Ocoee 1 is ranked #43 out of 84 power plants in Tennessee in terms of total annual net electricity generation.

Ocoee 1 is comprised of 5 generators and generated 9.2 GWh during the 3-month period between September 2023 to December 2023.

Plant NameOcoee 1
Utility NameTennessee Valley Authority
LocationPolk County, TN
Initial Operation DateJanuary 1912
Last Update Dec 2023
Annual Generation 69.8 GWh
Annual Consumption 261.5 k MMBtu
Ranked #3,567 out of 11,866 Power Plants Nationwide
Ranked #433 out of 1,369 Water Power Plants Nationwide
Ranked #43 out of 84 Tennessee Power Plants
Ranked #24 out of 28 Tennessee Water Power Plants
Fuel Types Water

Map of Ocoee 1

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ocoee 1.

Create Your Account Today

Monthly Net Generation for Ocoee 1

16k16k12k12k8k8k4k4k002001200120022002200320032004200420052005200620062007200720082008200920092010201020112011201220122013201320142014201520152016201620172017201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Ocoee 1 Details

Summary Information
Plant NameOcoee 1 (3412)
Plant Address1988 Hwy 64 E, Benton, TN 37307
UtilityTennessee Valley Authority (18642)
Latitude, Longitude35.0947, -84.6478
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateJanuary 1912
Annual Generation 69.8 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityTennessee Valley Authority (TVA)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceOcoee River
Ash Impoundment
Transmission / Distribution OwnerTennessee Valley Authority (18642) TN
Grid Voltage 69.00 kV
Energy StorageNo

Generator 1 Details Operating January 1912

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity3.8 MW
Nameplate Power Factor0.8
Summer Capacity4.8 MW
Winter Capacity4.8 MW
Minimum Load2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1912
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 2 Details Operating January 1912

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity3.8 MW
Nameplate Power Factor0.8
Summer Capacity4.8 MW
Winter Capacity4.8 MW
Minimum Load2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1912
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 3 Details Operating May 1912

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity3.8 MW
Nameplate Power Factor0.8
Summer Capacity4.8 MW
Winter Capacity4.8 MW
Minimum Load2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 1912
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 4 Details Operating May 1912

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity3.8 MW
Nameplate Power Factor0.8
Summer Capacity4.8 MW
Winter Capacity4.8 MW
Minimum Load2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 1912
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 5 Details Operating December 1914

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity3.8 MW
Nameplate Power Factor0.8
Summer Capacity4.8 MW
Winter Capacity4.8 MW
Minimum Load2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1914
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Ocoee 1 Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#423RollinsColfax, CA73.1 GWh
#424CornellChippewa Falls, WI72.9 GWh
#425GraceGrace, ID72.9 GWh
#426Twin Cities Hydro LLCSt. Paul, MN71.6 GWh
#427Copco 1Hornbrook, CA71.4 GWh
#428Swan LakeKetchikan, AK70.6 GWh
#429Pejepscot Hydroelectric ProjectTopsham, ME70.6 GWh
#430Lloyd ShoalsJackson, GA70.3 GWh
#431Madison DamEnnis, MT69.9 GWh
#432NimbusFolsom, CA69.9 GWh
#434BlakeParishville, NY69.8 GWh
#435Hydro Kennebec ProjectWinslow, ME69.6 GWh
#436Mojave SiphonHesperia, CA69.6 GWh
#437E J WestLake Luzerne, NY69.4 GWh
#438Deer RipsAuburn, ME69.3 GWh
#439Robbs PeakFresh Pond, CA69.1 GWh
#440San Francisquito 2Saugus, CA69.0 GWh
#441DeferietDeferiet, NY68.6 GWh
#442AlcovaAlcova, WY68.1 GWh
#443French MeadowsForesthill, CA67.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Ocoee 1.

Plant NamePlant LocationAnnual GenerationDistance
ApalachiaReliance, TN435.9 GWh20.5 mi
Blue RidgeBlue Ridge, GA21.2 GWh25.3 mi
CartersChatsworth, GA13.3 GWh33.4 mi
Chattanooga Metropolitan Airport SolarChattanooga, TN2.4 GWh32.1 mi
ChickamaugaChattanooga, TN657.3 GWh32.9 mi
CS Murphy Point, LLCMurphy, NC1.2 GWh28.2 mi
Dalton 2Dalton, GA8.6 GWh30.6 mi
Hiwassee DamMurphy, NC232.2 GWh26.9 mi
Martins Creek Solar NC, LLCMurphy, NC1.1 GWh36.1 mi
MissionMurphy, NC7.8 GWh40.9 mi
Murphy Farm Power, LLCCulberson, NC1.2 GWh28.5 mi
Murray Treadwell FarmsChatsworth, GA6.4 GWh24.3 mi
NottelyBlairsville, GA18.6 GWh33 mi
Ocoee 2Benton, TN80.7 GWh8.9 mi
Ocoee 3Benton, TN141.4 GWh9.4 mi
SequoyahSoddy Daisy, TN15.1 TWh26.7 mi
Thomas A Smith Energy FacilityDalton, GA8.5 TWh30.7 mi
Volkswagen Solar SystemChattanooga, TN11.7 GWh27.1 mi
Watts Bar HydroSpring City, TN812.4 GWh37.1 mi
Watts Bar Nuclear PlantSpring City, TN19.1 TWh36 mi