Ocean County Landfill
2498 Route 70, Manchester, NJ 8733Plant Summary Information
Ocean County Landfill is ranked #16 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
Ocean County Landfill is comprised of 12 generators and generated 16.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Ocean County Landfill |
---|---|
Utility Name | EPP Renewable Energy |
Location | Ocean County, NJ |
Initial Operation Date | February 1997 |
Last Update | Aug 2024 |
Annual Generation | 74.4 GWh |
Annual Consumption | 851.3 k MMBtu |
Ranked #3,491 out of 11,835 Power Plants Nationwide | |
Ranked #16 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #27 out of 378 New Jersey Power Plants | |
Ranked #2 out of 5 New Jersey Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operator |
LES Project Holdings LLC (2013 to 2020) EPP Renewable Energy (2021 to 2023) |
Map of Ocean County Landfill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ocean County Landfill.
Monthly Net Generation for Ocean County Landfill
Ocean County Landfill Details
Summary Information | |
---|---|
Plant Name | Ocean County Landfill (54980) |
Plant Address | 2498 Route 70, Manchester, NJ 8733 |
Utility | EPP Renewable Energy (57249) |
Latitude, Longitude | 40.02494, -74.25014 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | February 1997 |
Annual Generation | 74.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 95-277-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Jersey Central Power & Lt Co (9726) NJ |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator UNT1 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1997 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT2 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1997 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT3 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1997 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT4 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1997 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT5 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1997 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT6 Details Operating February 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1997 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT10 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT11 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT12 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT7 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT8 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator UNT9 Details Operating June 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Ocean County Landfill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6 | Loraine County Project | Oberlin, OH | 101.3 GWh |
#7 | Middlesex County Utilities Authority | Sayreville, NJ | 92.9 GWh |
#8 | Pine Tree Acres WM LFGTE | Lenox, MI | 89.9 GWh |
#9 | Seneca Energy | Seneca Falls, NY | 86.6 GWh |
#10 | Omega Hills Gas Recovery | Germantown, WI | 86.2 GWh |
#11 | Ameresco Ox Mountain | Half Moon Bay, CA | 84.0 GWh |
#12 | Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh |
#13 | Waste Management King George LFGTE | King George, VA | 80.9 GWh |
#14 | Metro Methane Recovery Facility | Mitchellville, IA | 78.8 GWh |
#15 | Ontario LFGTE | Stanley, NY | 78.4 GWh |
#17 | High Acres Gas Recovery | Fairport, NY | 72.1 GWh |
#18 | Pine Tree Acres | Lenox Twp, MI | 69.8 GWh |
#19 | Kiefer Landfill | Sloughhouse, CA | 66.6 GWh |
#20 | Livingston Generating Facility | Pontiac, IL | 64.0 GWh |
#21 | Georgia LFG Richland Creek Plant | Buford, GA | 62.8 GWh |
#22 | Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh |
#23 | Sumpter Energy Associates | Belleville, MI | 58.0 GWh |
#24 | Concord Energy | Concord, NC | 57.5 GWh |
#25 | Wake County LFG Facility | Apex, NC | 57.9 GWh |
#26 | Mill Seat Renewable Energy Facility | Bergen, NY | 52.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ocean County Landfill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayville Central Facility | Bayville, NJ | 2.9 GWh | 8.8 mi |
Brickyard Solar | Farmingdale, NJ | 1.8 GWh | 12.4 mi |
CentraState Medical Center PV Facility | Freehold, NJ | 3.6 GWh | 15.1 mi |
EDF Ph1 Toms River | Tom's River, NJ | 34.8 GWh | 2.9 mi |
Forked River | Forked River, NJ | 2.1 GWh | 14.6 mi |
French's Landfill PV | Brick, NJ | 5.0 GWh | 8.6 mi |
Howell Solar | Howell, NJ | 10.1 GWh | 9.5 mi |
Jackson Board of Education-Liberty HS | Jackson, NJ | 1.7 GWh | 4.7 mi |
Jackson Legler Solar 1 LLC | Jackson Township, NJ | 4.7 GWh | 6 mi |
KDC Solar PR1, LLC | Jackson, NJ | 27.0 GWh | 12.6 mi |
Lakehurst Solar | Lakehurst, NJ | 15.9 GWh | 3.3 mi |
Lakewood Cheddar School | Lakewood, NJ | 751.0 MWh | 4.9 mi |
NAEA Lakewood LLC | Lakewood, NJ | 245.5 GWh | 5 mi |
NAEA Ocean Peaking Power LLC | Lakewood, NJ | 232.6 GWh | 5.1 mi |
NES Rutgers Solar | Lakewood, NJ | 583.0 MWh | 5.7 mi |
Rock Solid | Howell, NJ | 12.8 GWh | 14.2 mi |
Spano Solar - Belmar Wall | Belmar, NJ | 2.6 GWh | 13.7 mi |
Spano Solar - Ocean County Landfill - CS | Manchester Township, NJ | 4.5 GWh | 0 mi |
Tom's River (Lowes) | Toms River, NJ | 1.2 GWh | 4.8 mi |
Toms River CSG | Toms River, NJ | 1.4 GWh | 2.7 mi |