Orange Coast College PH2 Solar Project
2701 Fairview Rd., Costa Mesa, CA 92626Plant Summary Information
Orange Coast College PH2 Solar Project is ranked #445 out of 786 solar farms in California in terms of total annual net electricity generation.
Orange Coast College PH2 Solar Project generated 1.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Orange Coast College PH2 Solar Project |
---|---|
Utility Name | Solar Star Coastal Pirate, LLC |
Location | Orange County, CA |
Initial Operation Date | May 2022 |
Last Update | Dec 2023 |
Annual Generation | 4.6 GWh |
Annual Consumption | 13.9 k MMBtu |
Ranked #7,868 out of 11,717 Power Plants Nationwide | |
Ranked #3,133 out of 5,541 Solar Power Plants Nationwide | |
Ranked #1,107 out of 1,555 California Power Plants | |
Ranked #445 out of 786 California Solar Power Plants | |
Fuel Types | Solar : 88.9% Electricity used for energy storage : 11.1% |
Map of Orange Coast College PH2 Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orange Coast College PH2 Solar Project.
Monthly Net Generation for Orange Coast College PH2 Solar Project
Orange Coast College PH2 Solar Project Details
Summary Information | |
---|---|
Plant Name | Orange Coast College PH2 Solar Project (65614) |
Plant Address | 2701 Fairview Rd. Costa Mesa, CA 92626 |
Utility | Solar Star Coastal Pirate, LLC (64905) |
Latitude, Longitude | 33.67257, -117.91246 |
Generation Dates on File | Jan 2023 to Dec 2023 |
Initial Operation Date | May 2022 |
Annual Generation | 4.6 GWh |
Fuel Types | Solar : 88.9% Electricity used for energy storage : 11.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 4.16 kV |
Energy Storage | Yes |
Generator OCCBA Details Operating May 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 1H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 4 |
---|---|
Maximum Charge Rate | 2 MW |
Maximum Discharge Rate | 2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1 |
Storage Enclosure Type | CS |
Load Management | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator OCCSP Details Operating May 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.1 MW |
Summer Capacity | 3 MW |
Winter Capacity | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 10 |
Tilt Angle | 10 |
DC Net Capacity | 4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.6 MW |
Virtual Net Metering Agreement | No |
Orange Coast College PH2 Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3123 | Frenchtown II Solar | Frenchtown, NJ | 4.1 GWh |
#3124 | Rockford Solar | Rockford, IL | 4.1 GWh |
#3125 | Pontiac | Pontiac, IL | 4.1 GWh |
#3126 | Exeter Solar | Exeter, CA | 4.1 GWh |
#3127 | Mendon | Mendon, MA | 4.1 GWh |
#3128 | Goldenrod Solar | Pamplico, SC | 4.1 GWh |
#3129 | Crawfordsville Solar Park 4 | Crawfordsville, IN | 4.1 GWh |
#3130 | Oak Leaf Solar XXXIII LLC (Lantz) | Salida, CO | 4.1 GWh |
#3131 | Prosperity Solar Farm CSG | Joplin, MO | 4.1 GWh |
#3132 | Gardner - Otter River Road | Gardner, MA | 4.1 GWh |
#3134 | Atood II | Cowpens, SC | 4.1 GWh |
#3135 | Rockford CS 2 | Rockford, IL | 4.1 GWh |
#3136 | Oxford | Oxford, MA | 4.1 GWh |
#3137 | AES Griggs Solar, LLC | Grant Park, IL | 4.1 GWh |
#3138 | Fennimore Solar | Fennimore, WI | 4.1 GWh |
#3139 | Blacktip Solar | Scranton, SC | 4.1 GWh |
#3140 | Fresno Solar | San Joaquin, CA | 4.1 GWh |
#3141 | Washington St Community Solar Farm #4 | Ogden, NY | 4.1 GWh |
#3142 | Sampson Solar | Roseboro, NC | 4.1 GWh |
#3143 | River Bend Solar, LLC | Reed Point, MT | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orange Coast College PH2 Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Alamitos Energy Center | Long Beach, CA | 2.5 TWh | 12.6 mi |
AES Alamitos LLC | Long Beach, CA | 535.8 GWh | 12.7 mi |
AES Huntington Beach Energy Project | Huntington Beach, CA | 2.6 TWh | 4.3 mi |
AES Huntington Beach LLC | Huntington Beach, CA | 161.9 GWh | 4.3 mi |
Anaheim Solar Energy Plant | Anaheim, CA | 3.1 GWh | 9 mi |
AT&T Anaheim | Anaheim, CA | 9.3 GWh | 11.3 mi |
ATT Kelvin | Irvine, CA | 7.6 GWh | 4.4 mi |
B Braun Medical | Irvine, CA | 30.6 GWh | 4.6 mi |
Barre Peaker | Stanton, CA | 22.6 GWh | 10.2 mi |
Bowerman Power LFG, LLC | Irvine, CA | 174.5 GWh | 12.5 mi |
Canyon Power Plant | Anaheim, CA | 94.4 GWh | 13.1 mi |
CSU Long Beach Lots 7 & 14 | Long Beach, CA | 7.2 GWh | 13.8 mi |
CSUF State College | Fullerton, CA | 1.6 GWh | 14.3 mi |
Haynes | Long Beach, CA | 2.7 TWh | 12.5 mi |
Hoag Hospital Cogen Plant | Newport Beach, CA | 6.6 GWh | 3.7 mi |
Kaiser East La Palma Ave. Fuel Cell | Anaheim, CA | 18.0 GWh | 12.9 mi |
Plant No 1 Orange County | Fountain Valley, CA | 42.7 GWh | 2.1 mi |
Plant No 2 Orange County | Huntington Beach, CA | 63.2 GWh | 3.2 mi |
Stanton Energy Reliability Center Hybrid | Stanton, CA | 2.4 GWh | 10.2 mi |
UCI Facilities Management Central Plant | Irvine, CA | 109.7 GWh | 4.1 mi |