Oltmans SCE at Jurupa
2825 E. Jurupa St, Ontario, CA 91761Plant Summary Information
Oltmans SCE at Jurupa is ranked #599 out of 747 solar farms in California in terms of total annual net electricity generation.
Oltmans SCE at Jurupa generated 554.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Oltmans SCE at Jurupa |
---|---|
Utility Name | California PV Energy LLC |
Location | San Bernardino County, CA |
Initial Operation Date | December 2013 |
Last Update | Dec 2022 |
Annual Generation | 2.2 GWh |
Annual Consumption | 8.1 k MMBtu |
Ranked #9,313 out of 11,249 Power Plants Nationwide | |
Ranked #4,128 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,302 out of 1,501 California Power Plants | |
Ranked #599 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Oltmans SCE at Jurupa
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oltmans SCE at Jurupa.
Monthly Net Generation for Oltmans SCE at Jurupa
Oltmans SCE at Jurupa Details
Summary Information | |
---|---|
Plant Name | Oltmans SCE at Jurupa (58582) |
Plant Address | 2825 E. Jurupa St Ontario, CA 91761 |
Utility | California PV Energy LLC (58540) |
Latitude, Longitude | 34.05, -117.59611 |
Generation Dates on File | Dec 2013 to Dec 2022 |
Initial Operation Date | December 2013 |
Annual Generation | 2.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-601 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
Oltmans SCE at Jurupa Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4118 | USS Water Town Solar LLC CSG | Waterville, MN | 2.2 GWh |
#4119 | Fresno Hoover High School Hybrid | Fresno, CA | 2.2 GWh |
#4120 | L'Oreal Piscataway | New Brunswick, NJ | 2.2 GWh |
#4121 | A Street 1 | Johnston, RI | 2.2 GWh |
#4122 | Forrest City- Prison Site | Forrest City, AR | 2.2 GWh |
#4123 | Novel Stavem Solar LLC CSG | Glenwood, MN | 2.2 GWh |
#4124 | Medford WWTP | Medford, NJ | 2.2 GWh |
#4125 | MA CS Uxbridge Community Solar | Uxbridge, MA | 2.2 GWh |
#4126 | Bonanza | Vernal, UT | 3.7 TWh |
#4127 | Bakersfield College Solar 01 | Bakersfield, CA | 2.2 GWh |
#4129 | WWRF Solar Plant | Rifle, CO | 2.2 GWh |
#4130 | CPS 1 Community Solar | Adkins, TX | 2.2 GWh |
#4131 | USS Lake Patterson Solar CSG | Cologne, MN | 2.2 GWh |
#4132 | Bakersfield Industrial PV 1 | Bakersfield, CA | 2.2 GWh |
#4133 | Rockville Solar II, LLC | Indianapolis, IN | 2.2 GWh |
#4134 | Brickyard Solar | Farmingdale, NJ | 2.2 GWh |
#4135 | Brookfield Wire Company | Brookfield, MA | 2.2 GWh |
#4136 | Strawberry Point DPC Solar | Strawberry Point, IA | 2.2 GWh |
#4137 | Calibrant Bakersfield LLC | Bakersfield, CA | 2.2 GWh |
#4138 | Milhurst Solar | Manalapan, NJ | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oltmans SCE at Jurupa.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Dulles | Jurupa Valley, CA | 3.3 GWh | 4.7 mi |
Foundation IE | Rancho Cucamonga, CA | 702.3 MWh | 4.5 mi |
Grapeland Hybrid | Rancho Cucamonga, CA | 10.8 GWh | 4.5 mi |
Kaiser Ontario | Ontario, CA | 6.5 GWh | 1.4 mi |
Mira Loma | Mira Loma, CA | 3.0 GWh | 4.2 mi |
Mira Loma Peaker | Ontario, CA | 30.2 GWh | 3.7 mi |
New-Indy Ontario Mill | Ontario, CA | 264.1 GWh | 3.2 mi |
Oltmans SCE at Champagne | Ontario, CA | 1.4 GWh | 3.7 mi |
PVN Milliken, LLC | Ontario, CA | 5.5 GWh | 1.9 mi |
Rancho Cucamonga Dist #1 | Rancho Cucamonga, CA | 3.5 GWh | 4.3 mi |
Solar Photovoltaic Project #06 | Ontario, CA | 881.6 MWh | 1.4 mi |
Solar Photovoltaic Project #08 | Ontario, CA | 1.1 GWh | 1.9 mi |
Solar Photovoltaic Project #09 | Ontario, CA | 798.1 MWh | 1.5 mi |
Solar Photovoltaic Project #23 | Fontana, CA | 1.8 GWh | 4.8 mi |
Solar Photovoltaic Project #32 | Ontario, CA | 1.7 GWh | 1.9 mi |
Solar Photovoltaic Project #33 | Ontario, CA | 1.0 GWh | 2 mi |
Starbucks - Evolution Fresh | Rancho Cucamonga, CA | 5.3 GWh | 4 mi |
SunE Rochester | Rancho Cucamonga, CA | 1.4 GWh | 4.4 mi |
SunE- E Philadelphia Ontario | Ontario, CA | 1.7 GWh | 3.7 mi |
Terra Francesco | Ontario, CA | 2.7 GWh | 0.9 mi |