Okeechobee Clean Energy Center
3193 NE 366th Trail, Okeechobee, FL 34972Plant Summary Information
Okeechobee Clean Energy Center is ranked #10 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Okeechobee Clean Energy Center is comprised of 4 generators and generated 2.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Okeechobee Clean Energy Center |
---|---|
Utility Name | Florida Power & Light Co |
Location | Okeechobee County, FL |
Initial Operation Date | March 2019 |
Last Update | Aug 2024 |
Annual Generation | 11.1 TWh |
Annual Consumption | 76.9 M MMBtu |
Ranked #52 out of 11,835 Power Plants Nationwide | |
Ranked #10 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #6 out of 279 Florida Power Plants | |
Ranked #4 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Okeechobee Clean Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Okeechobee Clean Energy Center.
Monthly Net Generation for Okeechobee Clean Energy Center
Okeechobee Clean Energy Center Details
Summary Information | |
---|---|
Plant Name | Okeechobee Clean Energy Center (60345) |
Plant Address | 3193 NE 366th Trail, Okeechobee, FL 34972 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.63417, -80.79111 |
Generation Dates on File | Mar 2019 to Aug 2024 |
Initial Operation Date | March 2019 |
Annual Generation | 11.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Upper Floridian Aquifer |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Florida Southeast Connection |
Generator 1A Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1B Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1C Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 376.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 376.6 MW |
Winter Capacity | 376.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 376.6 MW |
Net Winter Capacity With Natural Gas | 376.6 MW |
Net Summer Capacity With Oil | 325.3 MW |
Net Winter Capacity With Oil | 346 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 1ST Details Operating March 2019
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 593.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 593.3 MW |
Winter Capacity | 593.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 531.1 MW |
Net Winter Capacity With Natural Gas | 511 MW |
Net Summer Capacity With Oil | 526.1 MW |
Net Winter Capacity With Oil | 449 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Okeechobee Clean Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | West County Energy Center | Loxahatchee, FL | 21.1 TWh |
#2 | Jack McDonough | Smyrna, GA | 18.3 TWh |
#3 | Crystal River | Crystal River, FL | 16.5 TWh |
#4 | H Allen Franklin Combined Cycle | Smiths, AL | 12.3 TWh |
#5 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#6 | Barry | Bucks, AL | 12.4 TWh |
#7 | Union Power Station | El Dorado, AR | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.5 TWh |
#9 | Hines Energy Complex | Bartow, FL | 11.3 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Okeechobee Clean Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Bay Solar Energy Center | Sebastian, FL | 139.4 GWh | 23 mi |
Blue Cypress Solar Energy Center | Vero Beach, FL | 139.6 GWh | 15.6 mi |
Bluefield Preserve Solar | Okeechobee, FL | 149.4 GWh | 28 mi |
Fort Drum Energy Center | Vero Beach, FL | 118.1 GWh | 2.7 mi |
FPL Cavendish Solar Energy Center | Okeechobee, FL | 135.8 GWh | 0.9 mi |
Grove | Vero Beach, FL | 148.6 GWh | 9.2 mi |
Ibis | Palm Bay, FL | 101.0 GWh | 15.9 mi |
Indian River Solar Center | Vero Beach, FL | 145.0 GWh | 13.7 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 138.9 GWh | 23.4 mi |
Lakeside Solar Center | Okeechobee, FL | 137.2 GWh | 29.2 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 134.8 GWh | 31.4 mi |
Okeechobee Solar | Vero Beach, FL | 156.1 GWh | 0.3 mi |
Orange Blossom Solar Center | Vero Beach, FL | 150.2 GWh | 13.7 mi |
Palm Bay Solar | Palm Bay, FL | 143.8 GWh | 17.4 mi |
Pelican Solar Center | Ft. Pierce, FL | 152.8 GWh | 16.8 mi |
Pineapple | Port St Lucie, FL | 111.5 GWh | 29.5 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.4 GWh | 27.8 mi |
Sundew | Port St Lucie, FL | 147.8 GWh | 29.6 mi |
Treasure Coast Energy Center | Ft. Pierce, FL | 1.8 TWh | 30.7 mi |
Turnpike | Vero Beach, FL | 118.6 GWh | 10.1 mi |