Ontario LFGTE
3555 Post Farm Road, Stanley, NY 14561Plant Summary Information
Ontario LFGTE is ranked #15 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
Ontario LFGTE is comprised of 11 generators and generated 21.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ontario LFGTE |
---|---|
Utility Name | Seneca Energy II |
Location | Ontario County, NY |
Initial Operation Date | November 2003 |
Last Update | Dec 2023 |
Annual Generation | 78.4 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #3,449 out of 11,835 Power Plants Nationwide | |
Ranked #15 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #100 out of 832 New York Power Plants | |
Ranked #2 out of 16 New York Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Ontario LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ontario LFGTE.
Monthly Net Generation for Ontario LFGTE
Ontario LFGTE Details
Summary Information | |
---|---|
Plant Name | Ontario LFGTE (56250) |
Plant Address | 3555 Post Farm Road, Stanley, NY 14561 |
Utility | Seneca Energy II (17283) |
Latitude, Longitude | 42.8586, -77.0872 |
Generation Dates on File | Jan 2004 to Dec 2023 |
Initial Operation Date | November 2003 |
Annual Generation | 78.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 03-133-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City Water |
Ash Impoundment | No |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GEN1 Details Operating November 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2003 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating November 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2003 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating November 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2003 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating November 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2003 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating May 2005
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Generator GEN6 Details Operating May 2005
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Generator GEN7 Details Operating May 2005
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Generator GEN8 Details Operating November 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN10 Details Operating March 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN11 Details Operating March 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN9 Details Operating March 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Ontario LFGTE Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5 | Sunshine Gas Producers | Sylmar, CA | 115.9 GWh |
#6 | Loraine County Project | Oberlin, OH | 101.3 GWh |
#7 | Middlesex County Utilities Authority | Sayreville, NJ | 92.9 GWh |
#8 | Pine Tree Acres WM LFGTE | Lenox, MI | 89.9 GWh |
#9 | Seneca Energy | Seneca Falls, NY | 86.6 GWh |
#10 | Omega Hills Gas Recovery | Germantown, WI | 86.2 GWh |
#11 | Ameresco Ox Mountain | Half Moon Bay, CA | 84.0 GWh |
#12 | Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh |
#13 | Waste Management King George LFGTE | King George, VA | 80.9 GWh |
#14 | Metro Methane Recovery Facility | Mitchellville, IA | 78.8 GWh |
#16 | Ocean County Landfill | Manchester, NJ | 74.4 GWh |
#17 | High Acres Gas Recovery | Fairport, NY | 72.1 GWh |
#18 | Pine Tree Acres | Lenox Twp, MI | 69.8 GWh |
#19 | Kiefer Landfill | Sloughhouse, CA | 66.6 GWh |
#20 | Livingston Generating Facility | Pontiac, IL | 64.0 GWh |
#21 | Georgia LFG Richland Creek Plant | Buford, GA | 62.8 GWh |
#22 | Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh |
#23 | Sumpter Energy Associates | Belleville, MI | 58.0 GWh |
#24 | Concord Energy | Concord, NC | 57.5 GWh |
#25 | Wake County LFG Facility | Apex, NC | 57.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ontario LFGTE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aegis CSG | Canadaigua, NY | 3.3 GWh | 14.5 mi |
Canandaigua Solar Array | Canandaigua, NY | 2.4 GWh | 10 mi |
Canandaigua Westbrook Solar Array | Canandaigua, NY | 1.7 GWh | 10 mi |
Canoga Solar | Seneca Falls, NY | 8.2 GWh | 14.5 mi |
Cornell Geneva Solar Farm | Seneca, NY | 3.0 GWh | 2.9 mi |
Daum Solar | Rushville, NY | 5.7 GWh | 10.6 mi |
Donati Solar | Seneca Falls, NY | 3.3 GWh | 16.1 mi |
Finger Lakes Solar I | Geneva, NY | 3.0 GWh | 3.7 mi |
Greenidge Generation LLC | Dresden, NY | 624.1 GWh | 14.3 mi |
Henkel U.S. Operations Corporation | Geneva, NY | 1.5 GWh | 6.3 mi |
Hobart & William Smith College Gates Rd. | Geneva, NY | 2.8 GWh | 1.9 mi |
Route 14A CDG Solar North and South LLC | Geneva, NY | 6.3 GWh | 3.7 mi |
Seneca Energy | Seneca Falls, NY | 86.6 GWh | 13.4 mi |
Seneca Falls Hydroelectric Project | Seneca Falls, NY | 10.2 GWh | 15.7 mi |
State Route 14A Solar | Benton, NY | 8.1 GWh | 8.2 mi |
Strauss CSG | Geneva, NY | 3.4 GWh | 5.2 mi |
Waterloo Hydroelectric Project | Waterloo, NY | 3.8 GWh | 11.8 mi |
Yellow Mills Rd #1 Community Solar Farm | Farmington, NY | 3.0 GWh | 14.1 mi |
Yellow Mills Rd #2 Community Solar Farm | Farmington, NY | 3.0 GWh | 14 mi |
Yellow Mills Rd #3 Community Solar Farm | Farmington, NY | 3.0 GWh | 13.9 mi |