date | July 2005 |
Annual Generation | 211.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | N/A |
Ash Impoundment | No |
Transmission / Distribution Owner | Town of Bedford - (VA) (1456) VA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating July 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator P1 Details Operating July 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator P2 Details Operating July 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator P3 Details Operating July 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator P4 Details Operating July 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator P5 Details Operating July 2017
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Blue Ridge |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Blue Ridge |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Orange Street G1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#634 | Merrimack | Bow, NH | 151.0 GWh |
#635 | Story City | Story City, IA | 233.0 MWh |
#636 | Mid-Georgia Cogeneration Facility | Kathleen, GA | 123.4 GWh |
#637 | Christiana | Wilmington, DE | 219.0 MWh |
#638 | Pleasant Hill | Pleasant Hill, IA | 16.8 GWh |
#639 | North Ninth Street | Rochelle, IL | 1.9 GWh |
#640 | Sullivan (IL) | Sullivan, IL | 214.0 MWh |
#641 | Stryker Creek | Jacksonville, TX | 1.1 TWh |
#642 | Eastside WWTP | High Point, NC | 213.0 MWh |
#643 | East Campus Utility Plant | Cincinnati, OH | 212.7 MWh |
#645 | Covington Facility | Covington, VA | 678.7 GWh |
#646 | Jasper | Hardeeville, SC | 4.9 TWh |
#647 | Muscatine Plant #1 | Muscatine, IA | 501.7 GWh |
#648 | Bridgewater Power LP | Bridgewater, NH | 109.2 GWh |
#649 | Epic Verona | Verona, WI | 2.4 GWh |
#650 | Winnetka | Winnetka, IL | 3.8 GWh |
#651 | Marshall (IL) | Marshall, IL | 202.0 MWh |
#652 | SC 1 Data Center, Phase 2 | Santa Clara, CA | 201.0 MWh |
#653 | Bloomington Power Plant | Bloomington, UT | 200.0 MWh |
#654 | Geneseo | Geneseo, IL | 7.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orange Street G1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altavista Power Station | Altavista, VA | 283.2 GWh | 19.7 mi |
Altavista Solar | Lynch Station, VA | 168.4 GWh | 15.6 mi |
Amherst Solar Facility (VA) | Amherst, VA | 2.0 GWh | 31.1 mi |
Bedford Solar | Bedford, VA | 4.9 GWh | 1.7 mi |
Cushaw | Warm Springs, VA | 12.0 GWh | 19.4 mi |
Depot Solar Center, LLC | Rustburg, VA | 29.0 GWh | 22 mi |
Georgia-Pacific Big Island | Big Island, VA | 53.8 GWh | 16.3 mi |
Leesville | Hurt, VA | 46.7 GWh | 17.5 mi |
Maplewood Solar | Climax, VA | 170.4 GWh | 32.3 mi |
Monroe Solar | Chatham, VA | 4.6 GWh | 33.1 mi |
Niagara | Vinton, VA | 8.0 GWh | 20.7 mi |
Reusens | Lynchburg, VA | 22.7 GWh | 20.1 mi |
Salem Electric Department | Salem, VA | 24.0 MWh | 30.9 mi |
Salem Street Dept | Salem, VA | 105.0 MWh | 29.6 mi |
Salem Water Plant | Salem, VA | 93.0 MWh | 31.3 mi |
Smith Mountain | Penhook, VA | 164.0 GWh | 20.1 mi |
Snowden | Big Island, VA | 14.0 GWh | 18.4 mi |
Sycamore Solar | Gretna, VA | 87.3 GWh | 32.1 mi |
Water Strider Solar | Nathalie, VA | 184.1 GWh | 34.4 mi |
Whitehorn Solar | Gretna, VA | 75.4 GWh | 28.9 mi |