Omtanke Solar
1801 Volvo Car Drive, Ridgeville, SC 29472Plant Summary Information
Omtanke Solar is ranked #45 out of 111 solar farms in South Carolina in terms of total annual net electricity generation.
Omtanke Solar generated 2.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Omtanke Solar |
---|---|
Utility Name | DG South Carolina Solar, LLC |
Location | Berkeley County, SC |
Initial Operation Date | March 2020 |
Last Update | Dec 2023 |
Annual Generation | 10.4 GWh |
Annual Consumption | 36.9 k MMBtu |
Ranked #5,846 out of 11,835 Power Plants Nationwide | |
Ranked #1,490 out of 5,643 Solar Power Plants Nationwide | |
Ranked #96 out of 190 South Carolina Power Plants | |
Ranked #45 out of 111 South Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Omtanke Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Omtanke Solar.
Monthly Net Generation for Omtanke Solar
Omtanke Solar Details
Summary Information | |
---|---|
Plant Name | Omtanke Solar (63756) |
Plant Address | 1801 Volvo Car Drive, Ridgeville, SC 29472 |
Utility | DG South Carolina Solar, LLC (63450) |
Latitude, Longitude | 33.13371, -80.25372 |
Generation Dates on File | Mar 2020 to Dec 2023 |
Initial Operation Date | March 2020 |
Annual Generation | 10.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | QF20-163-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | South Carolina Public Service Authority (17543) SC |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator DGSC1 Details Operating March 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 6 MW |
Summer Capacity | 6 MW |
Winter Capacity | 6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 190 |
Tilt Angle | 20 |
DC Net Capacity | 8.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Omtanke Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1480 | Wedge | Goldsboro, NC | 10.5 GWh |
#1481 | Mill Pond Solar, LLC | Jamesville, NC | 10.5 GWh |
#1482 | SoINCPower6, LLC | Sunbury, NC | 10.5 GWh |
#1483 | Brainerd Airport | Brainerd, MN | 10.4 GWh |
#1484 | Beaker | Farmville, NC | 10.4 GWh |
#1485 | Hickory | Rose Hill, NC | 10.4 GWh |
#1486 | West Pemberton | Pemberton Twp, NJ | 10.4 GWh |
#1487 | Windsor Hwy 17 Solar | Windsor, NC | 10.4 GWh |
#1488 | Lane II Solar, LLC | Goldsboro, NC | 10.4 GWh |
#1489 | Penstemon Solar Project | Ellensburg, WA | 10.4 GWh |
#1491 | Harrison Solar, LLC | Roseboro, NC | 10.4 GWh |
#1492 | BRE NC Solar 3 | Oxford, NC | 10.3 GWh |
#1493 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#1494 | SunE CPS3 LLC | Somerset, TX | 10.3 GWh |
#1495 | OCI Alamo 3 LLC | San Antonio, TX | 10.3 GWh |
#1496 | Camas Solar Project | Ellensburg, WA | 10.3 GWh |
#1497 | SR Greenville I | Limestone, TN | 10.3 GWh |
#1498 | Organ Church Solar | Rockwell, NC | 10.3 GWh |
#1499 | Kalaeloa Solar Two | Honolulu, HI | 10.3 GWh |
#1500 | Bailey Farm LLC | Bailey, NC | 10.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Omtanke Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abbot Solar | Manning, SC | 3.9 GWh | 37.6 mi |
Berkeley County Landfill | Moncks Corner, SC | 2.5 GWh | 13 mi |
Bloom Solar | Summerton, SC | 3.7 GWh | 33.3 mi |
Bond Solar | Summerton, SC | 3.6 GWh | 34 mi |
Cameron Solar | Cameron, SC | 44.3 GWh | 40.1 mi |
Cameron Solar II | Cameron, SC | 7.9 GWh | 39.5 mi |
Colleton Solar Farm | Walterboro, SC | 2.7 GWh | 29.6 mi |
Cross | Cross, SC | 8.6 TWh | 18.3 mi |
Dorchester Biomass | Harleyville, SC | 152.3 GWh | 13.5 mi |
Hagood | Charleston Heights, SC | 23.3 GWh | 27.1 mi |
Huntley | Bowman, SC | 157.8 GWh | 26 mi |
Jefferies | Moncks Corner, SC | 247.6 GWh | 17 mi |
Kapstone | Charleston, SC | 372.9 GWh | 23.2 mi |
Palmetto Plains | Bowman, SC | 120.3 GWh | 29.3 mi |
Rowesville Rd Plant | Orangeburg, SC | 770.0 MWh | 40.2 mi |
Spillway | Pineville, SC | 11.8 GWh | 22.7 mi |
St Stephen | St. Stephen, SC | 205.8 GWh | 27.5 mi |
Substation 20 Plant | Orangeburg, SC | 122.0 MWh | 40 mi |
TWE Bowman Solar Project | Bowman, SC | 124.4 GWh | 27.8 mi |
Williams | Goose Creek, SC | 1.6 TWh | 20.5 mi |