Okeechobee Clean Energy Center
3193 NE 366th Trail, Okeechobee, FL 34972Plant Summary Information
Okeechobee Clean Energy Center is ranked #50 out of 11,979 power plants nationwide in terms of total annual net electricity generation.
Okeechobee Clean Energy Center is comprised of 4 generators and generated 2.9 TWh during the 3-month period between October 2024 to January 2025.
Plant Name | Okeechobee Clean Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Okeechobee County, FL |
Initial Operation Date | March 2019 |
Last Update | Jan 2025 |
Annual Generation | 11.0 TWh |
Annual Consumption | 76.2 M MMBtu |
Ranked #50 out of 11,979 Power Plants Nationwide | |
Ranked #9 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 307 Florida Power Plants | |
Ranked #4 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Okeechobee Clean Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Okeechobee Clean Energy Center.
Monthly Net Generation for Okeechobee Clean Energy Center
Okeechobee Clean Energy Center Details
Summary Information | |
---|---|
Plant Name | Okeechobee Clean Energy Center (60345) |
Plant Address | 3193 NE 366th Trail, Okeechobee, FL 34972 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.63417, -80.79111 |
Generation Dates on File | Mar 2019 to Jan 2025 |
Initial Operation Date | March 2019 |
Annual Generation | 11.0 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Upper Floridian Aquifer |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Florida Southeast Connection |
Generator 1A Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1B Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1C Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1ST Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 593.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 593.3 MW |
Winter Capacity | 593.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 531.1 MW |
Net Winter Capacity With Natural Gas | 511 MW |
Net Summer Capacity With Oil | 526.1 MW |
Net Winter Capacity With Oil | 449 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Okeechobee Clean Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | West County Energy Center | Loxahatchee, FL | 19.5 TWh |
#2 | Jack McDonough | Smyrna, GA | 17.7 TWh |
#3 | Barry | Bucks, AL | 14.2 TWh |
#4 | Hines Energy Complex | Bartow, FL | 12.5 TWh |
#5 | Crystal River | Crystal River, FL | 15.5 TWh |
#6 | Guernsey Power Station | Byesville, OH | 11.9 TWh |
#7 | H Allen Franklin Combined Cycle | Smiths, AL | 11.8 TWh |
#8 | Greensville County Power Station | Emporia, VA | 11.6 TWh |
#10 | Midland Cogeneration Venture | Midland, MI | 10.7 TWh |
#11 | Fort Myers | Ft. Myers, FL | 9.7 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 9.7 TWh |
#13 | Forney Energy Center | Forney, TX | 9.6 TWh |
#14 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 9.6 TWh |
#15 | Union Power Station | El Dorado, AR | 9.5 TWh |
#16 | Warren County | Front Royal, VA | 9.4 TWh |
#17 | Brunswick County Power Station | Freeman, VA | 9.4 TWh |
#18 | Sanford | DeBary, FL | 9.2 TWh |
#19 | York Energy Center | Delta, PA | 9.1 TWh |
#20 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Okeechobee Clean Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Bay Solar Energy Center | Sebastian, FL | 135.6 GWh | 23 mi |
Big Water | TBD, FL | 6.2 GWh | 13.3 mi |
Blue Cypress Solar Energy Center | Vero Beach, FL | 136.2 GWh | 15.6 mi |
Bluefield Preserve Solar | Okeechobee, FL | 150.1 GWh | 28 mi |
Buttonwood | Fort Pierce, FL | 31.5 GWh | 9.3 mi |
Fort Drum Energy Center | Vero Beach, FL | 125.0 GWh | 2.7 mi |
Fox Trail | Callahan, FL | 5.2 GWh | 16.3 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 127.7 GWh | 0.9 mi |
Grove | Vero Beach, FL | 146.6 GWh | 9.2 mi |
Honeybell | TBD, FL | 31.3 GWh | 9.3 mi |
Ibis | Palm Bay, FL | 152.9 GWh | 15.9 mi |
Indian River Solar Center | Vero Beach, FL | 143.0 GWh | 13.7 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 137.3 GWh | 23.4 mi |
Okeechobee Solar | Vero Beach, FL | 150.8 GWh | 0.3 mi |
Orange Blossom Solar Center | Vero Beach, FL | 149.1 GWh | 13.7 mi |
Palm Bay Solar | Palm Bay, FL | 143.0 GWh | 17.4 mi |
Pelican Solar Center | Ft. Pierce, FL | 153.0 GWh | 16.8 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.6 GWh | 27.8 mi |
Speckled Perch | TBD, FL | 6.7 GWh | 24.6 mi |
Turnpike | Vero Beach, FL | 173.6 GWh | 10.1 mi |