Ocoee 1
1988 Hwy 64 E, Benton, TN 37307Plant Summary Information
Ocoee 1 is ranked #43 out of 84 power plants in Tennessee in terms of total annual net electricity generation.
Ocoee 1 is comprised of 5 generators and generated 9.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Ocoee 1 |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Polk County, TN |
Initial Operation Date | January 1912 |
Last Update | Dec 2023 |
Annual Generation | 69.8 GWh |
Annual Consumption | 261.5 k MMBtu |
Ranked #3,558 out of 11,852 Power Plants Nationwide | |
Ranked #434 out of 1,371 Water Power Plants Nationwide | |
Ranked #43 out of 84 Tennessee Power Plants | |
Ranked #24 out of 28 Tennessee Water Power Plants | |
Fuel Types | Water |
Map of Ocoee 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ocoee 1.
Monthly Net Generation for Ocoee 1
Ocoee 1 Details
Summary Information | |
---|---|
Plant Name | Ocoee 1 (3412) |
Plant Address | 1988 Hwy 64 E, Benton, TN 37307 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 35.0947, -84.6478 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1912 |
Annual Generation | 69.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ocoee River |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating January 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating May 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating May 1912
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1912 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 5 Details Operating December 1914
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1914 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Ocoee 1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#424 | Rollins | Colfax, CA | 73.1 GWh |
#425 | Cornell | Chippewa Falls, WI | 72.9 GWh |
#426 | Grace | Grace, ID | 72.9 GWh |
#427 | Twin Cities Hydro LLC | St. Paul, MN | 71.6 GWh |
#428 | Copco 1 | Hornbrook, CA | 71.4 GWh |
#429 | Swan Lake | Ketchikan, AK | 70.6 GWh |
#430 | Pejepscot Hydroelectric Project | Topsham, ME | 70.6 GWh |
#431 | Lloyd Shoals | Jackson, GA | 70.3 GWh |
#432 | Madison Dam | Ennis, MT | 69.9 GWh |
#433 | Nimbus | Folsom, CA | 69.9 GWh |
#435 | Blake | Parishville, NY | 69.8 GWh |
#436 | Hydro Kennebec Project | Winslow, ME | 69.6 GWh |
#437 | Mojave Siphon | Hesperia, CA | 69.6 GWh |
#438 | E J West | Lake Luzerne, NY | 69.4 GWh |
#439 | Deer Rips | Auburn, ME | 69.3 GWh |
#440 | Robbs Peak | Fresh Pond, CA | 69.1 GWh |
#441 | San Francisquito 2 | Saugus, CA | 69.0 GWh |
#442 | Deferiet | Deferiet, NY | 68.6 GWh |
#443 | Alcova | Alcova, WY | 68.1 GWh |
#444 | French Meadows | Foresthill, CA | 67.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ocoee 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachia | Reliance, TN | 435.9 GWh | 20.5 mi |
Blue Ridge | Blue Ridge, GA | 21.2 GWh | 25.3 mi |
Carters | Chatsworth, GA | 6.0 GWh | 33.4 mi |
Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.4 GWh | 32.1 mi |
Chickamauga | Chattanooga, TN | 657.3 GWh | 32.9 mi |
CS Murphy Point, LLC | Murphy, NC | 1.2 GWh | 28.2 mi |
Dalton 2 | Dalton, GA | 8.6 GWh | 30.6 mi |
Hiwassee Dam | Murphy, NC | 224.0 GWh | 26.9 mi |
Martins Creek Solar NC, LLC | Murphy, NC | 1.1 GWh | 36.1 mi |
Mission | Murphy, NC | 7.8 GWh | 40.9 mi |
Murphy Farm Power, LLC | Culberson, NC | 1.2 GWh | 28.5 mi |
Murray Treadwell Farms | Chatsworth, GA | 6.4 GWh | 24.3 mi |
Nottely | Blairsville, GA | 18.6 GWh | 33 mi |
Ocoee 2 | Benton, TN | 80.7 GWh | 8.9 mi |
Ocoee 3 | Benton, TN | 141.4 GWh | 9.4 mi |
Sequoyah | Soddy Daisy, TN | 16.6 TWh | 26.7 mi |
Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh | 30.7 mi |
Volkswagen Solar System | Chattanooga, TN | 11.5 GWh | 27.1 mi |
Watts Bar Hydro | Spring City, TN | 812.4 GWh | 37.1 mi |
Watts Bar Nuclear Plant | Spring City, TN | 19.1 TWh | 36 mi |